Loading...
HomeMy WebLinkAboutMINUTES - 05081990 - 1.15 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: May 8, 1990 SUBJECT: APPROVING DRAINAGE AREA 30A LINE A PROJECT Project No.: 7557-6D8448-88, Oakley, Area. CP# 89-12 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE Project and FIND, on the basis of the initial study and all comments received, that there is no substantial evidence that the project will have a significant effect on the environment, ADOPT the Negative Declaration, and DIRECT the Chief Engineer to begin right-of-way acquisition and to prepare contract plans and specifications for construction. DIRECT the Director of Community Development to file a Notice of Determination with the County Clerk. II. Financial Impact: The estimated project cost if $510,300.00, funded by Drainage Area 30A funds (100%). III. Reasons for Recommendations and Background: The project is needed to improve flood protection to the area draining into the Drainage Area 30A detention basin. Continued on Attachment: X SIGNATURE: �1 _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON MAY 8 1990 APPROVED AS RECOMMENDED OTHER A VOTE OF SUPERVISORS V' UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the EJS:drg Board of SupervL--an the date 90w'. d\BO:8.t5 ATTESTED: —NAT PHIL BATCHELOR,cierk of the Board Orig. Div: Public Works (DESIGN DIVISION) of Supe"W80rs and County Administrator cc: County Administrator PW Road Engineering or Community Development Attn: G. Almquist APPROVING DRAINAGE AREA 30A LINE A PROJECT May 8, 1990 Page Two III. Reasons for Recommendations and Background Cont'd: The project has been determined to be in compliance with the General Plan. A negative Declaration of environmental significance pertaining to this project was published April 21, 1989 with no protest, and the Board has considered the negative declaration together with all comments received during the public review period. IV. Consequences of Negative Action: Delay in approving the project will result in a delay of design and construction and may jeopardize funding.