HomeMy WebLinkAboutMINUTES - 05221990 - 1.3 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: May 22, 1990
SUBJECT: Joint Exercise of Powers Agreement with the City of Richmond for the Construction of
Section II & III of the Richmond Parkway
Project No.: 0662-6R4183
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
Approve and authorize the Chair of the Board of Supervisors to execute the joint exercise of
Powers Agreement with the City of Richmond for the construction of Sections II & III of the
Richmond Parkway.
II. Financial Impact:
The project is estimated to cost $1,943,800. The funding will be provided,by the Contra Costa
Transportation Authority as a Measure T" project.
Ill. Reasons for Recommendations and Background:
The Richmond Parkway, as proposed, will consist of approximately 7.3 miles of limited access
4 lane facility which will link Interstate 80 north of Hilltop Drive at a new interchange on Altas
Road, south to Interstate 580 near Canal Boulevard and Castro Street. The Parkway project has
been broken up into several sections. This project constitutes the construction of Section II &
III. Several years ago the County had a project that placed the embankment fill and constructed
the bridges for Sections II &. III. This project will be the completion of the fill work, drainage
work, and the paving for Sections ll & III. The County has performed the design work and the
City of Richmond will administer the construction of the project. Measure "C" has identified
$70,000,000 for-the Richmond Parkway. The Transportation Committee reviewed this item on
May 21, 1990.
Continued on Attachment: X SIGNATURE:
d, 4w"-�
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON MAY 2 2 1990 APPROVED AS RECOMMENDED OTHER —
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
JMW:RMA:gm I hereby certify that this is a tru6 and correct copy of
a:B022.t5 an action taken and entered on the minutes of the
Orig. Div: Public Works (RE) Board of Supe rvt t�9 da� kgHm.
cc: Director of Community Development ATTESTED: f `y�((J�
County Administrator PHIL BATCHELOR,Clerk of the Board
County Counsel of Sup"sors and County Administrator
City of Richmond (via P/VVI
Auditor Controller -
Accounting, Public Works —• — � t` ----• Deputy
Design, Public Works
Construction, Public Works
Joint Exercise of Powers Agreement
With City of Richmond
May 22, 1990
Page 2
IV. Consequences of Negative Action:
Without approval of a Joint Exercise of Powers Agreement the project will not be constructed
and there may be a possible loss of Measure "C" funds.