HomeMy WebLinkAboutMINUTES - 05011990 - 1.3 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: May 1, 1990
SUBJECT: APPROVE PERMIT APPLICATION FOR THE BAY CONSERVATION AND DEVELOPMENT
COMMISSION FOR THE REHABILITATION OF AVON BRIDGE.
Project No.: 0662-6R4089-90
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the chair of the Board of Supervisors to sign the permit application;
AUTHORIZE the Public Works Director to act as County Representative for the Bay Conservation
and Development Commission permit application; and
AUTHORIZE the Auditor Controller to draw a check in the amount of $100 payable to the Bay
Conservation and Development Commission upon request from the Public Works Director.
II. Financial lmpact:
The permit application fee is $100.00. It is to be funded from County Road funds (100%).
III. Reasons for Recommendations and Background:
The Avon Bridge on Waterfront Road is in need of repair. The bridge deck has deteriorated
severely and the bridge rails do not meet specifications. The rehabilitation is necessary to
improve safety for the users of the bridge and insure continued access across Pacheco Slough.
The bridge lies within the Bay Conservation & Development Commission jurisdiction and the
permit is required to do the repairs.
Continued on Attachment: X SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON IWA I I IJJU APPROVED AS RECOMMENDED _.._. OTHER
VOTE OF SUPERVISORS
✓ UNANIMOUS (ABSENT I )
AYES: NOES:
ABSENT: ABSTAIN: I hereby certiy that ttls is a true and correct copy of
an action taken and entered on the minutes of the
BB:drg Board of Supervisors on the date shown.
BOA A5 ATTESTEM _MAY 1 1ggn
PHIL BATCHELOR,Clerk of the Board
Orig. Div: Public Works (Design) of 8uperyisore and Co my Administrator
cc: County Admin. or &LUA .Deputy
Auditor-Controller (Via PW)
PW Accounting
Road Engineering
PE?A:9JTl PPLICATION FOR THE BAY CONSERVATION AND DEVELOPMENT COMMISSION FOR THE
REHABILITATION OF AVON BRIDGE.
May 1, 1990
Page Two
N. Consequences of Negative Action:
Without the Bay Conservation & Development Commission permit the rehabilitation of Avon
Bridge cannot proceed.