Loading...
HomeMy WebLinkAboutMINUTES - 04101990 - 1.14 TO: BOARD OF SUPERVISORS, AS GOVERNING BOARD OF CONTRA COSTA COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: APRIL 10, 1990 SUBJECT: AUTHORIZE LANDSCAPING OF DETENTION BASINS, OAKLEY AREA SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: AUTHORIZE the Chief Engineer to complete final grading, installation of irrigation facilities, and landscaping for the following detention basins in the Oakley area: a. Del Antico Basin, Drainage Area 29E b. Housing Authority Basin, Drainage Area 29E C. Laurel Drive Basin, Drainage Area 30A d. Teakwood Basin, Drainage Area 29C II. Financial Impact: The estimated cost for all of the work at the four basin sites is estimated to be $120,000. Each drainage entity will be charged for their actual costs. III. Reasons for Recommendations and Background: The immediate capital improvements to drain the detention basins have been met. It now is important to landscape the basins to improve their appearance and acceptance within the community. The work shall consist of finish grading to shape the basins and spread the topsoil deposited as a part of the Lindsey Channel project; to secure domestic water for each site for irrigating the new trees, and to plant trees on the basin banks. / C Continued on Attachment: SIGNATURE: _ RECOMMENDATION OF COUNTY ADMINISTRATOR / RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON APR 10 1990 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: 1 hereby certify that this is a true and correct copy of an action taken ano entered on the minut" of the a:bo1 Board of Superyigprs on the date shown. a:bo10.t4 ATTESTED: g90 PHIL BATCHELOR.Cierk of the Board Orig. DIV: Public Works (FC) of Supervisors and Countv Administrator cc: See Page Two �, Y,��II,�� -- �;D„�,_ ., put,► Landscaping of Detention Basins April 10, 1990 Page Two To the maximum extent possible volunteer labor will be used. Prior to planting, a neighborhood meeting will be held at each site to discuss the proposed species of plants to be installed. The landscaping plans will be made compatible with potential future use of each site for park purposes. A Negative Declaration was completed for each basin site at the time of inital construction. IV. Consequences of Negative Action: The basins will remain barren. cc: County Admin. Office County Counsel Auditor-Controller Community Development OMAC (via PW) Public Works Flood Control Engr. Maintenance Accounting