TO: BOARD OF SUPERVISORS AS GOVERNING BODY CONTRA COSTA COUNTY FLOOD
CONTROL AND WATER CONSERVATION CORPS
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: APRIL 10, 1990
SUBJECT: APPROVE AND AUTHORIZE THE CHIEF ENGINEER TO EXECUTE AN AGREEMENT
WITH THE CALIFORNIA CONSERVATION CORPS FOR INSTALLATION OF MITIGATION
LANDSCAPING AND APPURTENANCES FOR THE WILDCAT AND SAN PABLO CREEKS
REACH 1 PROJECT, FLOOD CONTROL ZONE 7, AND DRAINAGE AREA 73.
Project No.: 7527-TX8187, 7567-TX8187
SPECIFIC REQUEST(S)OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chief Engineer to execute an agreement with the California
Conservation Corps on behalf of the Flood Control District.
II. Financial lmpact:
By the terms of the agreement the California Conservation Corps (CCC) will provide supervised
labor at an hourly rate paid by the Flood Control District. The payment limit will not exceed
$130,000.00 without the written approval of the Chief Engineer. The Flood Control District's
(District) costs are 95 percent reimbursable by the U. S. Army Corps of Engineers (Corps).
III. Reasons for Recommendations and Background:
The establishment of mitigation landscaping is a requirement of the Wildcat and San Pablo
Creeks Reach 1 Project. On September 19, 1989 the Board of Supervisors approved an
agreement with the Corps giving the District responsibility for implementing the required
Continued on Attachment: X SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR 7YOMMEN15ATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON APR 10 1990 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify that this Is a true and correct copy of
an action taken ano entered on the minutes of the
d\bo:1 Board of Supe rv►g� on f the date shown.
\bo: 0.t4 ATTESTED: HH 11 0 o
PHIL BATCHELOR,Clerk of the Loard
Orig. Div.: Public Works (Design Division) of Supervisors and County Administrator
CC: SEE NEXT PAGE �J / Jill7J�,A l.-�AA -.ceputy
... .,
APPROVE & AUTHORIZE AGREEMENT WITH THE CALIFORNIA CONSERVATION CORPS
April 10, 1990
Page Two
III. Reasons for Recommendations and Background - Cont'd:
mitigation landscaping and assuring federal reimbursement of 95 percent of the District's
landscaping costs. The intent of the September 19, 1989 agreement was to provide the District
with the flexibility of using the California Conservation Corps (CCC) for installing plants and non-
pressurized irrigation equipment. The subject agreement implements the use of the CCC for
landscaping and outlines the responsibilities of the parties.
IV. Consequences of Negative Action:
Without this agreement the District will have to pursue alternative labor sources.
CC: County Administration
Attn: E. Kuevor
Auditor/Controller
Community Development
Attn: G. Almquist
PW Accounting
Construction
TO: BOARD OF SUPERVISORS AS GOVERNING BODY CONTRA COSTA COUNTY FLOOD
CONTROL AND WATER CONSERVATION CORPS
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: APRIL 10, 1990 .
SUBJECT: APPROVE AND AUTHORIZE THE CHIEF ENGINEER TO EXECUTE AN AGREEMENT
WITH THE SAN MATEO CONSERVATION CORPS FOR INSTALLATION OF MITIGATION
LANDSCAPING AND APPURTENANCES FOR THE WILDCAT AND SAN PABLO CREEKS
REACH 1 PROJECT, FLOOD CONTROL ZONE 7, AND DRAINAGE AREA 73.
Project No.: 7527-TX8187, 7567-TX8187
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chief Engineer to execute an agreement with the San Mateo
Conservation Corps on behalf of the Flood Control District.
II. Financial lmpact:
By the terms of the agreement the San Mateo Conservation Corps (SMCC) will provide
supervised labor at an hourly rate paid by the Flood Control District. The payment limit will not
exceed $40,000.00 without the written approval of the Chief Engineer. The Flood Control
District's (District) costs are 95 percent reimbursable by the U. S. Army Corps of Engineers
(Corps).
III. Reasons for Recommendations and Background:
The establishment of mitigation landscaping is a requirement of the Wildcat and San Pablo
Creeks Reach 1 Project. On September 19, 1989 the Board of Supervisors approved an
agreement with the Corps giving the District responsibility for implementing the required
Continued on Attachment: X SIGNATURE
RECOMMENDATION OF COUNTY ADMINISTRATOR ECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON APR 10 1990 APPROVED AS RECOMMENDED_X__ OTHER
VOTE OF SUPERVISORS
X UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify that this Is a tru6 and correct copy of
an action taken and entered on the minutes of the
GC:drg Board of ` n Supervl he date shown.
d\bo:10.t4 ATTESTED: A0 1990
PHIL BATCHELOR,Clerk of the board
Orig. Div.: Public Works (Design Division) of Supervisors and Countv Administrator
CC: SEE NEXT PAGE ^
/-138
APPROVE & AUTHORIZE AGREEMENT WITH THE SAN MATEO CONSERVATION CORPS
April 10, 1990
Page Two
III. Reasons for Recommendations and Background - Cont'd:
mitigation landscaping and assuring federal reimbursement of 95 percent of the District's
landscaping costs. The intent of the September 19, 1989 agreement was to provide the District
with the flexibility of using the San Mateo Conservation Corps (SMCC) for installing plants and
non-pressurized irrigation equipment. The subject agreement implements the use of the SMCC
for landscaping and outlines the responsibilities of the parties.
IV. Consequences of Negative Action:
Without this agreement the District will have to pursue alternative labor sources.