Loading...
HomeMy WebLinkAboutMINUTES - 03061990 - 1.19 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: March 6, 1990 SUBJECT: Soil Excavation Agreement - West Antioch Creek Project No.: 7579-6D8485 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION I. Recommended Action: As governing body of the Contra Costa County Flood Control and Water Conservation District, approve soil excavation agreement for West Antioch Creek with Double D Transportation Company, Inc., and authorize the Chief Engineer to sign the agreement on behalf of the District. II. Financial Impact: The agreement commits the District to pay the Contractor $2.00 per cubic yard for the removal of 18,500 cubic yards of soil material from West Antioch Creek. The fund source is Drainage Area 55. III. Reasons for Recommendations and Background: This contract agreement commits the District to pay the Contractor the sum of $2.00 per cubic yard of material removed from the project area. The contracted price of $2.00 per cubic yard would triple if the.District had to remove this material under a different type of contract. The ultimate channel design requires that this material be removed. The best price to the District can, be achieved where immediate commitments and/or long term planning operations can be coordinated with the demand in the surrounding geographical area. The District contracted for the removal of the material on an informal bid basis. Continued on Attachment: SIGNATURE: r RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON MAR 6 1990 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS X UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: I hereby certify that ttJs Is a true and correct copy of PMcan action taken and entered on the minuteu of the kbo.an:pC Board of Supers on the date shown. A:bo.ant ATTESTED: 6 1990 Orig. Div: Public Works (Mtc) PHIL BATCHELOR,Clerk of the Board cc: County Administrator OtBupervlsoraand CountvAdministrator Auditor-Controller �D�� � Design -/o �Bdt_r___ puts PW Accounting Contractor SOIL EXCAVATION AGREEMENT - WEST ANTIOCH CREEK March 6, 1990 Page Two IV. Consequences of Negative Action: If the award is delayed, there is a risk that the soil material will not be in demand when the. District wishes it removed. This would result in an increased cost to the District.