HomeMy WebLinkAboutMINUTES - 03061990 - 1.18 w
TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA
COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: MARCH 6, 1990
SUBJECT: Authorize the Issuance of a Warrant to the U. S. Army Corps of Engineers, for the
Wildcat and San Pablo Creeks Project, Flood Control Zone No. 7 and Drainage Area
73
Project No.: #7527-6D8686, #7567-6D8686
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
I. Recommended Action:
AUTHORIZE the County Auditor-Controller to issue a warrant in the amount of $390,000.00
payable to the Finance and Accounting Officer, USAED, Sacramento, as the District's share
of contributed funds other costs, for the period January 1990 through March 1990, for the
Wildcat and San Pablo Creeks Project. The warrant shall be prepared with reference numbers
and in an amount as follows:
Cost Account #96X8862-FW197 for $390,000.00
II. Financial Impact:
At this time the Flood Control District is required to make second quarter FY 1990 payments
for the Wildcat and San Pablo Creeks Project as follows:
5 percent required project cost $ -0-
Contributed funds other (relocations) 390,000.00
TOTAL $390,000.00
Continued on Attachment: X SIGNATURE: % s
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON MAR 6 1990 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
_UNANIMOUS (ABSENT I� )
AYES: NOES:
ABSENT: ABSTAIN:
1 hereby certify that tF,1s Is a true and correct copy of
GC:drg an action taken and entered on the minutes of the
d\bo:6.t3 Board of Supe ry(:S�tg n
on the dple9sbown.
ATTESTED: -�mIJ/�H 11 U
Orig. Div: Public Works (DESIGN DIV.) PHIL BATCHELOR,Cierk of the Board
cc: SEE PAGE TWO
of Supervisors and County Administrator
Deputy
Issuance of Warrant for Wildcat/San Pablo Creeks Project
March 6, 1990
Page Two
II. Financial Impact Cont'd:
The warrant shall be funded as follows:
27% 7527-6D8618
73% 7567-6D8633
III. Reasons for Recommendations and Background:
On June 17, 1986, the Board of Supervisors approved and authorized the execution of a local
cooperation agreement with the Department of the Army for the Wildcat-San Pablo Creeks
Project. The terms of the agreement require the Flood Control District to pay in cash 5
percent of the total project cost to the Federal government and to provide for the relocation
of all roads, bridges and utilities required for the project. The Corps of Engineers has agreed
to include relocation work in the Federal project at 100 percent local cost to be paid as
"Contributed Funds Other."
Under current State law the local costs of relocation work required for the Federal Wildcat and
San Pablo Creeks Project is 70 percent reimbursable by the Department of Water Resources.
IV. Consequences of Negative Action:
Failure to authorize the issuance of a warrant would be cause for the Corps of Engineers to
stop further work on Wildcat and San Pablo Creeks Project.