TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: March 27, 1990
SUBJECT: Approving Cypress Road Pedestrian Bridge and Path Project,
Project No. 0662-6114060-90, Oakley Area.
CP# 90-05.
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE Project, and
FIND, on the basis of the initial study and all comments received, that there is no substantial
evidence that the project will have a significant effect on the environment,
ADOPT the Negative Declaration, and
DIRECT the Public works Director to begin right of way acquisition and to prepare contract plans and
specifications for construction.
DIRECT the Director of Community Development to file a Notice of Determination with the County
Clerk.
II. FINANCIAL IMPACT:
The estimated project cost is $102,300, funded by Transportation Development Act (37%), General
Road Funds (31.5%), and Oakley Area of Benefit (31.5%).
Continued on Attachment: X SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
_ APPROVE _ OTHER
SIGNATURE(S):
ACTION OF BOARD ON MAR 2 7 1990 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
,_UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify that this is a ttu6 and correct copy of
JY:drg an action taken
aano entered on the minutes of the
d\bo:27.t3 Board of Supeyyjsp�o2 h date
ATTESTED: ��/i
Orig. Div: Public Works (DESIGN DIVISION) PHIL BATCHELOR,Clerk of the Board
cc: SEE NEXT PAGE ,mpQ����and CountvAdminlstrator
Jjd-LL -'Deputy
R.
Approving Cypress Road Pedestrian Bridge and Path Project, Oakley area.
March 27, 1990
Page Two
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The project is needed to provide a safe walkway for residents and school children in the area.
The project has been determined to be in compliance with the General Plan. A Negative Declaration
of Environmental Significance pertaining to this project was published February 12, 1990 with no
protest, and the Board has considered the Negative Declaration together with all comments received
during the public review period.
IV. CONSEQUENCES OF NEGATIVE ACTION:
Delay in approving the project will result in a delay of design and construction and may jeopardize
funding.