HomeMy WebLinkAboutMINUTES - 07181989 - 1.19 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF CONTRA
COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION
DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: JULY 18, 1989
SUBJECT: APPROVE LETTER OF INTENT TO ENTER INTO A JOINT EXERCISE
POWERS AGREEMENT BETWEEN THE FLOOD CONTROL DISTRICT AND
THE CITY OF BRENTWOOD.
Specific Requests) or Recommendation(s) & Background &
Justification
I. RECOMMENDATION
APPROVE the Flood Control District's intent to execute a Joint
Exercise of Powers Agreement with the City of Brentwood for the
installation of a portion of the Line A outfall pipe line in
Drainage Area 52C, and AUTHORIZE the Chief Engineer to transmit a
letter of intent to the City Council of the City of Brentwood.
II. FINANCIAL IMPACT
The estimated project cost is $300, 000. Drainage Area 52C would
fund approximately $25, 000, the City of Brentwood $50, 000, and
the Flood Control District's Revolving Fund $225, 000. The City
of Brentwood ' and the District's contribution would be repaid by
Drainage Area 52C as drainage fees are collected.
III. REASONS FOR RECOMMENDATION/BACKGROUND
The proposed joint project would benefit the City of Brentwood
and the Flood Control District. The City is in the process of
constructing a waste water treatment plant in the project area.
Part of this work includes construction of a storm drain for the
plant. The joint project would eliminate the need for this storm
drain. The District would have approximately 2, 000 linear feet
of 30 inch pipe installed within undisputed and accessible right
of way.
Continued on ,attachment: X yes Signature:
Recommendation of of County Administrator
Recommendation of Board Committee
Approve Other:
Signature(s) :
Action of Board on: JUL 18 1989
Approved as Recommended Other
Vote of Supervisors I HEREBY CERTIFY THAT THIS IS
A TRUE AND CORRECT COPY OF AN
Unanimous (Absent ) ACTION TAKEN AND ENTERED ON
Ayes: Noes: THE MINUTES OF THE BOARD OF
Absent: Abstain: SUPERVISORS ON DATE SHOWN.
Attested JUL 18 1989 _
PHIL BATCHELOR, CLERK OF
THE BOARD OF SUPERVISORS
AND COUNTY ADMINISTRATOR
By �/�lllralGa � •
DEPUTY CLERK
r
Board of Supervisors
July 11, 1989
Page 2
IV. CONSEQUENCES OF NEGATIVE ACTION
I
If the proposed project cannot be constructed simultaneously with
the construction of the waste water treatment plant, the cost to
install the pipe line would increase substantially due to removal
of pavement and other improvements. Also, the City of Brentwood
would have expended approximately $50, 000 for an internal
drainage pipe no longer needed when the District's project is
constructed.
NCW:BO:dmw
DA52C.JPA
Orig. Div. : Public Works (FCE)
cc: County Administrator
Community Development
Building Inspection
County Counsel .
County Assessor
County Treasurer - Tax Collector
County Auditor - Controller
Chief Engineer
Flood Control Engineering
Accounting
Engineering Services