Loading...
HomeMy WebLinkAboutMINUTES - 06061989 - 1.22 1, 2_2 TO: BOARD OF SUPUNISORS, AS BOARD OF DIRECTORS, CANYM LADS C E DIOGIC HAZARD ABMEMENT DISTRICT FROM: J. MICHAEL WAIMM, PUBISC WORKS DIRECICR DA7R: JUNE 6, 1989 SUH7DCT: STATUS AMID EUEMSE REPORT FUR THE THIRD QMMIM (JANUARY - MARCH) OF FISCAL YEAR 1988-89. Specific Request(s) or Reoommendation(s) & Backrr and & Jus-tificaticn I. R] ACPICK: Adept the Canyon Iakes G.H.A.D. Quarterly Status and Expense Report. II. FINANCIAL IMPACT: None. III. REASONS ELH2 IDAT'I(HT/BAC[ ]ND: During the third quarter the District continued construction of some drainage facilities and began a new program of inspection and correction of drainage facilities in the properties surrounding the Lake Area. Expenses of $90,311 for repairs and maintenance through this quarter are approximately 75% of the budget for this item. Total expenses of $143,762 are just about 68% of the annual budget of $211,000. With the start of the inspection program of the drainage systems ,for the lots around the lake, it has been necessary to increase the line- item budget for staff Geologist's time from $10,000 to $46,000. There will be a corresponding .decrease in the Repair and Maintenance program. However, the district is confident that the total annual expenses as of June 30, 1989 will be well below the original $211,000 budget. IV. COVS�ES OF NEQUIVE ACPICN: None. For information only. Continued on attadment: yes Signature��G( Reoommeldatian of Oounty Administrator tlon of Board Approve Other: Ccmiftittee Si time s Action of Board on: JUN 9 1989 Approved as Recanw rled Other Vote of Supervisors I HEREBY CERM'Y THAT THIS IS A TRUE t Unanimous (Absent_) AND OORRDLT COPY OF AN ACTION TAKM Ayes AND ENTERED ON THE MINU IES OF THE Noes BOARD OF SUPERVISORS ON DATE SHOW. Absent Abstain Attested JUN 6 1989 Orig. Div: Public Works (ES) PHIL BATCHEIM cc: Auditor-Controller CLERK OF THE BOARD OF SUPERVISORS County Counsel AND COUNTY Richard Nystrom e Public Works - A000unting Byjo� DEPUTY CT-ERK Attachments fl/ gcynstat.res • .r CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT QUARTERLY BUDGET/EXPENSE SUMMARY 1988-1989 FISCAL YEAR A. PROJECT INCOME 1. Balance (Reserve) brought forward from 187-188 $233,400.00 2. Annual Income via Assessments: 743 Single Family . Detached x $108. 60 469 Townhouses x $72.74 2,576 Condominiums/ Rentals x $54. 30 100,000 square feet , Commercial .x $0.05 TOTAL ASSESSMENTS BUDGET: $249.600.00 TOTAL FUNDS: $483,000.00 PROJECTED EXPENSES ACTUAL EXPENSES B. PROJECTED EXPENSES FY 1988-1989 JUL 188-MAR 989 1. General Manager $25, 000 $ 91520 2. Engineering Geologist and Geologist Assistant 46,000 33, 602 3 . Support Services (i.e. office space, office equipment, office staff and vehicles) 0* 0* 4 . Repair, maintenance and improvements (as per approved Repair, Maintenance .and Improvement Program. ) 110,000 90, 311 l 5. Legal, accounting and insurance 51000 0 6. Professional Soils and Geotechnical Consulting 10, 000 41539 7. County staff services 51000 0 8. Assessment documents preparation 10, 000 51790 Total Expenses: $211, 000 $143,762 Reserve: 272 . 000 Total Costs: $483 , 000 *Included in line item 1 & 2 / . ZZ CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT c/o Nystrom Engineering 500 Ygnacio Valley Road, Suite 425 Walnut Creek, California 94596 (415) 935-8077 CANYON LAKES G.E.A.D. REPAIR AND IMPROVEMENT PROJECTS - 1988-1989 ACTUAL BUDGET EXPENSES PROJECT FY 188-189 JAN 189-MAR 189 1. Erosion control and revegetation of bank slope areas (9 separate areas) $ 45,000 230034 2. Repair and maintenance of B-58 drainage ditch systems 10,000 5,288 3. Repair and corrective grading 10,000 19,760 4. Horizontal Drain Drilling and Maintenance 101000 0 5. Maintenance of Existing Repairs 100000 7,584 6. Miscellaneous Debris Walls 15,000 0 7. Bollinger Canyon 20,000 19,960 8. Howard Hill 30247 9. Canyon Woods 1,693 10. General Drainage Maintenance 695 11. Lake Area Drainage 9,050 ESTIMATED TOTAL PROJECT COSTS: $ 120,000 TOTAL ACTUAL EXPENSES: $90, 311