Loading...
HomeMy WebLinkAboutMINUTES - 05091989 - 1.8 (2) ' 1-- 080 To " _ . BOARD OF SUPERVISORS FROM: R. W. Giese, Director of Building Inspection Contra Costa DATE: April 28, 1989 Cam"* SUBJECT: CONSTRUCTION AT 291 ARLINGTON AVE. , KENSINGTON SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: Accept status report from Building Inspection Department. FINANCIAL IMPACT: None BACKGROUND: Construction at 291 Arlington Ave. remains stopped due to unresolved questions on the structural adequacy of an existing retaining wall. CONTINUED ON ATTACHMENT: YES SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON MAY 9 1989 APPROVED AS RECOMMENDED _X_ OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS (ABSENT AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES. AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. cc: Building Inspection ATTESTED MAY q IgRS PHIL BATCHELOR, CLERK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR BY ,� ,DEPUTY M382/1-83 1-080 CONTRA COSTA COUNTY BUILDING INSPECTION DEPARTMENT Inter-Office Memo DATE: April 28, 1989 TO: Board of Supervisors FROM: R. W. Giese, Director of Building Inspection eo By: Fred Fung, Senior Structural Engineer SUBJECT: Status report on proposed construction at 291 Arlington Avenue, Kensington The stop work order on construction at 291 Arlington Avenue remains in effect. The stop work order was issued by this Department because there were significant visual indications that the retaining wall may be grossly overstressed. On March 3 , 1989, Mr. Rastegar requested this Department to require Dr. Thal to reinforce the retaining wall separating their lots. On March 15, 1989, Dr. Thal, through his attorney, David Lonich, requested this Department to begin abatement proceedings against Mr. Rastegar as owner of the retaining wall. After consulting with the County Counsel 's Office, we informed Mr. Rastegar and Dr. Thal that it is inappropriate for this Department to take either action at this time. The ownership issue of the retaining wall should be resolved between Mr. Rastegar and Dr. Thal. The structural issue should be addressed by the responsible party. Dr. Thal, while not assuming responsibilities for the retaining wall, requested and obtained a proposal from his structural engineer, Mr. H. D. Rueb. The proposal outlined how the retaining wall may be reinforced. FF:nr