HomeMy WebLinkAboutMINUTES - 05161989 - IO.9 1.0. 9 .............
TO: Board of Supervisors , -- -
FROM: INTERNAL OPERATIONS COMMITTEE
DATE: May 8, 1989 `Y ST9------
SUBJECT: REIMBURSEMENT OF DRAINAGE AREA 56 EXPENSES TO THE
EAST CONTRA COSTA TRANSIT AUTHORITY
Specific Request(s) or Recommendations(s) & Background & Justification
RECOMMENDATION:
Remove this item as a referral to our Committee since the Board of Supervisors has already disposed of this item.
BACKGROUND:
This matter was originally considered by the Board of Supervisors on January 12, 1988 and was referred to the 1988
Internal Operations Committee. The item was never disposed of by the Committee and was referred to our
Committee on January 10, 1989.In the meantime the Public Works Director filed the attached report with the Board
of Supervisors and the Board approved the report on April 4, 1989,thus making moot the referral to our Committee.
As a result, there is no longer any need for the item to be on referral to our Committee and we are, therefore,
recommending that the item be removed as a referral to our Committee without further action by the Board of
Supervisors.
CONTINUED ON ATTAC NO SIGNATURE:
ec mmen ion of C ty Administrator Recommendation of Board Committee
Other:
Signature(s): S NNE WRIGHT McPE K
Action of Board o : May 16, 1989 Approved as Recommended x Other.
Vote of Supervisors
I HEREBY CERTIFY THAT THIS IS A TRUE AND
X Unanimous(Absent ) CORRECT COPY OF AN ACTION TAKEN AND
Ayes: Noes: ENTERED ON HE MINUTES OF THE BOARD
Absent: Abstain: OF SUPERVISORS ON DATE SHOWN.
cc: County Administrator ATTESTED leo it /?I 9
Public Works Director PHIL BATC19LOR,CLERK OF THE BOARD
SUPERVISORS AND COUNTY ADMINISTRATOR
BY: Deputy Clerk
clvm:eh(io9.bo)
--0011
TO: BOARD OF SUPERVISORS, AS GOVERNING BOARD OF CONTRA COSTA
COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: April 4, 1989
SUBJECT: Board Referral of February 7 , 1989 - Drainage Reimburse-
ment - East Contra Costa Transit Authority
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND
JUSTIFICATION
I. Recommended Action:
1. ACCEPT this report by the Chief Engineer on the January
26, 1989 letter from East Contra Costa Transit Author-
ity, and
2 . REAFFIRM' the Board's. action of March 22 , 1988 , adopting
the Credit and Reimbursement Policy for Drainage Area 56
(East Antioch Creek) , and
3 . DIRECT the Chief Engineer to notify the Transit Author-
ity on an annual basis the financial status of Drainage
Area 56 with regard to available funds and- the amount of
reimbursements made during the previous year.
II. Financial Impact:
The agreement provides for reimbursement of $224 , 295 . 60 to
the East Contra Costa Transit Authority by Drainage Area 56.
Cont'd on Attachment:-Z-- yes Signature:
Recommendation of County Administrator
Recommendation of Board Committee
Approve Other
Signature(s)
Action of Board on
Approved as recommended �_ Other
Vote of Supervisors
X_ Unanimous (Absent ) I HEREBY CERTIFY THAT THIS
Ayes: Noes: IS A TRUE AND CORRECT COPY
Absent: Abstain: OF AN ACTION TAKEN AND
ENTERED ON THE MINUTES OF
THE BOARD OF SUPERVISORS ON
DATE SHOWN.
ATTESTED APR 4 1989
PHIL BATCHELOR, Clerk of
the Board of Supervisors
and
er� County Administrator
BY 4ym"
DEPUTY
Orig. Div: Public Works (FCE)
cc: County Administrator
County Counsel
Transit Authority (via P/W)
Auditor-Controller
Public Works Dept. (Accounting & FCE)
Clerk of Board
D. Heisch - Ref11
III. Reasons for Recommendations and Background:
On January 12 , 1988 , the Board considered the concerns
expressed by the East Contra Costa Transit Authority refer-
ence the 40 quarter payback limitation in the Drainage Area
56 Drainage Fee Credit and Reimbursement Policy. The Board
referred the matter to the Internal Operations Committee.
At the Committee meeting it was decided to revise the policy
to stipulate that the 40 quarters would not start until the
first reimbursement payment was made. The original policy
started the 40 quarters upon execution of the agreement. The
revised policy was approved by the Board on March 22 , 1988 .
On January 26, 1989, the Board referred to the Chief Engineer
a letter from the Transit Authority indicating their desire
to address the Board regarding their concern that the 40
quarter time limit could be started with a minimal payment
and no subsequent quarterly payments would follow. we have
discussed the matter with Anne Drew, the Manager of the
Transit Authority. The only option open to the Transit
Authority is to not execute the agreement until they feel
comfortable that sufficient drainage fees will be collected
during a 40 quarter time period to insure full reimburse-
ment. It is proposed that we annually notify them of our
financial status and our ability to make reimbursement
payments. In this fashion, they can execute the agreement at
a time where we can make the first quarterly payment at least
50% of the amount reimburseable.
It is recommended that the Board reaffirm the Credit-Reimbur-
sement Policy adopted on March 22, 1988 (see attached) .
IV. Consectuences of Negative Action:
The Transit Authority will not have an approved reimbursement
agreement.
JMW:MFK: rs
BO:ccta.t2
EXHIBIT A
0RAINAGE FEE CREDIT AND REIMBURSEMENT POLICY
DRAINAGE AREA 56 (ANTIOCH)
The following policy adopted on June 16, 1987, by the Board of Supervisors,
as the governing body of the Contra Costa County Flood Control and Water
Conservation District, shall be used in the administration of the Contra
Costa County Flood Control and Water Conservation District Drainage Fee
Ordinance No. 82-10 for Drainage Area 56.
GENERAL: To provide adequate facilities into which the required subdivision
drainage facilities can be discharged, it is necessary that improvements,
either interim or ultimate, be made to the East Antioch channel and to the
detention basins. Due to a shortage of funds the money to construct these
improvements will have to be advanced by developers. The advance cash
payment of fees shall be equal to 35 percent of the drainage fees due on the
development. The advance cash payment shall be made in the same manner as
that specified by the Drainage Fee Ordinance for the payment of drainage
fees.
I. Eligible Reimbursement Items
A. Developers making cash fee advance and installing drainage
facilities shown on the adopted drainage plan may be eligible for
credit against the required drainage fees and for reimbursement of
costs in' excess of the drainage fees. The amount of credit or
reimbursement shall be limited to the summation of the following
eligible costs:
1. Actual in-tract and off-tract construction costs plus a fixed
amount of 7% of the in-tract construction cost and 140 of the
off-tract construction cost for allowance of miscellaneous
developer's costs, including contract preparation,
engineering, bonding, etc.
2. Actual public agency project inspection fees.
3. Actual off-tract utility relocation costs.
4. Purchase price for the off-tract right of way acquired by the
District and paid for by the developer, provided the
developer does not have a beneficial interest in the off-
tract property.
5. Cash advance of 35% of the drainage fees due to provide
construction funding of the major channel element (East
Antioch Creek) of the drainage plan.
B. The determination of construction costs that will be eligible for
credit or reimbursement will be based on at least three
independent bids for the drainage facilities work. The developer
shall submit said bids to the District for review and concurrence.
Upon District concurrence with the bids, the lowest bid shall be
the basis for determination of the credit and reimbursement
amount.
The District reserves the right to reject the developer's bids or
any other proposed value of said eligible costs and to calculate
said costs using then current prices.
C. If the developer elects to install a more costly drainage system
than shown on the adopted plan, the District reserves the right to
calculate said eligible costs using the then current prices for
only the facility shown on the adopted plan.
1
II. Credit Policy
The developer is eligible to receive credit for the construction of
drainage facilities up to an amount equal to the required drainage fee
computed in conformance with Drainage Fee Ordinance 82-10 for Drainage
Area 56 and within the limits specified in Section I above.
III. Reimbursement Policy
A. Where the amount of said eligible costs exceed the drainage fee
due, the developer, upon entering into a reimbursement agreement
with the District, shall be eligible for a percentage reimburse-
ment on the amount of the eligible costs determined by Section I.
above, in excess of the drainage fee due as follows:
Cash Advance: 100%
Group A: 100% (One Hundred Percent) for off-tract work.
Group B: 50% (Fifty Percent) for in-tract work.
Prior to the application of the above percentages, the eligible
costs in excess of the drainage fee due shall be prorated between
Group A and B in the same proportion as the total eligible costs
for Group A and B are to the total eligible costs. The cash
advance required in Paragraph 1A(5) is excluded from this calcula-
tion.
B. The reimbursement shall be subject to the following limitations:
1. Reimbursements shall be paid only from drainage fees
collected under Ordinance No. 82-10.
2. If more than one reimbursement agreement is in effect, the
reimbursement payments to each developer shall be based on
the ratio of the developer's outstanding balance to the total
outstanding balance of all agreements.
3. The District reserves the right to utilize not more than
eighty (80) percent of the fees collected annually, on a
fiscal year basis, for the purpose of making reimbursement
payments.
4. Reimbursement payments shall be made quarterly, except that,
during any quarter the District reserves the right not to
make said payments if the amount of available funds to be
disbursed is less than $5,000, and the total outstanding
balance (reimbursements awed to all parties) is greater than
$5,000.
5. No reimbursement payment shall be made until loans from
governmental agencies has been made.
6. No reimbursement payment shall be made on Group A and B
installations until the cash advance portion of the outstand-
ing reimbursement agreement have been paid.
7. Reimbursement agreements shall remain in effect for 40 annual
quarters: The first quarter shall be the one following the
quarter in which the first reimbursement payment is made.
Any outstanding balance owed at the end of the 40 quarters
shall be waived by the developer.
IV. ale
Attached hereto as Exhibit A, and made a part hereof, is an example
illustrating the implementation of the Credit Policy (Section II) and
the Reimbursement Policy (Section III.
The time constraints on repayment on reimbursement repayment imposed by
Paragraphs 4 and 5 shall not extend the 40 quarter period as defined in
Paragraph 6.
2
DRAINAGE FEE CREDIT AND REIMBURSEMEVr IKPIEMqTATION
DRAINAGE AREA 56
EXAMPLE 1
A. ASSUMPTION
1. Development is creating 70 residential sites having lot areas
between 7,000-,7,999 square feet and 60 patio homes sites having
lot areas between 3,000-3,999 square feet.
2. The eligible off-tract costs (Group A) are $100,000. (Policy
Section I.A.) .
3. The eligible in-tract costs (Group B) are $50,000. (Policy
Section I.A.) .
B. FACT
1. Fee for 7,000-7,999 square foot lots is $1,360. (Ordinance
Section VII)
2. Fee for 3,000-3,999 square foot lots is $620. (Ordinance Section
VII.
3. Reimbursement of off-tract (Group A) excess cost is 100%. (Policy
Section III.A.)
4. Reimbursement of in-tract (Group B) excess cost is 50%. (policy
Section III.A.)
C. FEE CALCULATION
Fee Due = (70 lots x $1,360/lot) + (60 lots x $620/lot)
Fee Due = $95,200 + $37,200
Fee Due = $132,400
D. CALCULATION OF REIMBURSEME14 '
Cash Fee Advance $ 46,340
Eligible Costs Group A $100,000
Eligible Costs Group B S50,000
Total Eligible Costs $196,340
Less Fee Due $132,400
$63,940
Ratio of Group A, Group B to total Eligible Costs (Policy Section III.A.)
$100,00 2 50,00 1
Therefore, the excess is prorated 2/3 to Group A and 1/3 to Group B
Cash Advance @ 100% $ 46,340.00
Group A Reimbursement = (100%) ($17,600) (2/3) _ $ 11,733.33
Group B Reimbursement = ( 50%) ($17,600) (1/3) _ $ 2.933.33
Total Amount of ReimburVment would be $61,006.66
RSC:sj
RSC:DA56ReimPol
3