HomeMy WebLinkAboutMINUTES - 05161989 - 1.7 (2) TO: BOARD OF SUPERVISORS ++
FROM: Harvey E. Bragdon � llra
Director of Community Development uJJta
DATE: May 10, 1989 Cour-V.
SUBJECT: Wildcat-San Pablo Design Team Final Report
SPECIFIC REQUEST(S) OR RECOMMENDATIONS(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
1. Adopt the Maintenance Master Plan for the Wildcat-San Pablo
Flood Control .project as recommended .by the Design Team and
Staff. .
2. Acknowledge the assurances that the Flood Control project will
be built as designed.
3. Direct the Public Works Department to bring the issue of a
Phase II project committee back to the Board of Supervisors
prior to design - if it appears a project is financially
feasible.
4. Request the joint Richmond/County General Plan Study Committee
for North Richmond to consider that a 100 foot buffer zone be
required on each side of the Wildcat Creek Flood Control
project right-of-way.
FISCAL IMPACT
None.
BACKGROUND/REASONS FOR RECOMMENDATIONS
F
On March 21, 1989 and April 25, 1989, this report was considered by
the Board of Supervisors. The Board action on April 25, 1989
focused on the controversial 6th recommendation of the Design Team
dealing with San Pablo Creek between the railroad tracks. The -
other non-controversial recommendations of the Design Team were not
specifically mentioned in the Board action. This Board Order is to
handle this oversight and to correct the paper trail.
CONTINUED ON ATTACHMENT: YES SIGNATURE-
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOF BJ TTEE
APPROVE OTHER
SIGNATURE(S) :
ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
-�- UNANIMOUS (ABSENT ) TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
cc: Community Development ATTESTED MAY 16 1989
Public Works PHIL BATCHELOR, CLERK OF
CAO 1 THE BOARD OF SUPERVISORS
County Counsel AND COUNTY ADMINISTRATOR
BY DEPUTY
JWC/m2/jb/wildcat.bos