HomeMy WebLinkAboutMINUTES - 03211989 - 1.18 BOARD OF StJPFRV I.9C , AS BOARD OF DUMMIORS, CAN IAXES MODOGIC
HAZARD ABATEMM DISTRICT
FIM: J. MICHAEL WAIECIRD, PUBLIC WOM DIRE)MIR
DATE: Mardi 21, 1989
SUB3Wr: STA US AM EXPENSE REPCIRT FUR THE FIRST AND SECUND UMMERS (JM
LucEMBM) OF FISML YEAR 1988-89.
Specific Request(s) or rwxwnendaticn(s) & Background & Justification
I.
tutu ACI'IC�T:
1. Accept the Canyon lakes G.H.A.D. Quarterly Status and Expense
Report.
2. Approve and Adopt the Detailed Program Budget expanding Upon the
Idm Item Budget ,(approved August 1988) for Fiscal Year 1988-89.
II. 111941CIAL IMPACT:
None.
M. RE MMS FUR �QN
During the first quarter the District constructed two slide repairs and
performed some drainage ditch maintenance. Expenses of $19,091 for
repairs and maintenance through this quarter are approximately 16% of
the budget for this item. Total expenses of $39,945 for the first
quarter are just about 19% of the annual budget of $211,000.
During the second quarter the District continued construction of slide
repairs and performed some drainage ditch maintenance, erosion control
revegetation, and corrective regrading. Expenses of $79,469 for
repairs and maintenance through this quarter are approximately 66% of
the budget for this item. Total expenses of $118,203 through the
second- quarter are approximately 56% of the annual budget of $211,000.
This was a relatively busy quarter for repairs, but it is not
anticipated that the third and fourth quarters will have the same rate
of expenses. However, the district has begun the inspection program
for the drainage systems for the lots around the lake, so this will
affect the budget item for staff geologist's time.
Continued cn attachment: X-yes Signature
Recommendation of County Administrator of Board
_Apprave other: Ccumittee
Si�tu�re(a)
Action of Board on: AR 2 1 IN Approved as Recommended_X other
Vote of Supervisors I HEREBY CEFWHY THAT THIS IS A IBM
Mwdmam (Absent�.) AM COMM COPY OF AN ACTIM MMM4
Ayes AM ENTERED CN THE PEMRW OF THE
Noes BUM OF StJPFRVZ9fXiS CK EWE Sa3m.
Absent
Abstain Attested. 'MAR 2 1 1'98,9
11
Orig. Div: Public Works (ES) PHIL BAMINIM
cc: Auditor-Controller C OF ME BMW OF MATUMN
County Counsel AND COUNTY ACKERISTRATM
Richard Nystrom
Public Works - Accounting By
UMM
Enclosed is the detailed program budget which expands upon the county
line item budget (approved August 1988) for the 1988-89 Fiscal Year
Canyon lakes CHAD operations. Also enclosed is a copy of the overall
District Budget compared to the total annual expenses incurred in the
previous fiscal year.
The estimated budget for Project Repair, Maintenance and Improvements
($120,000) is slightly higher than last year's budget and last year's
actual expenses. The current budget item will be used for erosion
control work or maintenance of existing slope areas and drainage ditch
systems. The total estimated expenses for the District ($211,000)
follows a similar pattern. Nevertheless, due to a larger-than-
anticipated "balance brought forward" reserve, the district anticipates
a resulting Reserve Fund of almost $300,000 by the end of fiscal year
1988-89. The district is pleased to report that this reserve fund will
be approximately 60% of the desired minimum reserve fund of $500,000
despite three years of significant major repairs and the conpletion of
many of the anticipated maintenance programs.
IV. OF NBGATM ACTION:
None. For information only.
Attachments
fl/
B02.14.t3
CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT
QUARTERLY EXPENSE SUMMARY
1988-1989 FISCAL YEAR
A. PROJECT INCOME
1. Balance (Reserve) brought forward from 187-188 $233,400
2. Annual Income via Assessments:
743 Single Family
Detached x $108.60
469 Townhouses x $72.74
2,576 Condominiums/
Rentals x $54. 30
100, 000 square feet
Commercial x $0. 05
TOTAL ASSESSMENTS BUDGET: $249, 600
TOTAL FUNDS: $483 , 000
PROJECTED EXPENSES ACTUAL EXPENSES
B. PROJECTED EXPENSES FY 1988-1989 JUL-SEPT 1988
1. General Manager $25, 000 $3,770
2 . Engineering Geologist
and Geologist Assistant 36, 000 11, 294
3 . Support Services (i.e.
office space, office
equipment, office staff
and vehicles) 0* 0
4. Repair, maintenance and
improvements (as per approved
Repair, Maintenance and
Improvement Program. ) 120, 000 19, 091
5. Legal, accounting and
insurance 5,000 0
6. Professional Soils and
Geotechnical Consulting 10, 000 0
7. County staff services 5,000 0
8. Assessment documents
preparation 10, 000 5,790
Total Expenses: $211,000 $ 39,945
Reserve: 272 , 000
Total Costs: $483, 000
*Included in line item 1 & 2
CANYON LAKES G.H.A.D.
REPAIR AND IMPROVEMENT PROJECTS - 1988-1989
ACTUAL
BUDGET EXPENSES
PROJECT FY 188-189 JUL-SEPT 188
1. Erosion control and revegetation
of bank slope areas (9 separate areas) $ 45,000
2 . Repair and maintenance of B-58
drainage ditch systems 10, 000 5, 012
3 . Repair and corrective grading 10,000
4. Horizontal Drain Drilling and
Maintenance 10, 000
5. Maintenance of Existing Repairs 10, 000
6. Miscellaneous Debris Walls 15, 000
7. Bollinger Canyon 20, 000 10,832
Estimated Total Project Costs = $ 120, 000
8. Howard Hill 3 . 247
TOTAL ACTUAL EXPENSES: $194,091
CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT
QUARTERLY EXPENSE SUMMARY
1988-1989 FISCAL YEAR
A. PROJECT INCOME
1. Balance (Reserve) brought forward from 187-188 $233,400
2. Annual Income via Assessments:
743 Single Family
Detached x $108. 60
469 Townhouses x $72 .74
2,576 Condominiums/
Rentals x $54 . 30
100, 000 square feet
Commercial x $0. 05
TOTAL ASSESSMENTS BUDGET: $249 , 600
TOTAL FUNDS: $483 , 000
PROJECTED EXPENSES ACTUAL EXPENSES
B. PROJECTED EXPENSES FY 1988-1989 JUL-DEC 1988
1. General Manager $25, 000 $6, 645
2. Engineering Geologist
and Geologist Assistant 36, 000 21,760
3. Support Services (i.e.
office space, office
equipment, office staff
and vehicles) 0* 0
4. Repair, maintenance and
improvements (as per approved
Repair, Maintenance and
Improvement Program. ) 120, 000 79,469
5. Legal, accounting and
insurance 5, 000 0
6. Professional Soils and
Geotechnical Consulting 10, 000 4,539
7. County staff services 5, 000 0
8. Assessment documents
preparation 10, 000 5,790
Total Expenses: $211,000 $118,203
Reserve: 272 , 000
Total Costs: $483 , 000
*Included in line item 1 & 2
CANYON LAKES G.H.A.D.
REPAIR AND IMPROVEMENT PROJECTS - 1988-1989
ACTUAL
BUDGET EXPENSES
PROJECT FY 188-189 JUL-DEC 188
1. Erosion control and revegetation
of bank slope areas (9 separate areas) $ 45, 000 23, 034
2 . Repair and maintenance of B-58
drainage ditch systems 10, 000 5, 288
3 . Repair and corrective grading 10,000 19,760
4. Horizontal Drain Drilling and
Maintenance 10, 000 0
5. Maintenance of Existing Repairs 10, 000 7, 584
6. Miscellaneous Debris Walls 15, 000 0
7. Bollinger Canyon 20, 000 19,960
8. Howard Hill 3,247
9. Canyon Woods 596
Estimated Total Project Costs = $ 120, 000
TOTAL ACTUAL EXPENSES: $79,469
CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT
QUARTERLY BUDGET/EXPENSE SUMMARY
1988-1989 FISCAL YEAR
A. PROJECT INCOME
1. Balance (Reserve) brought forward from 187-188 $233,400.00
2 . Annual Income via Assessments:
743 Single Family
Detached x $108.60
469 Townhouses x $72 .74
2,576 Condominiums/
Rentals x $54.30
100,000 square feet
Commercial x $0. 05
TOTAL ASSESSMENTS BUDGET: $249,600.00
TOTAL FUNDS: $483,000.00
PROJECTED EXPENSES ACTUAL EXPENSES
B. PROJECTED EXPENSES FY 1988-1989 JUL 1987-JUN 1988
1. General Manager $25,000 $17,820. 00
2 . Engineering Geologist
and Geologist Assistant 36, 000 32,280.00
3 . Support Services (i.e.
office space, office
equipment, office staff
and vehicles) 0* 0*
4. Repair, maintenance and
improvements (as per approved
Repair, Maintenance and
Improvement Program. ) 120,000 97,499.52
5. Legal, accounting and
insurance 5, 000 0
6. Professional Soils and
Geotechnical Consulting 10, 000 7,649.91
7. County staff services 5,000 0
8. Assessment documents
preparation 10, 000 5,980.00
9. Debt Service (interest) 0 0
Total Expenses: $211,000 $161,229.43
Reserve: 272 ,000
Total Costs: $483, 000
*Included in line item 1 & 2
CANYON LAKES a.H.A.D.
PROGRAM OF WORK - 1988-1989
PROJECT ESTIMATED COSTS
1. Erosion control and revegetation
of bank slope areas (9 separate areas) $ 45,000
2. Repair and maintenance of B-58
drainage ditch systems 10,000
3. Repair and corrective grading 10,000
4 . Horizontal Drain Drilling and
Maintenance 10,000
5. Maintenance of Existing Repairs 10,000
6. Miscellaneous Debris Walls 15,000
7. Bollinger Canyon 20,000
Estimated Total Project Costs = $ 120,000