HomeMy WebLinkAboutMINUTES - 07121988 - 1.91 TO: � `� BOARD OF SUISORS • FROM: Phil Batchelor, 1-091 County Administrator DATE: June: 27:, 1988 SUBJECT: West County Justice Center, Project A Contract Change Order Authorization No. 0928-WH101B Specific Request(s) or Recommendations(s) & Background & Justification RECOMMENDATION AUTHORIZE the Director, Justice System Programs to approve a change order with Oliver de Silva, the construction contractor, compensating them for utility companies ' caused delays to their work. FINANCIAL IMPACT The negotiated change is $48 ,000 . Contingency project funds are available for this change. REASONS FOR RECOMTENDATION/BACKGROUND The construct contract stipulated that the contractor coordinate with Pacific Gas and Electric Company (PG&E) and East Bay Municipal Utility District (EBMUD) and allow them an opportunity to install underground water and gas mains. After conversations with both utility companies, Oliver de Silva (ODS) scheduled three weeks for this work to be done. This work was on the project schedule' s "critical path" because these utilities were to be installed under the relocated Giant Highway. The contractor had to first complete the required cut and fill and subgrade work before the utilities could be installed. The contractor could not proceed with completing the street construction activities (gravel base and asphalt) until the utility company work was complete. The majority of the site rough grading could not begin until the street relocation work was completed, since the existing Giant Highway alignment went through the middle of the project site. The existing street could not be closed until the new street was open. The contractor originally turned the graded roadway over to the utility companies on November 30 ; however, winter rains in December and January stalled all construction activities until January 19. Given the contractor' s original schedule, . revised to reflect the rain delays, the utility companies should have completed their work on or before February 10. Both utility companies took longer than originally scheduled. PG&E finished their work on March 2 and EBMUD completed their w k on March 10 , CONTINUED ON ATTACHMENT: X YES Signature: Recommendation of County Administrator Recommendation of Board Committee Approve Other Signature(s) : Action of Board on: JUL 2 i988 Approved as Recommended x Other Vote of Supervisors: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN L_ Unanimous (Absent �— ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF SUPERVISORS ON DATE SHOWN. Absent: Abstain: Attested: JUL 121988 CC: CAO, Justice System Programs Phil Batchelor, Clerk of CAO the Board of Supervisors GSD, Accounting and County Administrator Auditor-Controller By: DEPUTY Contract, Change Order •r Utility Companies Delay Jurie-A 7., 1988 Page Two 30 calendar days beyond the contractor ' s revised schedule. Based on language in the contract and referenced CALTRANS specifications, ODS submitted a "right-of-way" delay claim asking for a time extension and additional compensation in the amount of $115,730. After a number of negotiation sessions, the County' s Project Manager and the contractor agreed that a 30 calendar day time extension, of which 12 days were compensable, was a fair and reasonable settlement. Compensation was established at $4 ,000 per day based on the number of idle pieces of grading equipment at the site. The settlement, therefore, was 12 times $4 ,000 equalling $48 , 000.