Loading...
HomeMy WebLinkAboutMINUTES - 07121988 - 1.28 TO: BOARD OF SUPERVISORS AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: July 12 , 1988 SUBJECT: Contract Award and Rejection Recommendation: Wildcat Creek - Verde School Sewer Relocation Project Project No. 7527-6D8618, North Richmond Area Specific Request(s) or Recommendation(s) & Background & Justification RECOMMENDED ACTION: REJECT the bid of Antovich Construction, Inc. , the apparent low bidder, for failure to submit adequate DBE participation with their bid, as specified in the contract special provisions. AWARD the contract for furnishing labor and materials for the subject project to Fee Construction Inc. , the second low bidder, in the amount of $188, 355. 00 and at the unit prices submitted; and REQUIRE the contractor to present surety bonds for Payment and Faithful Performance in the amounts of $94 , 177 . 50 and $188 , 355. 00, respectively. DIRECT the Chief Engineer to prepare the contract for the project. AUTHORIZE the Chief Engineer to sign the contract on behalf of the Board subject to the Chief Engineer having reviewed and found sufficient all required documents, including the contract signed by the contractor, the aforementioned . surety bonds, and a certificate of insurance. DIRECT that, in accordance with the project specifications and/or upon the execution of the contract by the Chief Engineer, any bid bonds posted by the bidders be exonerated and any checks or cash submitted for bid security be returned. i Continued on attachment: X yes Signatu Recommendation of County Administrator Recommendation of Board Committee Approve Other: Signature(s) : Action of Board on: At 12 Approved as Recommended_ Other Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN Unanimous (Absent ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF SUPERVISORS ON DATE SHOWN. Absent: Abstain: Attested JUL 12 1988 Orig. Div. : PW-Constr. Phil Batchelor cc: County Administration Clerk of the Board of Auditor-Controller Supervisors and County Design Administrator Accounting Contractor LT/s a By dm JJdA(_ DEPUTY bo: 12 .t7 FINANCIAL IMPACT: The project, including engineering and appropriate overhead charges, is funded by Zone 7 and the Department of Water Resources. REASONS FOR RECOMMENDATION/BACKGROUND: The plans and specifications were approved and the project advertised for bids by the Board of Supervisors on June. 7 , 1988 . The bids were received and opened at 255 Glacier Drive, Martinez , California, on Thursday, June 30', 1988 . The construction bids received were as follows: 1. Fee Construction Inc. $188, 355. 00 2 . Silva' s Pipeline 204 , 633 . 00 3 . MJB Pipeline 206, 606. 00 4 . Mt. Cascade 217, 910. 00 5. McGuire and Hester 224, 224 . 00 6. Ranger Pipeline 251, 384 . 00 7 . Jardin Pipeline 285, 635. 00 The Engineer' s estimated construction cost was $240, 219 . 85