HomeMy WebLinkAboutMINUTES - 07121988 - 1.26 TO: BOARD OF SUPERVISORS
FRCM: J. MICHAEL WKFORD, PUBLIC WMA S DIRECTOR
DATE: July 12, 1988
SUB,TECT: Approve Plans & Specifications for Taxiway "J" Reconstruction and
Lighting and Taxiway "E", "C", and "F" Intersection Reconstruction at
Buchanan Field Airport and Authorize Public Works Director to Advertise
for Bids
Specific Request(s) or Reoaam7r dation(s) & Background & Justification
RAIDED ACTION:
APPROVE Plans & Specifications for the reconstruction, marking and installation
of medium intensity taxiway lighting on taxiway "J" and the reconstruction of the
intersections of taxiways "C", "E" and "F" at Buchanan Field Airport.
AUTHORIZE Public Works Director to advertise for bids which will be opened
August 4, 1988.
FILIAL IMPACT:
Estimated cost of this portion of the project is $1,383,650 of which 90% will be
funded by the Federal Aviation Administration. The local share is estimated to
be $138,365 which will be paid for out of the Airport Enterprise Fund utilizing a
portion of a loan from the California Department of Transportation Division of
Aeronautics.
REASONS FOR RECOMFNDATI01N/B NID:
Taxiway "J" is currently forty (40) feet wide. The current standard for this
type of taxiway is fifty (50) feet wide. The taxiway at the north end is
substantially below the flood plane and in past years under heavy rain conditions
flooding has occurred. Also in accordance with the newly approved Airport Layout
Plan, the taxiway will be straightened at the southeastward end and concrete will
be removed to provide better safety for aircraft landing on runway 32L in
relation to aircraft taxiing. The taxiway is currently unlighted and lighting
will be included in this project. Taxiway "J" will . be reconstructed at a
strength adequate for the adjoining runways (90,000 pounds gross weight) . Also
the intersection of taxiway "C", "E" and "F" has broken up and needs to be
completely rebuilt. This will be accomplished in this project. An Initial Study
of Environmental Significance was ccanpleted on December 23, 1986 and this project
was found to be categorically exempt.
The Board approved FAA Grant Agreement for $3,134,025 (AIP #3-06-0050-0 ) on
September 8, 1987. This item is a portion of this project.
Contituied eri attacttt»ent: yes Signature:
Reoanxoescydation of C1oumty Armani�t-rat-�or of "ttee
Approve Other:
Signature(s):
Action of Board on: JUL 12 19BB Approved as ReocmrendedX_ other
Vote of Supervisors I BEREBY CERTM 93W MUS IS A TRUE
AMID OQRRDLT COPY OF AN ACTION TAKEN
Unanimous (Absent ) AMID ENTERED ON THE SES OF THE
Ayes: Noes: BOARD OF SUPERVISORS CST DATE SHOW.
Absent: Abstain:
Attested JUL 12 198E
Phil. Ba�tcbelor
(rig. Div.: Public Works Airport Clerk of the Board of Supecvisarrs
and Comty t-rat or
cc: County Administrator
P.W. Accounting
Hodges & Shutt p
sh
05bidbo.t7 Deputy Clerk