Loading...
HomeMy WebLinkAboutMINUTES - 06071988 - 1.18 TO: BOARD OF SR7PERVISO�?S, AS BOARD OF DRUETI1 RS, HWX-�WK GEOIOGIC HAZARD ABATEMENT DISTRICT Fieri: J. MICHAEL WA121 2D, PUBIJC WORKS DIFECICR LANE: Jame 7, 1988 SUBJECT: STATUS AND FOSE REPCRT FCC2 THE THIRD QUAREM (JANUARY - MARCH) OF FISCAL MR 1987-88. Specific Requests) or Reoom atiaal(s) & Ba6mffam3 & Justification I. ACTION: Accept the Blackhawk G.H.A.D. Quarterly Status and Expense Report. II. FIlVNCIAL IMPACT: None III. REASCNS FUR cif BAC[ X During this quarter the district continued to complete repairs and install preventative maintenance features within Blackhawk, programs which were begun in the spring of 1987. The attached expense summary shows the district's total expenses to be approximately 50% of the anticipated annual budget, with 75% of the fiscal year completed. As to the General Repair Programs, the programs originally listed as items 16, 17 and 20 in the district's Program of Work had their own separate budgets. But in actuality, the district is continuing to do some of this work in conjunction with some of the specific repairs, but have charged all costs to the specific repairs, such as items 11, 12, and 21 through 31. It may appear that the district has exceeded some of the budgets for individual repairs, but the apparent "over-run" is actually the item 16-20 work which has been added. The quarter repairs $138,687.92 is actually just about half of the original annual budget of $256,000 IV. DOLTENCES OF NEGATIVE ACTION: None. Informational report only. continued on attachment: yes itaze� Recammendation of County Acbd_ni st-rator of Board Approve Other: C cmittee Sicg�ature(s) Action of Board on: JUN 7 1988 Approved as Reooed Other Vote of Supervisors I EM3BY COY THAT THIS IS A TRUE _X Unanimous (Abserrtt ) AND CUER]3CT COPY OF AN ACTION TAKEN Ayes AND IINIERED ON THE Ff OWJTES OF ME Noes BOARD OF SUPERVISORS CST DATE SHOW. Absent Abstain Attested JUN 7 1988 Orig. Div: Public Works (ES) PHIL BATCHELOR cc: Auditor-Controller CLERK OF THE BOARD OF SUPERVISCIRS County Counsel AND CCIUNTY Richard Nystrom Public Works - Accounting By fl/dr LSP M CIBC ghbo.7.t6 BKJY2a9W GEKKDWC ffiAZMW ABA702W DISTRICT PROJECTED BUDGET (1987-1988 FISCAL YEAR) PROJEC ED BUDGET ACTUAL EMPEXEIES FY 1987-1988 JULY-MARCH 1988 A. Projected Income 1. Balance brought forward $396,000 2. Annual Distribution Via CSA M-23 Assume $514,600/year ('187-188) to M-23 M-23 Reserve of $124,000/year Net to GRAD ( '87-'88) of $374,000/year 390,600 TOTAL INCOME: $786,600 B. Projected des 1. General Manager 50,000 23,100.00 2. Engineering Geologist and Assistant Geologist 70,000 49,640.00 3. Support services (e.g. , 0* 0 office space, office equipment, office staff and vehicles) 4. Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program. ) 256,000 138,687.92 5. Legal, accounting and insurance 10,000 0 6. Professional Soils & Geotechnical Consulting 20,000 6,275.87 7. County staff services 10,000 0 TOTAL EXPENSES $416,000 $217,703.79 8. Reserve 370,600 TOTAL BUDGET $786,600 *Included in line items 1 and 2 BLACKHMK GEOLOGIC HAZARD ABATEMENT DISTRICT PROJECTED FMPAIR AND PROJECTS 1987-1988 FISCAL YEAR (In Priority Listing) PROJECT CRIG0 201, ACTUAL COST PRIORITY PROJECT N[IrBElt ESTIIrR7ED BU0GBT JULY 187-MM '88 1 Cart Path #5 $ 2,000. 2 Burkett/Beresford-Wood #66A & B 4,000. 3 Hidden Oak Court (Wnorowski) #29 5,000. 4 Fox Creek Open Space #37-41B 16,000. 3,520.00 5 Casale #4 2,000. 6 Swim & Tennis Club A. Mud Flora #7A B. Slide #7B 2,000. 7 Fairway 13 #51 10,000. 8 Tennis Villas #23 1,000. 9 Saddleback - King #27 6,000. 1,163.00 10 McKellar #71 6,000. it Maintenance Area #52 2,000. 17,793.00 12 Blackhawk Meadow- #74 5,000. 14,221.00 Dobson 13 Blackhawk Meadow #44-47 25,000. 14 Silver Meadow #21 4,000. 2,036.00 15 Blackhawk Club Dr. #82 1,000. 16 Maintenance of Existing -- 10,000. Repairs 17 Miscellaneous Debris Walls -- 50,000. 18 Horizontal Drilled Drains -- 35,000. 23,886.00 a. Mossy Oak Dr. (B#88-8) b. Horiz. Drain Maint. (B#88-9) C. Hidden Oaks (#B88-3) d. Sequoia Terrace (#B88-4) e. Saddleback (#B88-5) PROTECT ORIGINAL ACTUAL COST PRIORITY PROJECT -NUNM E STIIrY 7W BaDGBT JULY 1874M 188 19 B-58 Drainage Ditch -- 20,000. 8,111.04 Maintenance 20 Miscellaneous Corrective -- 50,000. Grading 21 Erosion Control -- 0 5,021.12 22 Crib Wall #53 0 5,320.00 23 Chestnut #70 0 6,547.00 24 Blackhawk Club Court #83 0 20,120.00 25 Live Oak Drive #87-1 0 1,932.99 26 Live Oak Court #87-2 0 10,029.00 27 Revegetation -- 0 8,004.00 28 Camino Tassajara #87-5 0 4,629.56 29 Blackhawk Drive #B88-2 0 693.00 30 Hickory Court #B88-7 0 720.00 31 Deer Meadow #15-18 0 4,941.21 TOTAL FOR 1987-1988 FISCAL YEAR: $ 256,000. TOTAL ACTUAL COSTS (JULY 1987- MARCH 1988) $138,687.92