Loading...
HomeMy WebLinkAboutMINUTES - 06211988 - 1.89 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF FLOOD CONTROL FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: June 21, 1988 SUBJECT: Drainage Area 56, Lindsey Detention Basin Project, Project No. 7566-6D8462-86, Oakley Area Specific Request(s) or Recommendation(s) & Background & Justification RECOMMENDED ACTION: APPROVE and ACCEPT the "Easement for Storm Drain Undercrossing of Contra Costa Canal at MP 6.71, Central Valley California" from the U.S. Bureau of Reclamation and, AUTHORIZE the Chief Engineer to sign the easement document on behalf of the Flood Control and Water Conservation District. FINANCIAL IMPACT: None REASONS FOR RECOMMENDATION/BACKGROUND: The easement is needed to allow the installation of the outfall line from the Lindsey Detention Basin under the Contra Costa Canal, operated by the Bureau of Reclamation. CONSEQUENCES OF NEGATIVE ACTION: Continued on attachment: yes Signature: Recommendation of County Administrator Recommendation of Board Committee Approve Other: Signature(s) : Action of Board on: June 21, 1988 Approved as Recommended X Other Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN X Unanimous(Absent ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF SUPERVISORS ON DATE SHOWN. Absent: Abstain: Attested June 21 , 1988 Orig. Div. : PW(Constr) Phil Batchelor cc: County Administrator Clerk of the Board of Auditor-Controller Supervisors and County Design Administrator PW Accounting Contractor BJK/sa:clw ByXs�L� �, , DEPUTY bo:28.t6