HomeMy WebLinkAboutMINUTES - 04261988 - 2.03 4®003
TO: BOARD OF SUPERVISORS, AS THE GOVERNING BOARD OF CONTRA
COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION
DISTRICT
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: April 26, 1988
SUBJECT: Corps of Engineers Wildcat-San Pablo Creeks
Project Financing
Specific Request(s) or Recommendation(s) & Background &
Justification
I. RECOMMENDATION
1. ADOPT report on funding of non-federal project cost for
the Corps of Engineers' Wildcat-San Pablo Creeks
Project.
2 . REQUEST local State Legislators to support Senate Bill
502 which modifies the State Department of Water
Resources' - Federal Flood Control Project Subvention
Program to address the new federal cost sharing
requirements.
3 . CONFIRM to the City of San Pablo that the District will
meet the previous commitment of allocating $250, 000 of
Flood Control Zone 7 monies to the Phase II portion of
the Wildcat Creek Project.
Continued on attachment: X yes Signature:
Recommendation of County Administrator
Recommendation of Board Committee
Approve Other:
Signature(s) :
Action of Board on: April 26 , 1988
Approved as Recommended X Other
Vote of Supervisors I HEREBY CERTIFY THAT THIS IS
A TRUE AND CORRECT COPY OF AN
X Unanimous (Absent V ) ACTION TAKEN AND ENTERED ON
Ayes: Noes: THE MINUTES OF THE BOARD OF
Absent: Abstain: SUPERVISORS ON DATE SHOWN.
Attested April 26 , 1988
Orig. Div. :Public Works (FC) PHIL BATCHELOR,
cc: County Administrator CLERK OF THE BOARD
County Counsel OF SUPERVISORS AND
Community Development Dir. COUNTY ADMINISTRATOR
East Bay Regional Park Dist.
Senator Daniel E. Boatwright
Assemblyman Robert J. Campbell
Assemblyman Phil Isenberg
BO: 19a.t4
MFK:md By
DEPUTY CLERK
II. FINANCIAL IMPACT
Senate Bill 502 , if enacted, will provide approximately $900, 000
in additional state funding for the non-federal project costs.
The District's prior commitment to reserve $250, 000 of the Zone 7
funds for the second phase of the project within the City of San
Pablo eliminates these monies as a potential source for meeting
some of the Phase I project funding shortfall .
III. REASONS FOR RECOMMENDATION/BACKGROUND
The original plan for the Wildcat-San Pablo Creeks Phase I
project was estimated to cost $12 , 500, 000. This amount
increased to $13 , 600, 0.00 as a result of the Corps of Engineers
formulation of the project implementing federal criteria.
The original District plan for improving the lower portions of
Wildcat and San Pablo Creeks envisioned a very stark,
conventional flood control project due to the limited local
funding available to meet the local share of the non-federal
costs. The local funding consisted of $400, 000 from Flood
Control Zone 7 and $1, 200, 000 from the San Pablo Creek Assessment
District. This funding also assummed continuation of the then
existing federal cost sharing requirements which limited the
non-federal cost share to the costs of rights of way and the
relocation of existing facilities in conflict with the project.
In 1985, the Corps of Engineers issue their first Design
Memorandum changing the flood control project design to meet
federal standards. Since then, the planned facilities have been
changed significantly to minimize the use of concrete or
rocklined channels and to reestablish a natural creek environment
within the new channel . Listed below are the estimated costs
associated with each of the plans. The non-federal cost share is
the state cost share plus local cost share.
Federal Noa1-Federal State Local
Total Cost Oast Share Cost Share Cost Share Cost Share
Original
Plan $12,500,000 $8,900,000 $3,600,000 $2,200,000 $1,400,000
ODE Plan 13,600,000 7,700,000 5,900,000 3,600,000 2,300,000
Design
Team Plan 17,700,000 10,200,000 7,500,000(1.) 4,100,000 3,400,000(1)
(1) Includes 5% local cash contribution of total project cost.
The above figures show the significant increase in the non-
federal costs due to the increase in project rights of way needed
for the Design Team Plan and the change in federal cost sharing
which now requires a minimum 5% cash contribution of total
project costs. The increase in rights of way and relocation
costs resulting from the Design Team Plan is estimated to be
$700, 000. The increase in non-federal cost due to the new
federal cost sharing regulations is estimated to be $900, 000.
Presently, the State Legislature is considering Senate Bill 502
which will modify the present State Department of Water Resources
Federal Flood Control Project Subvention guidelines to address
the change in federal cost sharing regulations. SB 502 changes
the state subvention to 70% of all non-federal costs. The
additional participation by the State under SB 502 is shown
below.
Without With
SB 502 SB 502
State Share $4 , 100, 000 $5, 000, 000
Local Share 3 ,400, 000 2 , 500, 000
Total Non-Federal Cost Share $7 , 500, 000 $7 , 500, 000
Indicated below is a most probable scenario for funding the new
local share of the non-federal costs. All of the potential
funding sources are under your Boards control except for the East
Bay Regional Park District funding. During the Design Team
discussions the park district staff has indicated an interest in
helping fund some of the project amenities added to the project.
We have received one letter from them indicating their
willingness to participate.
Without With
SB 502 SB 502
Existing funding Zone 7 $ 400, 000 $ 400, 000
Existing funding San Pablo Creek
Assessment District 1, 200, 000 1, 200, 000
Drainage Area 73 (San Pablo Creek) 500, 000 200, 000
North Richmond Redevelopment Agency 400, 000 200, 000
Sale of Surplus Property 200, 000 200, 000
East Bay Regional Park District 200, 000 100, 000
Special District Augmentation Funds 500, 000 200, 000
Total Funding $3 , 400, 000 $2 , 500, 000
The above financing package is still very tentative as three of
the funding sources have significant other demands for funding.
However, it should be noted that the community is receiving
$17,700, 000 in flood control improvements at a local cost of
$2 , 500, 000 if SB 502 is approved.
IV. CONSEQUENCES OF NEGATIVE ACTION
If SB 502 does not pass our local funding for the project will be
out of balance by $1, 800, 000.