HomeMy WebLinkAboutMINUTES - 03151988 - S.1 si
TO: BOARD OF SUPERVISORS
FROM: Supervisor Tom Torlakson Contra
March 15, 1988 Costa
DATE: County
REFER TO THE INTERNAL OPERATIONS COMMITTEE THE MA F
SUBJECT: ADEQUATE NOTIFICATION TO APPLICANTS OF FLOOD CONTROL
AND FIRE DEPARTMENT REQUIREMENTS
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDED ACTION: Refer to the Internal Operations
Committee the matter of providing complete and "crystal clear"
notification to applicants of flood control and fire department
requirements.
BACKGROUND INFORMATION: There have been an alarming number
of incidents that have been called to my attention recently regarding
the county' s alleged lack of notification to applicants during the
initial stages of the process regaridng major flood control
requirements and fire code requirements.
There have been many similar situations that have occurred
having to do with applicants finding out at the 1112th hour" of major
fire department requirements.
One instance involves a minor subdivision application by Bob
Anderson (MS 588-88) of 9 .74 acres on Highway 4 near Marsh Creek Road
in East Contra Costa County. Apparently, Mr. Anderson and another
family purchased this a couple of years ago after checking with county
staff and being told he would have no problem in subdividing the
property. The two families began the process to subdivide the
property recently and only now learned they will be required to put in
over a million dollars worth of flood control and drainage improve-
ments.
On February 2, 1988, I brought up tnc matter of the need for
coordination between the Fire Departments and the Building Inspection
Department regarding the issuance. of building permits and compliance
with fire codes.
This need to establish stronger coordination between the two
agencies became evident after reviewing recent cases in which this
apparently did not occur. One situation involved the Discovery Bay
Club House not having a sprinkler system installed. A similar
situation occurred with an expansion project by Sure-fit Doors in
Pittsburg.
CONTINUED ON ATTACHMENT: YES SIGNATURE:RECOMMENDATION OF OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S)
ACTION OF BOARD ON March 15, 1958 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
X UNANIMOUS (ABSENT II, III ) 1 HEREBY CERTIFY THAT THIS IS A TRUE
AYES: NOES: AND CORRECT COPY OF AN ACTION TAKEN
ABSENT: ABSTAIN: AND ENTERED ON THE MINUTES OF THE BOARD
OF SUPERVISORS ON THE DATE SHOWN.
C C: Internal Operations Committee ATTESTED � ls- a 8CG
County Administrator Phil Batchelor, Clerk of the Board of
Supervisors and County Administrator
Mee2/7-Ee BY DEPUTY
Notification of Flood Control and Fire Requirements
March 15, 1988
Page TWO
Applicants MUST be informed at "STEP #1" of any require-
ments, whether it pertains to flood control or fire code requirements.
I have suggested in the past that FORMAL notification be given to
applicants whose project is located in any part of East County or the
county where there are drinage and flood control problems. I STRONGLY
recommend that this notification -be on a bright flyer and should
contain a signature verification by the applicant that they have read
and understand these major requirements. This verification should be
received and kept for our county files before the applicant is allowed
to proceed with the process. I haved developed the attached suggested
notification form for flood control requirements. A similar form can
be developed for fire code requirements.
As I have recommended directly in recent meetings with
department heads, I again urge the Building Inspection Department, the
Fire Chief, and the Community Development Department to immediately
implement a clearer and more focused notification for Flood Control
and Fire Code requirements. This can be and should be done
administratively prior to the Internal Operations Committee hearing.
TT:gro
Attachment
0
IMPORTANT NOTICE TO APPLICANTS
YOUR APPLICATION IS IN AN AREA THAT HAS FLOOD CONTROL AND DRAINAGE
PROBLEMS. CHECK WITH FLOOD CONTROL STAFF BEFORE YOU PROCEED ANY
FURTHER WITH YOUR SUBDIVISION APPLICATION.
CONTACT THE FLOOD. CONTROL DISTRICT AT 646-4470 AS SOON AS POSSIBLE.
•THERE MAY BE A MAJOR DRAINAGE IMPROVEMENTS REQUIRED UNDER THE COLLECT
AND CONVEY REQUIREEMENT OF COUNTY ORDINANCES AND POLICY.
Applicant Verification
I, the undersigned, verify that I have read and understand the
above statement:
Signature:
Name (Print) :
Address:
City: Zip:
Project Location: