Loading...
HomeMy WebLinkAboutMINUTES - 03151988 - 1.1 (2) ZO: BOARD OF SUPERVISORS, AS BOARD OF DIRECICIRS, Bim GEJDIDGIC HAZARD ABATEMENT DISTRICT FROM: J. MICHAEL, WNUFORD, PUBLIC WORKS DIFECIM DATE: March 15, 1988 SUBJECT: STATUS AND EXPENSE 1UTCRT FM THE SEC(M QUARTER (OCIOBER- DEC'IIMBER) OF FISCAL YEAR 1987-88. Specific Request(s) or Reo®endaticn(s) & Bachground & Justificaticn I. IUXX24MENEED ACTION: Accept the Blackhawk G.H.A.D. Quarterly Status and Expense Report. II. FINANCIAL IMPACT: None III. REASONS FIOR ON During this quarter the District continued to complete repairs and install preventative maintenance features within Blackhawk, programs which were begun in the spring of 1987. The attached expense summary indicates that expenditures including the major item of repair and maintenance programs (item #4) are slightly below 400 of the anticipated annual budget, with 50% of the fiscal year completed. As to the General Repair Programs, the programs originally listed as items 16 through 20 have their own separate budgets. But in actuality, as stated in the previous quarterly report, the district continues to do some of this work in conjunction with some of the specific repairs, but have changed all costs to the specific repairs, such as items 11, 12, and 21 through 28. It may appear that some of the budgets for individual repairs may have been exceeded, but the apparent over-run is actually the items 16-20 work which has been added. In summary, the total costs for the second quarter repairs ($103,348) is actually just about 40% of the original annual budget ($256,000) IV. CCNSEDUENCES OF NEGATIVE ACTION: None. Informational report only. Continued on attachment: yes Signature: Raoonmendaticn of County Administrator gator Reoc®er ticn Approve Other: � C�ittee Si tures Actical of Board on: MAR 15 1982 Approved as Reoc�ended_ Other Vote of Supervisors I HEREBY CEFEMY THAT THIS IS A TRUE X_ Unanimous (Absent--Z:6-' ) AND ALT CDPY OF AN ACTION TAKEN Ayes AND ENTERED ON THE MiN[TrFS OF THE Noes BOARD OF SUPERVISORS ON DATE SOW. Abse Abstain Attested MAR 1 S 1488 Orig. Div.: Public Works (ES) PHIL BAT HE DR cc: Auditor-Controller CLERK OF THE BOARD OF SUPERVISORS County Counsel AND COUNTY Richard Nystrom Public Works - Accounting By fl/ EEPC71'Y CLERK BD.FL.15.t3 BLACSBMK (EXWjOGIC HAZARD ABA3224M DISTRICT PROJECTED BUDGET (1987-1988 FISCAL YEAR) PROJECTED BUDGET ACTUAL EXPENSES FY 1987-1988 JULY-DEC. 1987 A. Projected Income 1. Balance brought forward $396,000 r. 2. Annual Distribution Via CSA M-23 Assume $514,600/year ( 187-188) to M-23 M-23 Reserve of $124,000/year Net to CHAD ( 187-188) of $374,000/year 390,600 TOTAL INCOME: $786,600 B. Projected Expenses 1. General Manager 50,000 14,520.00 2. Engineering Geologist and Assistant Geologist 70,000 30,610.00 3. Support services (e.g. , 0* 0 office space, office equipment, office staff and vehicles) 4. Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program. ) 256,000 103,348.55 5. Legal, accounting and insurance 10,000 0 6. Professional Soils & Geotechnical Consulting 20,000 5,797.37 7. County staff services 10,000 0 TOTAL EXPENSES $416,000 $154,275.92 8. Reserve . 370,600 TOTAL BUDGET $786,600 *Included in line items 1 and 2 BLACKHANK GEOLOGIC HAZARD ABATEMENT DISTRICT PROJECTED REPAIR AND IMPROVEMENT PROJECTS 1987-1988 FISCAL YEAR (In Priority Listing) PROJECT ORIG lm AcTVAL COST PRIORITY PROJECT lUMBffit ESRIIMIITED BUDGET JULY-iw. 87 1 Cart Path #5 $ 2,000. 2 Burkett/Beresford-Wood #66A & B 4,000. .r. 3 Hidden Oak Court (Fh orowski) #29 5,000. 4 Fox Creek Open Space #37-41B 16,000. 3,520.00 5. Casale #4 2,000. 6 Swim & Tennis Club A. Mud Flow #7A B. Slide #7B 2,000. 7 Fairway 13 #51 10,000. 8 Tennis Villas #23 1,000. 9 Saddleback - King #27 6,000. 1,163.00 10 McKellar #71 6,000. 11 Maintenance Area #52 2,000. 17,793.00 12 Blackhawk Meadow- #74 5,000. 14,221.00 Dobson 13 Blackhawk Meadow #44-47 25,000. 14 Silver Meadow #21 4,000. 2,036.00 15 Blackhawk Club Dr. #82 1,000. 16 Maintenance of Existing — 10,000. Repairs 17 Miscellaneous Debris Walls — 50,000. 18 Horizontal Drilled Drains — 35,000. 19 B-58 Drainage Ditch — 20,000. 6,520.00 Maintenance 20 Miscellaneous Corrective — 50,000. Grading 21 Erosion Control — 0 1,513.00 ORIGINAL ACTUAL COST PRIORITY PROTECT PROJECT NUMBER ES1' XkMD BSP JULY-DEC. 87 22 Crib Wall #53 0 5,320.00 23 Chestnut #70 0 6,547.00 24 Blackhawk Club Court #83 0 20,120.00 25 Live Oak Drive #87-1 0 . 1,932.99 26 Live Oak Court #87-2 0 10,029:00 27 Revegetation - 0 8,004.00 28 Camino Tassajara #87-5 — 4,629.56 TOTAL FOR 1987-1988 FISCAL YEAR: $ 256,000. TOTAL ACTUAL COSTS (JULY-DEC. 187) $103,348.55