THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY , CALIFORNIA
Adopted this Order on June 16 , 1987 by the following vote :
AYES: Supervisors Powers , Fanden, Schroder, Torlakson $ McPeak
NOES: None
ABSENT: None
ABSTAIN: None
RESOLUTION NO . 87/364
SUBJECT: Certification of the Environmental Impact Report and
Approval of the San Ramun Creek Flood Control Project .
Alamo Area . Pruject No . 7520- 6B8295
The Board of Supervisors of Contra Costa County as the
Governing Board of the Contra Costa County Flood Control District
RESOLVES that :
On May 19 , 1987 , the Board of Supervisors formally received
the environmental documents for the San Ramon Creek Flood Control
Project and set June 16 , 1987 at 10_ : 30 for a public hearing on
the project .
It appears from the affidavits of publication on file with
this Board that all notices required to be given for such hearing
have been duly and regularly given and all procedures to be
followed have been followed , all in accordance with Government
Code SSG061 .
The Chief Engineer recommended that the Board approve the
project :pith the modified earth channel and that the Board adopt
the findings and proposed mitigation measures presented in County
Planning Commission Resolution No . 20- 1987 .
The Board hereby CERTIFIES that the Environmental Iwpact
Report , submitted to it by the Flood Control District , as to the
environmental impact of the San Ramon Creek Flood Control
Project , has been completed in compliance with the California
Environmental Quality Act , and it has reviewed and considered the
information contained therein . This Board ACKNOWLEDGES that the
project would have certain environmental effects and ADOPTS the
findings and mitigation measures expressed in Planning Commission
Resolution No . 20- 1987 which mitigate those effects .
This Board further ALKNOWLEDLES that the project contained
in the Final Environmental Impact Report will have certain
environmental effects which have been only partially mitigated or
which have not been mitigated . These effects are as follows :
Future land use and hydrology ; traffic and circulation ;
water quality; wildlife and vegetation ; geology, soils and
earthwork ; noise ; air quality ; cultural resources ; and
growth inducement .
RESOLUTION 87/ 364
This project alternative was deemed best when all impacts
were considered . There is a great long-range economic and social
benefit attributable to flood protection and subsequent removal
of areas from the HUD flood hazard areas . Also , on an economic
basis , this is the lowest cost alternative which provides flood
protection . For these reasons , the Board FINDS that these
overriding social and economic needs outweigh the physical
impacts which may be attributable to the proposed project . The
project as --proposed will correct the existing significant
negative impact of flooding .
The Board hereby APPROVES the project and DIRECTS the Chief
Engineer to commence acquisition of the various rights of way
needed for the project and to file with the County Clerk a Notice
of Determination for this project .
1 hereby certify that this Is a true and correct copy of
art action taken and entered on tha minutes of the
Board of Supervisors on the date shown.
ATTESTED: AIN 1 F 1987
PHIL BATCHELOR, Clerk of the Board
of
Supervisors and County Administrator
By l,lA�1�r 2n.. /1 t�.11ra�� , Deputy
Originator: Public Works -( FC )
cc: County Administrator
Community Development -
County Counsel
Chief Engineer
City of Walnut Creek
1666 N . Main Street
Walnut Creek , CA 94596
JPM:md
BO:srlmo .t5
RESOLUTION NO. 87/364