Loading...
HomeMy WebLinkAboutMINUTES - 04281987 - 1.2 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: April 28, 1987 SUBJECT: Lone Tree Way Widening Design, Project No. 0662-6R4010-85 Specific Requests or Recommendation(s) & Background us ica ion I. RECOMMENDED ACTION: Approve consulting services agreement with Nolte and Associates for engineering services for the Lone Tree Way Widening Design. II. FINANCIAL IMPACT: The maximum contract cost which is not to be exceeded without written approval by the Public Works Director is $60,002.98. It is to be funded by the State of California (10%) and Federal funds (90%). III. REASONS FOR RECOMMENDATION/BACKGROUND: The project qualified as a Federal-Aid System Project in 1985 and will provide for a through lane in each direction and a two-way left turn lane at three separate intersections and in front of a high school . The services of a consultant are required to complete the design because insufficient staff presently exists to accomplish the work with County forces. Interviews were conducted with four engineering consultants , and Nolte and Associates was selected and submitted an acceptable proposal . VI. CONSEQUENCES OF NEGATIVE ACTION: If engineering services are not provided by consultant, the completion of final construction plans, will be delayed and the County could lose Federal-Aid Funds for both design and construction of this project. Continued on attachment: yes Signature: c Recommendation of County Administrator Recommend on of Board Committee Approve Other: Signature(s): Action of Board on: APR 2 8 1987 Approved as Recommended !/� Other Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE / AND CORRECT COPY OF AN ACTION TAKEN Unanimous . (Absent .TIC ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF SUPERVISORS ON DATE SHOWN. Absent: Abstain: Attested APR 2 8 1987 Orig. Div.: Public Works (Design) Phil Batchelor Clerk of the Board of Supervisors cc: County Administrator and County Administrator Auditor-Controller P.W. Accounting Road Engineering AMF/bb By bo:d.28.t4 --Deputy