Loading...
HomeMy WebLinkAboutMINUTES - 03031987 - 1.15 TO: BOARD OF SUPERVISORS, AS BOARD OF DIRECTORS, BLACKHAWK GEOLOGIC HAZARD BATEMENT DISTRICT FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: March 3, 1987 SUBJECT: STATUS REPORT FOR THE SECOND QUARTER (OCTOBER-DECEMBER) OF FISCAL YEAR 1986-87 FOR THE BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT (G.H.A.D.) Specific Requests or Recommendation(s) b Background Justification I. RECOMMENDED ACTION: 1. Accept the Blackhawk G.H.A.D. Quarterly Expense Report. 2. Accept the Blackhawk G.H.A.D. Quarterly Project .Status Report. 3. Ratify Construction Contracts with Sands Construction Company. 4. Approve reallocation of budget items. II. FINANCIAL IMPACT: None. III. REASONS FOR RECOMMENDATION/BACKGROUND: On June 24, 1986 the county Board of Supervisors, acting as the Board of Directors of the Blackhawk Geologic Hazard Abatement District, passed several resolutions to establish the G.H.A.D. , its budget, its project repair program, and its requirement for quarterly progress reports to the Board of Directors. Attached is the quarterly report for the second. quarter (October-December) of the Fiscal Year 1986-87. The status of the Blackhawk G.H.A.D. repair program as of December 31,1986 i.s in excellent condition, both as to the repairs which have been accomplished and the ability to keep the G.H.A.D. operation expenses well below the originally anticipated budget. The enclosed Quarterly Expense Report shows that the district has completed nearly all of the repairs originally anticipated for July to December 1986, with all of the projects (except one) anticipated to be completed significantly below budget. The exception is the Burkett/Beresford-Wood repairs (#66A & #66B) which is expected to cost $60,900 instead of the original estimated cost of $60,000. In summary, the total cost of all projects which have been (or are nearly) completed is approximately $160,000 which is almost 50 percent less than the $300,000 originally budgeted for these projects. Similar though smaller savings are anticipated for the remainder of the fiscal year. It is expected that this can eventually result in a savings to the homeowners of the Blackhawk properties. The Quarterly Project Status Report shows the updated status of each project with its percent completion and updated cost to date. Continued on attachment: X yes Signature: L Recommendation of County Administrator ecommen ion of Boa onmittee Approve Other: Signature(s): Action of Board on: MAR 3 1997 Approved as Recommendedher Vote of Supervisors I. HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN V/'Unanimous (Absent ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF. SUPERVISORS ON DATE SHOWN. Absent: Abstain: Attested MAR 3 1981 Orig. Div.: Public Works (ES) PHIL BATCHELOR cc: Auditor-Controller CLERK OF THE 8M OF SUPERVISORS Richard Nystrom AND COUNTY ADMINISTRATOR County Counsel Public Works - Accounting By DEPUTY CLERK On January 13, 1987 the Board ratified emergency construction contracts for the Burkett/Beresford-Wood slide repairs for a total of $35;000 (Board ratifiction is needed for contracts exceeding $20,000) . Since the orignal submittal , an additional authorization of $17,500 has been given to the Sands Construction Company in order to construct the final Phase IV of the slide repairs. The additional work is as described on the two enclosed authorization forms dated November 15 and December 5, 1986. These forms are submitted for Board ratification. This repair project has been by far the most complicated of the entire repair program, but the district staff feels that both of. these slides have been stabilized and can report that the two homeowners are pleased with the results. After six months of experience in working with the repair program the GHAD staff has found that, instead of constructing major mass grading slide repairs and major retaining wall structures, the more successful solution has been found in the implementation of several smaller repairs to many of the slides. While this revised program has resulted in significant savings in the construction budget of every project except one,* it has entailed additional expense in the district' s design and administrative budgets. Therefore Board approval is requested for the following adjustment in the district's annual. budget for Financial Year 1986-87. 1. Decrease construction repair budget from $400,000 to $360,000. 2. Increase General Manager budget from $50,000 to $70,000. 3. Increase District Geologist budget from $70,000 to $90,000. 4. Total budget for FY 1986-87 remains unchanged at $655,000. IV. CONSEQUENCES OF NEGATIVE ACTION: The district will be unable to meet the projected inrease in design and administrative costs. ghad.blkhwk.stat.res C_of-41 BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT QUARTERLY EXPENSE REPORT (SUMMARY OF JULY-DECEMBER 1986) APPROVED BUDGET ACTUAL EXPENSES FY 1986 .- 1987 (JULY-DEC. ' 86) A. Project Income 1 . Initial Funding (CSA M-23) $405 ,000 2 . Annual Distribution Via CSA M-23 Assume $350 , 000/year to M-23 M-23 Reserve of $100 ,000/year Net to GHAD of $250,000/year Assume Distribution 50% on 6/30/86 50% on 1/1/87 Therefore: June 30 , 1986 $125, 000 January 1 , 1987 125 ,000 TOTAL $655 ,000 B. Projected Expenses 1 . General Manager $ 50 ; 000 $43 , 560. 2 . Engineering geologist and geologic assistant 70,000 $4.9 , 885 . 3 . Support services (e.g. , office space, office equipment , office staff and vehicles) - * $ 0. .:4 . Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program) . $400,000 $124 ,969 . 5 . Legal , accounting and insurance 40, 000 $ 4 ,998 . 6. County staff services 15 ,000 0 7 . Reserve 80 , 000 $ 0 TOTAL TOTAL BUDGET $655 , 000 EXPENSES $223 ,412 . (JULY-DECEMBER 186) *Included in line items 1 and 2 . 3 3 3 3 3 y c c m c ro ro ro rorn c c Y Z O % O V U U U Ud u u ro u (am m m -+ u Z u - W 7 7 41 L.. 41 7 •� � n v y 7 L L c. 41 6. 41 + q ✓ 4 L c. m W W W ++ c U 4J 1. « « Qa « « « « v at 41 V ✓ O 0) O ++ ++ O a+ d L a - ^I C-• a 0.D 0. C D A D D a ++ C ti ✓ C a a E 0 a Oa E E E 0 0. C of a! at Qa 9 u O a U 0 9 9 O U E U E 0 O 1.. O U E O ++ F. ♦+ Ir ++ u. +•' t+ O 7 U 9 ? 1. U O O Nl o O O u o v o E v-+ 4+-+ 4+n m•, v H 0 7! tiU 4U :4 I+U m ro •• m •, ro 41 4U W 41 >a N 41 N t. 47X x y0!1OO.. T3 R1 V OO OO z4OO G N x UE W UE 4UE 0 E 0 O C X C m M! O O OZO O — O O O C O 0 7 O r T bC 10n1 OO UO' O- n y «m ca -.O �. r 01 O u .+ N O O O O O 10 O N O N 10 0I Gv LO O 41 I h (D hl v Z m1h :� !7 T.n h h 011 01 w (mi O a _!v D b m. 4 . X v a F w .. U q .7 vi 3 I H F d O T O) C F 1' " U Z F z z 3 w,< a soa mFn a< o' y xSto tU! . <M. T Z 010 0 O 10 O 01 O O O O O O O O O O O h l c0 w « w:Cl) y O C.) O N O O O O O O O O O O 1 OD .•t!10 N q -+ C7 E.01 O 10O ID O h O O O O O O O O O O <T O 0:mi- o N N O 10 h o 10 o O O O O LO O (] (71 O FIN (p 17 M N N It N Y la 17 N N N V !7 ♦IAI T h'nl of i a to a C7<10 mi rn 4r) 0) `4 m a C v oq ca Lb co m zI F - W U O ZI a 4 CD I I n a -1 FI 0 rn m M1 n 4 O N Q n r 4 co m D1 Ulm W N v m v .-1 M1 N !7 ) fp m h N 1 N M1 W O ooI dl • tt 1 K M O ItL N it X >M h 01I h! ^I a0,� 1.7840 K': a1 U w DFD U) O 1••7 ml M wy0 _ i 0 O IU+710 � .� cM1p ,Y�4,U ml O v aJ toOI 3 0 3 h u r •'+ib• w � In ro D 3 c e I x OI «_ a 00 d 0 a oxo y! to cc u z O i... C y U w v C +1 w aa) -C M 4: w 7 uy c 'O 0 ro 4. -+ N O N 4! 0 C�+ > x 0 0 IO M m U 3 rn a D^• - 1 to SC 1 04 F! 1. O N O 3 c E y O 1•. 1 "1 N O>• a:i 0 Y L. O c a q Ol A( .r .••c G Jf w o0 C4 a.. ++ O C 4) O 41 m F N 0. OV 10 10 m > C to 10 V 1.]q Z w: FI(a -.+� 3 0.. L V • - K (v T -. C O w A q <W ca X U:a. « f I 4) I y<WO ro - C " N -40 4) r FUU Dm v v U U ^ u 3 U) x X N U a > ++ y ^I b c b 't3 Y q>>q.7 6 a.U m 2 w [o U q N ca rI w M a Z F 4 y Y N<m F f/N H • U� W' rh Q a. T: { F• } M: IYi O o N N to Sll M1.. N l7 V .1!) l0 h m 01 .-t .-1 N -r n .•a n .+ n H w� a. co a < - 1•. n n h CO m M m rn rn rn n n Y n U C C 0 C n n T n d 0 is 0 a,C Y Y C . 0 0 0 o u o 0 o o 4 ; +) C C U Q E E U U C U OO 7 O O 7 O 01 7 Nl F 8 U U E 7+ 7 \ \ Y Y \ Y 0 X 0 C 'O a 0 E.1 .0 0 O O C 0 0 0 ya =l s° U U S U U J , _ N lm� 0nl xI .I O O O N O O O O Cal ul rn o 0 X'm WI 11 i 71 N FI N, Oi UI O O O O O O O O OI O O O O O O O O O O O ' m a o 0 0 0 0 0 0 0 of o FI N v N u) h rn b m u)I h . 7 N N 0 SI n N HI 0 NI y pal N N n Y 4 O ti O < al U ti m M :I 04 =l I m n C1 N v v O q Fi h u) n n • v !D Oi � OUII i M i 4 ti .�R • • 11 N O OI a u v u c > a a m 0 o M 1 H O dl q 3 0 C 0 n 0 O q N O F7 q Ir O 3i N V Y C i q F O q 0 F O 0 q m d 0 ` O U E C - I O H Y U O b U •+ �+ C Y 0 O .1{ C '+ q 3 w 0 7 O 0 'O Y .d4 4 �I 3 v x c 0 o a w .2 00 a ci w .w11 1] C U C ti 4 U d q r•. OI -. n q 0. q 4 q 0 0 ' 4 bail U I m S O' G0. m ao Z ml., 11 y A O NI al HI n N F m 01 a ai w Br�ACHI-3ATi�� GEOL.00'IC I; Z.A12D � �iB�1 D=STR=C'r c/o Nystrom Engineering 700 Ygnacio Valley. Road, Suite 320 .Walnut Creek, California 94596 • November 15 , 1986 Contractor: Sands Construction Compal P. 0. Box 1125 _ Lafayette, CA 94549 SUBJECT: Burkett & Beresford-Wood Slides (*66A & B) , Blackhawk Dear Contractor : You are hereby directed to proceed with the following construction work for repair of the subject land slide: Construct 3 feet high retaining wall in lower area of rear' bank slope 7of both yards , : including installation of retaining wall posts : The cost of your work shall...not exceed $10,000. Your work is to be done .under.. . the direction of John LaViolette, Staff Geologist., and in accordance with Contra Costa County .Standard Specifications . 'This work:' is to •:be done .'.on. a:.. "time and. materials" .basis at the standard hourly ,labor, and equipment rates which you submitted to us dated September 16 , 1986 . This ..work . will also be covered by' the Workmans Compensation Certificate which you submitted to us dated August -26 , 1986 and the Insurance w1ndemnity. ;coverage ,._. a rcertification which you .also submitted to.:.us dated August 26, . 1986. - ,,.. Your work should =progress :-yin: an expeditious manner, ,.,order: .:to be ompleted before.-":the rainy 's.eason - `and : to. coordinate.: >.with: .other ..construction Thank :you-:for our, assistance: ;in ..this:: repair : ro ect : . . .. . . . ,.: ...,:. erruly. 'yours.: :..... • . ��=. . - -Bl.ackhawk Geologic Hazard Abatement D ict 1. :.-:. 67 :........ . A. _ General Manager RAN. Sanbur 5.dc _ 1 k. c3aro=.oa=c � n=sem.=cr c/o Nystrom Engineering 700 Ygnacio Valley Road, Suite 320 Walnut Creek, California 94596 December 5 , 1986 Contractor: Sands Construction Company P. 0. Box 1125 Lafayette, CA 94549 SUBJECT: Burkett & Beresford-Wood Slides (*66A & B) , Blackhawk Dear Contractor: You are hereby directed to proceed with the following construction work for repair of the subject land slide: fill lower retaining wall caisson holes with concrete ; construct additional length of lower wood retaining wall behind Beresford-Hood pool; install drainage discharge system around Burkett patio-yard area; construct full sized standard B- 58 concrete drainage ditch above upper retaining wall . The cost of your work shall not exceed $7,500. (This authorization is In addition to the previously issued authorizations for this project. ) Your work is to be done under the direction of John La Violette, Staff Geologist , and in accordance with Contra Costa County Standard Specifications . This work . is to be done on a "time and materials" basis at the standard hourly labor and equipment rates which you submitted to us dated September 16-, 1986 . This work will also be covered by the Workman Compensation Certificate which you submitted to us dated August 26 , 1986 and the Insurance Indemnity coverage , a certification which you also submitted to us dated August 26, 1986. Your work should progress in .an expeditious manner in order to be completed before the rainy .season and to coordinate with other construction projects. Thank you for your assistance in this repair project. Very truly yours, Blackhawk Geologic Hazard Abatement .1 t c 1 chard A. liyst General Manager RAID.jg Senburb.dck BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT QUARTERLY EXPENSE REPORT (SUMMARY OF JULY-DECEMBER 1986) APPROVED BUDGET FY 1986 - 1987 A. Project Income 1 . Initial Funding (CSA M-23 ) $405 ,000 2 . Annual Distribution Via CSA M-23 Assume $350, 000/year to M-23 M-23 Reserve of $100, 000/year Net to GHAD of $250, 000/year Assume Distribution 50% on 6/30/86 50% on 1/1/87 Therefore: June 30 , 1986 $125 , 000 January 1 , 1987 125 , 000 TOTAL $655, 000 B. Projected Expenses 1 . General Manager $ 50,000 2 . Engineering geologist and geologic assistant 70,000 .3 . Support services (e.g. , office space, office equipment, o • .. ...... .. .. •:y5:',:.. ', andvehicles) s equ face staff 4 . Repair, maintenance and i.An•irl. improvements (as per approved :,:.... . Repair, Maintenance and Improvement Program) . $400, 000 5 . Legal , accounting and insurance 40,000 6. County staff services 15,000 7 . Reserve 80,000 TOTAL BUDGET $655 ,000 *Included in line items 1 and 2 . Vii: