SUBJECT; REINSTITUTION OF AND APPOINTMENT TO FLOOD CONTROL
ZONE 2 ADVISORY BOARD.
SPECIFIC REQUEST(S)'OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
. RECOMMENDED ACTION: Reinstitute the Flood Control Zone
Advisory Committee and appoint the following as its members:
Dudley Young
P. 0. Box 718
Brentwood, CA 94513
Don Christianson
Rt. 1, Box 17C
Brentwood, CA 94513
Jerry Tennant
Rt 161F
Byron, CA 94514 .
Fred Specht
P. 0. Box 273
Byron, CA 94514
Tony Silva
6.34-4871
Roberta Fuss `
2415 Discovery Bay Blvd.
Byron, CA 94514
BACKGROUND INFORMATION: Both the Flood Control
. District and the Soil Conservation Service staffs have had
difficulty in developing a project that is economically
feasible, i.e. , a project having the desired level of
protection and costing less than $3 ,200,000. They have
determined that the only project which meets this criteria
is the detention basin alternative, located west of Walnut Blvd.
and south of Marsh Creek Road.
CONTINUED ON ATTACHMENT; YES
SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR •+.
RECOMMENDATION OF APPROVE OTHER
BOARD COMMITTEE
`•_
SIGNATURE(S):
ACTION OF BOARD ON July 15 1986
APPROVED AS RECOMMENDED X ~
._.� OTHER
VOTE OF SUPERVISORS
. X UNANIMOUS (ABSENT IV
I HEREBY CERTIFY THAT THIS IS A TRUE
? .
AYES: NOES: AND CORRECT COPY OF AN ACTION TAKEN
AND ENTERED ON THE MINUTES OF THE
ABSENT; ABSTAIN: BOARDOF SUPERVISOR ON THE DATE SHOWN.
CC: Appointees
Public Works Flood Control ATTESTED
County Administrator PHI BATC ELOR. CLERK OF THE BOARD OF
SUPERVISORS AND COUNTY ADMINISTRATOR
M38211-83 BY ��
DEPUTY
i
Reinstitution and appointment
to Flood Control Zone 2 Advisory Board
July 15, 1986
PAGE .TWO
They have now completed the hydrology-hydraulic design
for the detention basin. In addition, a preliminary soils
report for the site is near completion, and they expect to
have the project draft Environmental Impact
Report-Environmental Impact Statement ready for public
review this fall. The Administrative Draft Environmental
Report is currently being reviewed by the Soils Conservation
Service.
In anticipation of more community involvement in the
project development review process, I feel this is an appropriate
time to reinstitute the Flood Control Zone 2 Advisory Board.