TO: REDEVELOPMENT AGENCY
FROM: PHIL BATCHELOR, EXECUTIVE DIRECTOR
DATE: April 29, 1986
SUBJECT: Authorize Contract Change Order No. 12 for Pleasant Hill BART Station Area Storm
Drain, Sanitary Sewer and Other Miscellaneous Improvements.
Project No. 7891-6X5548-85.
Specific Requests or Recommendations & Background & Justification
RECOMMENDED ACTION:
AUTHORIZE Chief Engineer to execute Contract Change Order No. 12 for changes in plans for
sewer and storm drains for the Pleasant Hill BART Station Area Storm Drain, Sanitary Sewer
and other miscellaneous improvements, Project No. 7891-6X5548-85.
FINANCIAL IMPACT:
Completes installation of the underground improvements previously funded by Assessment
District 1983-1. Relocation of the storm drain by a developer is being paid by the developer.
REASONS FOR RECOMMENDATION/BACKGROUND:
Contract Change Order No. 12 compensates the contractor for two changes in plans. The
first provides for change in alignment in the North Main Street sewer main. A major utility
conflict required a change in location of the main. The second change was required to
relocate the 84-inch storm drain into Jones Road to eliminate significant shoring costs
. for construction of the basement of the Pacific Plaza Project. The additional cost of the
change is being paid by the developer.
Because this change order and ,previously approved change orders collectively exceed $25 ,000,
, .Agency approval is required.
"' Continued on attachment: yes Signature:
C,
Recommendation of Executive Director Recommendation of Agency C ittee.
Approve Other:
Signature(s):
Action of Agency on: MAY 6 1986 Approved as Recommended Other
Vote of Commissioners I HEREBY CERTIFY THAT THIS IS A TRUE
/ AND CORRECT COPY OF AN ACTION TAKEN
y Unanimous (Absent ) AND ENTERED ON THE MINUTES OF THE
Ayes: Noes: REDEVELOPMENT AGENCY ON DATE SHOWN. .
Absent: Abstain:
Attested MAY 6 1986
Orig. Div.: Redevelopment Agency (D/C) Phil Batchelor
cc: Redevelopment Director Agency Secretary
Auditor-Controller
Chief Engineer
Design & Construction
Public Works Accounting
ByJJ4,tiDEPUTY
PHchgeord.t4
bb