HomeMy WebLinkAboutMINUTES - 03251986 - 1.13 1 /3
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on March 25, 1986 by the following vote:
AYES: Supervisors Fanden, Schroder, McPeak, Torlakson and Powers
NOES: None
ABSENT: None
ABSTAIN: None
SUBJECT: Approval of Consulting Services Agreement with Allstate Geotechnical
Services; Trembath and Oakley Detention Basins, Antioch Area.
Project No. 7566-6D8456-86, Antioch
The Chief Engineer having advised that a soils investigation is required to
design the Trembath and Oakley Detention Basins in the Antioch Area; and
The Chief Engineer having further advised that proposals were solicited from
several geotechnical consultants, with Allstate Geotechnical Services of San
Ramon submitting the most acceptable proposal ;
IT IS BY THE BOARD ORDERED, as the governing body of the Contra Costa County
Flood Control and Water Conservation District, that the Consulting Services
Agreement with Allstate Geotechnical Services for the soils investigations is
APPROVED and the Chief Engineer is AUTHORIZED to execute the Agreement at a cost
not to exceed $18,640 without his written approval .
I hereby certify tha:this Is a true and correcS copy of
an action taken and entercu on the rntnutes of the
Board of Supervisors on the date shown.
ATTESTED: MAR 25 1966
PML BATCHELOR, CSerk of tho Soard
of Superviscrs and Co niy Administrator
By �_. Deputy
SYM:sj
Geo.t3
Orig. Dept. Public Works Department (FCD)
cc: County Administrator
Auditor/Controller
Attn: Contracts Division
Public Works Department
Accounting
Allstate Geotechnical Services
350 Cameron Circle
San Ramon, CA 94583