Loading...
HomeMy WebLinkAboutMINUTES - 07161985 - X.16 .. x. 16 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on July 16, 1985 by the following vote: AYES: Supervisors Powers , Torlakson and Fanden NOES: None ABSENT: Supervisors Schroder and McPeak ABSTAIN: None SUBJECT: In the Matter of Award of Contract for Construction of First Street Cul-de-sac, Project No. 7527-6D8613-84, North Richmond Area. Bidder Total Amount Bond Amounts George P. Peres Company $26,899.00 Payment $13,449.50 120 South 23rd Street Faith. Perf. $26,899.00 Richmond, CA 94804 J. Huizar and Sons, Inc. — Gallagher & Burk, Inc. Hess Concrete Construction, Co., Inc. Dawson & J. R. 's Construction, Inc. Carone Brothers Excavating McNamara Construction, Inc. Ransome Company The above-captioned project and the specifications therefor being approved, bids being duly invited and received by the Chief Engineer; and The Chief Engineer recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED, as the governing body of the Contra Costa County Flood Control and Water as District, that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the unit prices submitted in said bid; and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the Public Works Department shall prepare the contract therefor. IT IS FURTHER ORDERED that, after the contractor has signed the contract and returned it together with bonds as noted above and any required certificates of insurance or other required_ documents, and the Chief Engineer has reviewed and found them to be sufficient, the Chief Engineer is authorized to sign the contract for this Board. IT IS FURTHER ORDERED that, in accordance with the project specifica- tions and/or upon signature of the contract by the Chief Engineer, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned. thereby certify tha:this is a true and correct copy of an action taf:cn and entered on the minutes of the . Board of Supervisors on the date shown. ATTts.ED: JUL 19 16�9A PN:t. DATC:ii t.CF1,Clerk of the Beard Orig.Dept.: Public Works Department of Supervisors and County Administrator Design and Construction Division , cc: County Administrator By Deputy County Auditor-Controller Public Works Director/Chief Engineer Design and Construction Division Accounting Division Contractor BO:AwdlstSt.t7