Loading...
HomeMy WebLinkAboutMINUTES - 07101985 - 1.5 THE BOARD OF SUPERVISORS CONTRA COU:`: ';•SALIFORNIA . Adopted this Order on July 10, 1984 1 by the following vote: AYES: Supervisors Powers , Fanden, Schroder, Torlakson NOES: None ABSENT: Supervisor McPeak SUBJECT: Right of Way Acquisition Marsh Creek Road Reconstruction Project No. 0671-6R6709 IT IS BY THE BOARD ORDERED that the Temporary Construction Permit dated June 20, 1984 from Alfred G. Schwartz and Norma S. Schwartz is APPROVED. The Temporary Construction Permit allows the County to remove from the Permitters' property, at the option of the County, up to 35,000 cubic yards of fill material . If said material is required, the Permitter is to be paid $3,000.00 for the first 30,000 cubic yards and $ .10 for each additional cubic yard required. The Public Works Director is AUTHORIZED to execute the Permit on behalf of the County. 1 hm"otl►the thM N•trwaAdooR�ct °� •n s~tsk"and oe 9W a!tIw Mears a supgrdem an ow deb dWW 4� � LSSO ,COUNTY CLERK 7 •x offklo Clerk of the Board By .oe�fir t Orig. Dept.: Public Works (R/P) cc: P.W. Accounting Grantor (via R/P) s.