HomeMy WebLinkAboutMINUTES - 07101985 - 1.5 THE BOARD OF SUPERVISORS
CONTRA COU:`: ';•SALIFORNIA .
Adopted this Order on July 10, 1984 1 by the following vote:
AYES: Supervisors Powers , Fanden, Schroder, Torlakson
NOES: None
ABSENT: Supervisor McPeak
SUBJECT:
Right of Way Acquisition
Marsh Creek Road Reconstruction
Project No. 0671-6R6709
IT IS BY THE BOARD ORDERED that the Temporary Construction Permit dated
June 20, 1984 from Alfred G. Schwartz and Norma S. Schwartz is APPROVED.
The Temporary Construction Permit allows the County to remove from the
Permitters' property, at the option of the County, up to 35,000 cubic
yards of fill material . If said material is required, the Permitter is
to be paid $3,000.00 for the first 30,000 cubic yards and $ .10 for each
additional cubic yard required.
The Public Works Director is AUTHORIZED to execute the Permit on behalf
of the County.
1 hm"otl►the thM N•trwaAdooR�ct °�
•n s~tsk"and oe 9W a!tIw
Mears a supgrdem an ow deb dWW
4�
� LSSO ,COUNTY CLERK
7
•x offklo Clerk of the Board
By .oe�fir
t
Orig. Dept.: Public Works (R/P)
cc: P.W. Accounting
Grantor (via R/P)
s.