Loading...
HomeMy WebLinkAboutMINUTES - 06041985 - 1.19 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on June 4, 1985 by the following vote: AYES: Supervisors Powers , Schroder, McPeak, Torlakson and Fanden NOES: None ABSENT: None ... ABSTAIN: None RESOLUTION NO. 85/ 279 SUBJECT: Providing Assurances to the Army Corps of Engineers in Connection with Construction of the San Ramon Creek Bypass Flood Control Channel, Project No. 7520-668636-84, Flood Control Zone 3B, in the Walnut Creek Area. WHEREAS the U.S. Army Corps of Engineers, Sacramento District, will advertise for bids on June 11, 1985 for the construction of the San Ramon Creek Bypass Flood Control Project, Phase I, which channel will extend from Mt. Diablo Boulevard north to Civic Park in the City of Walnut Creek; and WHEREAS the Army Corps of Engineers has requested the District to provide them with such assurances as are necessary to initiate project construction. NOW, THEREFORE, BE IT RESOLVED by this Board, as the governing board of of the Contra Costa County Flood Control and Water Conservation District, that the the following assurances are hereby provided; (1) The project right-of-way will be available for the construction of the San Ramon Creek Bypass Project, Phase I, either as a temporary construction easement, a permanent easement, a right-of-entry, by eminent domain, or in fee title after July 31, 1985; and (2) The utilities which lie within the design channel cross section will be relocated outside the channel;...cross section by July 31, 1985. 1 hereby certify th&. thls Is a trueandearrect copy of an accon taken an-d entered on the minutes of the Board of Supervisors on tho date shown, ATTESTED: .m 4 1985 PHIL BATCHULCR, Cork of the Board o!Supervisom and County Administrator By ��_, � ,Deputy Orig. Dept: Public Works Department Flood Control Planning cc: County Administrator Public Works Director Flood Control Planning Accounting Corps of Engineers (via Flood Control) EV:pg LIB:ConstSRbypas.t5 RESOLUTION NO. 85/ 279 1 . US Army Engineers R/W assurances auth 2 . SR Creek bypass proj phase 1 Walnut Creek 3 . CCC Flood control WCD Zone 3B 4: Same as 2 above