HomeMy WebLinkAboutMINUTES - 05071985 - 1.11 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on May 7, 1985 by the following vote:
AYES: Supervisors Schroder, McPeak and Fanden
NOES: None
ABSENT: Supervisors Powers and Torlakson
ABSTAIN: None
SUBJECT: Accepting the U. S. Army Corps of Engineers' Lower Pine and
Galindo Creeks Project - Phase III for Operations and Maintenance,
Concord Area, Flood Control Zone 3B.
The Chief Engineer having reported that the Corps of Engineers
has notified the Contra Costa County Flood Control and Water Conservation
District that the Lower Pine and Galindo Creeks Project channel improvements
for Phase III are complete and ready for acceptance by the District; and
The Chief Engineer having recommended that the District accept said
improvements for operation and maintenance.
IT IS BY THE BOARD ORDERED, as the governing body of the Contra Costa
County Flood Control and Water Conservation District, that the recom-
mendation of the Chief Engineer is APPROVED.
Ihereby cvrt!1y!hC,Ihts to a tn+e and correct copy of
an actlan taken and ente.red on the anlnutes of the
Board of Supervtsors on the date shown.
ATTESTED: AAY 7 1285
PHIL BATCHELOR,Clerk of the Board
of Supenisors and County Administrator
By .Deputy
Orig. Dept. Public Works Department (FCD)
cc: County Administrator
Public Works Director
Flood Control Planning
Maintenance Division
District Engineer
U. S. Army Corps of Engineers
650 Capitol Mall
Sacramento, CA 95814
fc:pinegalcrks5.7bo.t4