HomeMy WebLinkAboutMINUTES - 05211985 - 1.18 CORRECTED COPY! -
w PLEASE DESTROY
PREVIOUS ISSUE
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on May 21, 1985 by the following vote:
AYES: Supervisors Powers, Schroder, Torlakson and Fanden
NOES: None
ABSENT: Supervisor McPeak
ABSTAIN: None
SUBJECT: Joint Exercise of Powers Agreement for the Construction -bf
Drainage Area 40A Storm DrAin line B and Tributary Storm Drains. Project
No. 0662-6S4251-8d, Martinez Area.
The Public Works Director having advised that a Joint Exercise
of Powers Agreement between Contra Costa County and the Contra Costa
County Flood Control and Water Conservation District is necessary to fund
the construction of Line B and various feeder lines,
IT IS HEREBY ORDERED that this Board, as the Board of Supervisors
of Contra Costa County and as the governing board of the Contra Costa
County Flood Control and Water Conservation District, APPROVES the Agreement
and AUTHORIZES its Chairwoman to execute the Agreement.
(hereby certify tho:this Is a true end correct COPY of
an action taken and entered on the minutes of the
Board of Supervisors an the data shown.
ATTESTED: M&Y 211995
PHIL BATCHELOR,Clerk of the Board
of Supervisors and County Administrator
B, •Deputy
Orig. Dept. Public Works Department
Design & Construction Division
cc: County Administrator
County Auditor-Controller
Public Works Director
Design and Construction Division
Accounting Division
Flood Control District
BO.JEPDA40A.t4
i -
JOINT EXERCISE OF POWERS AGREEMENT
DRAINAGE AREA 40A — LINE B AND
VARIOUS TRIBUTARY LINES
1. PARTIES
Effective May 21, 1985, the County of Contra Costa, a political
subdivision of the State of California, hereinafter referred to as COUNTY,
and the Contra Costa County Flood Control and Water Conservation District, a
political subdivision of -the State of California, hereinafter referred to as
DISTRICT pursuant to Government Code Section 6500, et. seq., for the benefit
of the area identified by DISTRICT as Drainage Area 40A mutually agree and
promise as follows:
2. PURPOSE AND SCOPE OF WORK
To reduce flooding in the Mountain View area of Martinez, identified by
the DISTRICT as Drainage Area 40A, COUNTY proposes to extend the storm drain
shown on DISTRICT Drainage Area 40A Plan as Line B. The extension of Line B
will link two existing segments of Line B. To ensure that Line B operates
to its design capacity, it is further proposed that certain tributary storm ;
drains (along Monterey Avenue, Lemon Street, Bella Vista Avenue, Plaza
Drive, Sycamore Street and Delacy Avenue) also be installed. The Line B
extension is about 600 feet in length. The total length of the tributary
storm drains is about 1,750 feet. It is to the advantage of the DISTRICT to
participate in the project to eliminate the necessity of modifying COUNTY
improvements at a future date.
3. METHOD
COUNTY shall prepare the plans and specifications, advertise for bids,
award the project in the COUNTY'S name, administer the contract, and perform
all construction inspection. DISTRICT participation shall consist of
contributing its fair share of the project cost as set forth in Section 4
from currently available Drainage Area 40A funds. DISTRICT'S contribution
shall be paid to the COUNTY no later than 30 days after the completion of
the project.
i�
tiJ
4. COST AND ADJUSTMENT
The COUNTY and the DISTRICT shall share in the total cost of the project,
including engineering, surveys, inspection, contract administration and
appropriate overhead, but excluding utility relocation costs. Each agency's
share of the contract costs shall be based on the split of contract items
and quantities shown in Table-A, attached hereto and incorporated herein by
this reference. Each agency's share of engineering, administrative and
incidental costs shall be based on the same percentage as its final contract
cost share. Final cost distribution will be made on completion of the
project. There shall be strict accountability of all funds and a report of
all receipts and disbursements.
5. UTILITY RELOCATION
COUNTY shall arrange for the relocation of all conflicting utilities
within the project limits. DISTRICT shall pay only those relocation costs
associated with utility relocation outside the road right-of-way.
6. CHANGE ORDERS
Each change order shall specify the apportionment of the cost of
additional work between the COUNTY and the DISTRICT and shall be approved by
the COUNTY and the DISTRICT.
7. LIQUIDATED DAMAGES
~ Any liquidated damages collected by the COUNTY will be credited to the
COUNTY and the DISTRICT in proportion to the construction costs contributed
by each agency.
8. MAINTENANCE
The portion of the storm drain lying outside the road right-of-way will
be maintained by the COUNTY in accordance with the provisions of the County
Drainage Maintenance Policy. The storm drain lying within the road right-
of-way will be maintained by the COUNTY as road maintenance.
2
Y
9. MISCELLANEOUS
The parties may modify this Agreement at any time by mutual consent.
Neither party shall arbitrarily withhold its consent to the implementation
and accomplishment of the overall purpose for which this Agreement is drawn.
10. TERM .
Except for the provisions of Paragraph 8, this Agreement shall expire
upon acceptance of the construction as completed by the Board of Supervisors
and the payment of all sums required herein by the parties from one to the
other.
11. SURPLUS MONEY
After the completion of the purpose of this Agreement, any surplus
money on hand shall be returned to the parties in proportion to their
contributions.
COUNTY OF CONTRA COSTA CONTRA COSTA COUNTY FLOOD CONTROL
AND WATER CONSERVATION DISTRICT,
A Political Subdivision of the State
By
� of California ;
Nancy Fand n, Chairwoman
Board of Supervisors By =--
Chairwoman, BoXrd of Supervisors,
ATTEST: as the Governing Body of the
Contra Costa County Flood Control
Phil Batchelor, Clerk of the Board and Water Conservation District
and County Administrator
By
DepAy
RECOMMENDED FOR APPROVAL:
J. Michael Walford, Pub orks Di ector
F M APP ED.
Victor J. Westman, County Counsel
David F. Schmidt, Deputy County Counsel
JEP.DA40A.t4
3
a 1
TABLE A
COST BREAKDOWN
County (HUD) Drainage Area 40A Total
Items of Work Quantity Cost Quantity Cost Cos
1. Trench Shoring & Protection 85% $ 4,250.00 15% $ 750.00 $ 5,000.00
2. Signing & Traffic Control 75% 2,250.00 25% 750.00 3,000.00
3. Clearing & Grubbing 33% 1,000.00 67% 2,000.00 3,000.00
4. 5 Ft. AC Swale 180 LF 1,800.00 --- --- 1,800.00
5. AC Dike 410 LF 2,050.00 --- --- 2,050.00
6. Minor Structure-Type C Inlet 11 EA 16,500.00 --- --- 16,500.00
7. Minor Structure-Type C Inlet
w/Type II MH Base 3 EA 9,000.00 2 EA 6,000.00 15,000.00
8. Minor Structure-Type I MH Base 1 EA 2,500.00 --- --- 2,500.00
9. Minor Structure-Type II MH Base
w/Top Slab 1 EA 2,800.00 --- --- 2,800.00
10. Minor Structure-Modified
Type III MH Base --- --- 2 EA 11,000.00 11,000.00
11. Timber Retaining Wall 4 EA 3,000.00 --- --- 3,000.00
12. 15" Reinforced Concrete Pipe
(Class III) 123 LF 3,690.00 --- --- 3,690.00
13. 15" Reinforced Concrete Pipe
(Class IV) 1627 LF 65,080.00 --- --- 65,080.00
14. 30" Reinforced Concrete Pipe
(Class III) --- --- 215 LF 9,675.00 9,675.00
15. 36" Reinforced Concrete Pipe
(Class III) --- --- 443 LF 22,150.00 22,150.00
16. 12" Corrugated Steel Pipe
(0.079" Thick) 69 LF 1,380.00 --- --- 1,380.00
17. Chain Link Fence (Type CL-4) --- --- 100 LF 1,000.00 1,000.00
18. Contingent Sum
(Paid as Earned) 42% 2,500.00 58% 3,500.00 6,000.00
SUBTOTAL $117,800.00 $56,825.00 $174,625.00
Percentage Breakdown 67.46% 32.54% 100%
Design Engineering 22,965.69 11,078.31 34,044.00
Construction Engineering 14,724.92 7,103.08 21,828.00
Right-of-Way 7,000.00 40,000.00 47,000.00
Utilities --- --- ---
Contingency 13,252.29 6,392.71 19,645.00
TOTAL COST $175,742.90 $121,399.10 $297,142.00