Loading...
HomeMy WebLinkAboutMINUTES - 03051985 - 1.12 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA March 5, 1985 Adopted this Order on , by the following vote: AYES: Supervisors Powers , Schroder, McPeak, Torlakson and Fanden NOES: None ABSENT: None ABSTAIN: None SUBJECT: Sanitation District No. 19 (Discovery Bay) Change Order No. 5 to Construction Contract with Alan- A. Bradford Company (7393-6X5263) On October 25, 1983, the Board of Supervisors, as Ex Officio Governing Board of Contra Costa County Sanitation District No. 19, awarded a contract to Alan A. Bradford Company, for the Construction of Standby Engine at Water Well No. 2. Change Order No. 5 is described as follows: EXTRA WORK AT AGREED PRICE: 1. Pull, dissemble, repair, and replace pump as necessary; modify well head shaft; assemble pump; replace pump; and reconnect to water system. 2. Furnish and install control valve in right angle drive cooling water supply line. 3. Delete modification to site drain. 4. Delete sidewalk repair at pump station D. 5. Delete replacement of A.C. paving over underground diesel tank. 6. Delete insulation on exhaust piping. 7. Delete fire extinguisher. 8. Site work resulting from flooding of excavation at relocation of 10-inch gate valve by open valve. Extend the contract by 49 calendar days. The Public Works Director, as Ex Officio District Engineer, recommends that the Board approve Change Order No. 5, and authorize the Public Works Director, to execute said Change Orders and increase the project cost by $15,093. IT IS BY THE BOARD ORDERED that the recommendation of the Public Works Director is APPROVED. I hereby certify that this to a'rue and correct copy of an actions takers and entered on the minutea of the Board of Supe-.v:sora on the da:o shown. ATTES TED: MAR 5 1985 PHIL BATCHELOR. Clerk of the Board of (Supervisors and County Admin!strator By ` • Deputy Orig. Dept.: Public Works - EC (EJS:cl) sdl9.bo.co5.t3 cc: County Administrator Auditor-Controller Public Works-Accounting