HomeMy WebLinkAboutMINUTES - 03261985 - 1.3 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Oreer on March 26, 1985 by the following vote:
AYES: Supervisors Powers , Schroder, McPeak, Torlakson Fanden
NOES: None
ABSENT: None
ABSTAIN: None
SUBJECT: Resolution No. 85/144
In the Matter of Cooperative )
Agreement with the State of )
California, Dept. of Transportation)
Agmt.#4-0815-C, and the Extension )
of Vine Hill Road Westerly from )
Pacheco Boulevard by the City of )
Martinez )
The Board of Supervisors approved Resolution 81/829 on July 28, 1981, which
approved the construction, inspection and acceptance of a portion of Vine Hill
Road westerly from Pacheco Blvd, which is being built as a State administered
project, financed by the City of Martinez, and constructed in the unincorporated
area of Pacheco.
Upon request of the City of Martinez, the westerly extension of the work
covered under the cooperative will be constructed concurrently by a land developer
in and under the control of the City of Martinez, who has requested that the County
accept for maintenance that additional portion, approximately 150 linear feet,
in the unincorporated area upon completion of the work.
It is recommended by the Public Works Director that the County accept by
separate action the additional 150 linear feet, more or less, to be constructed
by developers Security Owners Corporation of Martinez, subdividing in the City of
Martinez, upon completion of the construction provided that:
1. The County has an opportunity to review the plans prepared by the
developer, and participate in the final inspection, and
2. The developer pay for and obtains an encroachment permit from Contra
Costa County for all the work within the right of way of Vine Hill Road
(3975AH), and
3. The construction work in inspected and certified complete by the City
of Martinez, and
4. The contiguous portions of the roadway between Pacheco Boulevard and
Glacier Drive are completed and accepted by the City of Martinez, and
5. That a suitable right of way and pipeline easements are provided by
the developer, and by the State through relinquishment upon completion
of the work.
IT IS BY WHE BOARD RESOLVED that the recommendation of the Public Works
Director is APPROVED.
I hereby certify tha-tthis Is a true and correct copy of
an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
LD 3 ATTESTED: MAR 2 6 IN;
Public Works PHIL BATCHELOR, Clerk of the Board
Transportation Planning of Supervisors and County Administrator
By , Depow
RESOLUTION NO. 85/144