Loading...
HomeMy WebLinkAboutMINUTES - 07171984 - X.1 ( File: 225-8401 (F)/B.4. THE BOARD OF SUPERVISORS CONTRA COSTA COUNTY, CALIFORNIA AS EX OFFICIO THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FIRE PROTECTION DISTRICT Adopted this Order on July 17, 1984, by the following vote: AYES: Supervisors Fanden, Schroder, Torlakson NOES: None ABSENT: Supervisor McPeak ABSTAIN: Supervisor Powers SUBJECT: Award of Contract for Reroofing at Fire Station No. 10, Concord Area Project No. 7100-4819; 0928-WH819B Bidder Total Amount Bond Amounts Mastercraft Tile & Roofing $17,920.00 Base Bid Labor & Mats. $ :8,960.00 Co. Inc. Faith. Perf. $17,920.00 #1 20th Street Richmond, CA 94802 Caldwell Roofing Co. , Inc. Pittsburg, CA Sparks Roofing Co. Inc. Concord, CA Enterprise Roofing Service, Inc. Concord, CA Roofing Constructors, Inc. DBA Western Roofing Service San Francisco, CA The above-captioned project and the specifications therefor being approved, bids being duly invited .and received by the Public Works Director; and The Public Works Director recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; The Board of Supervisors, as the Governing Body of the Contra Costa County Fire Protection District, ORDERS that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the unit price submitted in said bid; and that said contractor shall present two good and sufficient surety bands as indicated above; and that the Public Works Department shall prepare the contract therefor; and IT IS FURTHER ORDERED that after the contractor has signed the contract and returned it, together with bonds as noted above and any required certificates of insurance or other required documents, and the Public Works Director has reviewed and found them to be sufficient, the Public Works Director is authorized to sign the contract for this Board; and IT IS FURTHER ORDERED that in accordance with the project specifications and/or upon signature of the contract by the Public Works Director, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall 6'e returned. i Mnsby certMtr ffiat thfs fe a hue snd corroet copy of Ori g. Dept. : Publ i.c Works Dept. - Architectural Divan action taken and entered on the mtnutes of the cc: Publ i c Works Department roard of Supervfa=on the date shown. Architectural Division ATTESTED: /:Z 15 P. W. Accounting Auditor-Controller J.A. OLS-101,14, COUNTY CLERK Contractor (via A.D. ) and ox off klo Clerk o!the Board Fire Protection District (via A.D.) 00 �' .