Loading...
HomeMy WebLinkAboutMINUTES - 06051984 - 1.1 (2) WHEN RECORDED, RETURN RECORDED AT REQUEST OF OWNER TO CLERK BOARD OF at o'clock M. SUPERVISORS Contra Costa County Records J. R. OLSSON, .County Recorder Fee $ -Official BOARD OF SUPERVISORS, CONTRA COSTA COUNTY, CALIFORNIA In the Matter of Accepting and Giving ) RESOLUTION OF ACCEPTANCE Notice of Completion of Contract for ) and NOTICE OF COMPLETION Alhambra Creek Bank Repair near Sonora ) (C.C. SS 3086, 3093) Ct., Project No. 7505-6F775O-83, ) Martinez Area ) RESOLUTION NO. 84/ 319 The Board of Supervisors of Contra Costa County, sitting in its capacity as the governing body of the Contra Costa County Flood Control and Water Conservation District, RESOLVES THAT: The Flood Control District on August 23, 1983, contracted with Precision Seeding, 3181 Auburn-Folsom Road, Newcastle, California, 95658, for the installation of steel sheet piling and gabion walls and placement of rock slope protection on Alhambra Creek at Sonora Court in the City of Martinez, with Cal-Farm Insurance Company as surety, for work to be performed; and The Chief Engineer, having reported that the Contractor had failed to satis- factorily complete the work as required by said contract, was authorized by the Board on March 13, 1984 to arrange for completion of improvements; and The surety, Cal-Farm Insurance Company, arranged the completion of said improvements; and The Chief Engineer reports that said work has been inspected and complies with the approved plans, special provisions , and standard specifications, and recommends its acceptance as complete as of May 15, 1984; Therefore, said work is accepted as completed on said date, and the Clerk' shall file with the County Recorder a copy of this Resolution and Notice as a Notice of Completion for said contract. PASSED BY THE BOARD on June 5, 1984 by the following vote: AYES: Supervisors Powers , Fanden, Schroder, McPeak, Torlakson NOES: None ABSENT: None CERTIFICATION AND VERIFICATION I certify that the foregoing is a true and correct copy of a resolution and acceptance duly adopted and entered on the minutes of this Board's meeting on the above date. I declare under penalty of perjury that the foregoing is true and correct. Dated: June 5 , 1984 J. R. OLSSON, County Clerk and at Martinez, California ex officio Clerk of the Board Deputy ClerK Originator: Public Works Department Design and Construction Division cc: Record and return Contractor .(via Pew) County Auditor-Controller . Public Works Accounting Division RESOLUTION NO. 84/ 319 DC:DC.ALHSONORABO.TS 00 0.13