HomeMy WebLinkAboutMINUTES - 03271984 - 1.6 THE BOARD OF SUPERVISORS
CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on March 27, 1984 by the following vote:
AYES: Supervisors Powers, Fanden, Schroder, McPeak, Torlakson
NOES: None
ABSENT: None
SUBJECT: Right of Way Acquisition
I 680 Bollinger Canyon Road Interchange
Project No. 0662-6U4199
San Ramon Area
IT IS BY THE BOARD ORDERED that the following Grant Deeds are ACCEPTED:
Grantor Document
Granada Sales, Incorporated Grant Deed
Chevron USA, Inc. Grant Deed
Pacific Telesis Group Grant Deed
Said property is dedicated to the County in connection with the I 680 Bollinger
Canyon Road Interchange project.
The Real Property Division is DIRECTED to have said Grant Deeds recorded
in the Office of the County Recorder.
�herablr eQrlHp that thlsN•��Q�teopird
M�altep Wcen and sn%md on tM mtnoft of the
Board of&gxRV1Wm on pie data shown.
ATTESTED:
:� �-7, l985�
J.R. OLSSON,COUNTY CLEtAIC
and ex ofNcto Clerk of the 6"rd
d/i, 4 E 0 Oewb
By --
Orig. Dept.: Public Works (RP)
cc, Public Works Accounting
BOBOLLINGER2O.T3
000009
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on March 27, 1984 by the following vote:
AYES: Supervisors Powers, Fanden, Schroder, McPeak, Torlakson
NOES: None
ABSENT: None
ABSTAIN: None
SUBJECT:
Approval of Cooperation Agreement )
No. 4-0893-C .and Escrow Agreement )
No. 4-0894-E, Construction of the
Interchange of I-680 and Bollinger
Canyon Road, San Ramon )
The Public Works Director, having advised the Board that the construction
of the I-680/Bollinger Canyon Road interchange is made necessary by major
land development occurring in the area, is scheduled for construction
in 1984-85, and that the State and County intend to enter into a cooperative
agreement and a separate agreement to provide for project development
and construction, and funding.
The project is estimated to cost $5,460,000 with the State paying
for 50% of the construction cost and all engineering and administrative
costs, not to exceed $2,860,000 without additional authorization. The
local share is estimated to be $2,600,000, which funds will be provided
entirely by the local development community in San Ramon. Payment of
the local share by developers is being handled by separate agreement
between developers and County.
The Public Works Director recommends that the Cooperative District
Agreement No. 4-0893-C and Escrow District Agreement No. 4-0894-E be
approved and that the Chair of the Board be authorized to execute the
agreements in behalf of Contra Costa County.
IT IS BY THE BOARD ORDERED that the recommendation of the Public
Works Director is approved.
1 hereby owft that this Is a true andeornclOW01
an action taken and entered on the minutes Of 1M
Board of Supervisors on the date 9110vft
ATTESTED: A �?, ' 9 ?
J.R. OLSSON, COJMTY CLERK
tp.bo. i689bol l .t3 (3.20.84) and ex officlo Clerk of the Board
ORIG. DEPT. : Public Works
Transportation Planning By �Deputy
cc: Public Works Director
Public Works Accounting
County Administrator
Auditor-Controller
State of California (Caltrans)(via TP)