HomeMy WebLinkAboutRESOLUTIONS - 01012005 - 2005-411 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY,CALIFORNIA
Adopted this Resolution on June 28, 2005by the following vote:
AYES: SUPERVISORS GIOIA, PIEPHO, DESAULNIER, GLOVER AND UILKEMA
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
teol �txQla Nc�. M.411
SUBJECT: ADOPT Resolution No. 2005/411 accepting the Preliminary Engineer's'Report for Countywide
Landscape District AD 1979-3 (LL-2)Fiscal Year 2005/2006,declaring the intent to levy and collect
assessments,and fixing a public hearing for July 19,2005 at 9:30 a.m.to adopt the proposed annual
assessments, Countywide, (All Districts) Project No. 4500-6X5244
The.Board of Supervisors of Contra Costa County FINDS THAT:
1. The Board of Supervisors declares its intention to levy and collect assessments in existing zones within the
Countywide Landscape District(LL-2),Contra Costa County,California,for the fiscal year beginning July 1,
2005 and ending June 30, 2006.
2. The improvements to be maintained through Countywide Landscape District(LL-2),Contra Costa County,
California, consists of the installation, maintenance and servicing of landscaping, irrigation, park and
recreational related facilities with all appurtenances,and services of consultants as needed. A detailed
description of the improvements that are being operated,maintained and serviced throughout each zone in
the District are listed below:
Zones 1,2 and 4"`(Lynbrook Development,Bay Point)- Subdivisions 5354, 5380, 5533, 5534, 5595, 5695,6622
and MS 11-84.Maintain and service landscaping,irrigation and related improvements along Port Chicago Highway,
Kevin Drive,Lynbrook Street,Willow Pass Road,and the Lynbrook public park within the Lynbrook Development.
Zone 3 (Hickory.Meadows, Bay Point) - Subdivision 5573
Maintain Play Lot(0.32 acres within Hickory Meadows Development-Subdivision 5573)includes all landscaping,
irrigation, ground cover and related improvements.
Zone 5 (Pacheco Beautification Project) 900 parcels
Maintain landscaping, irrigation and related improvements within Pacheco Boulevard Islands and Aspen Drive
Creekside Park.
I hereby certify that this is a true and correct copy of an
action taken and entered on the minutes of the Board of
G:\GrpData\SpDist\Board Orders\2005-Board Ordersl Supervisors on the date shown.
Annual RenewalslLL2\Boar•d Packet\06-2$-05 BO-Preliminary LL-2.doc
Originator:Public Works(Special Districts)
Contact: Eileen Doten,(925)313-2253 ATTESTED: .JUNE 28, 2005
cc: County Administrator's Office
Auditor-Controller JOHN SWEETEN,Clerk of the Board of Supervisors
County Counsel and County Administrator
County Assessor
D.Morabe,Sp.Dist.
Francisco&Associates ^�
By .,1Rr ,Deputy
RESOLUTION NO. 2005/411
SUBJECT: ADOPT Resolution No. 2005/411acceptng the Preliminary Engineer's Report for Countywide
Landscape District AD 1979-3 (LL-2)Fiscal Year 2005/2006,declaring the intent to levy and collect
assessments,and fixing a public hearing for July 19,2005 at 9:30 a.m..to adopt the proposed annual
assessments, Countywide. (All Districts) Project No. 4500-6X5244
DATE: June 28, 2005
PAGE: 2
Zone 7(Pleasant Hill/BART) -'Redevelopment Project
Maintain all landscaping features installed as a part of the Redevelopment Project,including Fox Creek Park.
Zone 10(Viewpoint, Bay Point) - Subdivision 6484
Maintain landscaping,irrigation,ground cover,paved walking trail and related improvements within"slope,scenic
and trail easement" and Viewpoint Park.
Zone 11 (Hilltop Commons, San Pablo Area) LUP 2042-85
Maintain median island landscapingand irrigation facilities along San Pablo Avenue between Atlas Road and
Shamrock Drive and the frontage landscaping along the south side of San Pablo Avenue.
Zone 17 (Shadow Creek - Camino Tassajara) - Subdivision 7040,7041 and 7279
Maintain and service landscaping and irrigation system along frontage area and median islands on Camino Tassajara
and entrance areas at Shadow Creek Drive and Knollview Drive.
Zone 18 (Pacheco Manor) - Subdivision 6958
Maintain and service landscaping,irrigation and related improvements along Pacheco Boulevard and Temple Drive.
Zone 19 (Hidden Pond, Martinez Area) - Subdivision 6769, 7820, 7821; 7144, and 7151
Maintain and service landscaping,irrigation and related improvements along Hidden Pond Road and Reliez Valley
Road.
Zone 21 (Kensington Area)
Maintain, service and install as required median landscaping along Arlington Avenue,the Colusa Traffic Circle,
(other'landscaped'areas as required in future). This zone includes residential and commercial assessments.
Zone 22 (Seabreeze, Bay Point) - Subdivision 7152
Maintain and service landscaping and irrigation system along Evora Road and along the perimeter of the
subdivision. Parcel A and the fencing around Parcel A will be maintained.
Zone 27(Bettencourt Ranch and Sommerset,Camino Tassajara)-Subdivisions 7188,7277,7278,7279,7280,and
7763 Maintain landscaping, irrigation and miscellaneous facilities along the Camino Tassajara frontage of
Bettencourt Ranch and Sommerset Subdivisions.
Zone 35 (Byron Seventy-Eight, Byron Area)MS 39-91,DP 3031-91 and Subdivision 8456
Maintain landscape improvements constructed at the time the parcels are developed. Future improvements will
include landscaping,irrigation and miscellaneous facilities within the public right of way including medians along
Highway 4 and Bixler Road.
RESOLUTION NO. 2005/ 411
SUBJECT: ADOPT Resolution No. 2005/41'1accepting the Preliminary Engineer's Report for Countywide
Landscape District AD 1979-3(LL-2)Fiscal Year 2005/2006,declaring the intent to levy and collect
assessments,and fixing a public hearing for 3uly19,2005 at 9:30 a.m.to adopt the proposed annual
assessments, Countywide. (All Districts)Project No. 4500-6:X5244
DATE: June 28, 2005
PAGE: 3
Zone 36 (Alamo Area)
Maintain frontage landscape throughout the Alamo area.
Zone 37 (Clyde Area)
Maintain park and recreational facilities in Clyde. Parks included are.'Clyde,Marie Porter,Big Oak and Maybeck
Nature. This zone includes residential and commercial assessments.
Zone 38 (Rodeo Area)
Maintain landscaping,trails and recreational facilities along Rodeo Creek Trail Corridor,Rodeo Signboard area,and
improvements to the ten-.acre Lefty Gomez Ballfield Complex in Rodeo.
Zone 42 (California Skyline, Bay Point) - Subdivisions 7597, 7737 and 7838
Maintain landscape improvements within the public right of way, along both sides of Driftwood Drive, plus
medians,frontage along the north side of Evora Road and 1/4 acre mini park on Tradewinds and Coastview Courts.
Zone 45 (Alamo Villas, Alamo Area) - Subdivision 7559
Maintain landscaping and irrigation within the public right of way fronting approximately 120 linear feet along
Subdivision 7559:
Zone 48 (Mrack Road, Camino Tassaj;ara) Subdivision 7613, 7621, 7776, 7777,7778, 7779, 7780 and 8104
Maintain landscaping and irrigation within the public right of way along 725 linear feet of Camino Tassajara
fronting Subdivision 7621.
Zone 54 (Alamo Area) Subdivisions 7601 and 7818
Maintain landscaping within the public right of way of Livorna Road and Miranda Avenue, fronting Subdivisions
7601 and 7818, totaling approximately 4,320 linear feet. Landscaping varies in width from 23 feet to 170 feet.
Zone 57(Byron Area) Subdivisions 7679, 7881, 7907, 7908 and 7909
Maintain landscaping within the public right ofway along Highway 4 and Bixler Road,fronting Subdivisions 7679
and 7881,totaling approximately 3,680 linear feet,Pothole Drive median totaling approximately 320 linear feet,and
landscaping of a 3.2-acre park(Tyler Park).
Zone 61 (Discovery Bay West) Subdivision 7686
Maintain landscape improvements that will be constructed at the time the parcels are developed. Future
improvements will include maintenance and administration of landscaping irrigation and related facilities along the
public right of way of Bixler Road Village I 11,III and IV, Newport Drive,Park and Ride Lot and Point of Timber
Road as well as the Village I Park.
Zone 63 (Parkway'Estates, North Richmond Area) - Subdivision 7903
Maintain landscaping improvements located in the Parkway Estates park.
RESOLUTION NO. 2005/ 411
SUBJECT: ADOPT Resolution No. 2005/411 accepting the Preliminary Engineer's Report for Countywide
Landscape District AD 1979-3 (LL-2)Fiscal Year 2005/2406,declaring the intent to levy and collect
assessments,and fixing a public hearing for July 19,2005 at 9:30 a. .to adopt the proposed annual
assessments, Countywide. (All Districts)Project No. 4500-6X5244
DATE: June 28, 2005
PAGE: 4
Zone 64 (California Reflections, Pinole Area)- Subdivision 7661
Maintain landscape improvements located within the public right of way fronting San Pablo Avenue/Eire Drive.
Zone 68 (Wendt Ranch,Danville Area)—Subdivision 8002
Landscape improvements are located within the public right-of-way of medians along Camino Tassajara and
Knollview Drive and frontage landscaping on Camino Tassajara.
The Public Works Director has filed with the Clerk ofthe Board'the Preliminary Engineer's Report required by the
Landscape and Lighting Act of 1972. This report contains a full and detailed description of the improvements,the
boundaries of the assessment district and the proposed assessments upon assessable lots and parcels of land within
the assessment district.
3. Based upon its review of the Preliminary Engineers Report, the Board finds that:
(a) The special benefit financed by the assessments will directly:benefit the parcels within each of the
zones.
(b) The cost of the existing assessments within each zone is proportional to the benefits that the special
benefit will confer on each parcel:
(c) The cost of the proposed increased assessments within each zone is proportional to the benefits that
the specialbenefit will confer on each parcel.
Now, therefore the Board of Supervisors ORDERS and RESOLVES as follows:
1. The Board approves the Preliminary Engineer's Report and opens the Report to public inspection at
both the Clerk of the Board and Public Works offices.
2. The Board will conduct a public hearing(the"Hearing")on July 19,2005 at 9:30 a.m.in Room 107 of
the Board of Supervisors' Chambers, 651 Pine Street, Martinez,California 94553.
3. At the Hearing,the Board shall consider any objections or protests to the Assessment. Board shall not
impose the Assessment if there is a majority protest. A majority protest'exists if, after the close of the
Public Hearing,ifowners of more than 50%of the assessable land have protests on file at the end of the
hearing.
4. At the Hearing, if there is no Majority Protest, the Board may adopt a resolution which: confirms the
Engineer's Report;levies the assessment in the Engineer's Report;finds that the Director of the Contra
Costa County Public Works Department, acting as the designated director, has concluded that the
Engineer's Report conforms to the official assessment roll for the year in which the assessment will be
collected and,therefore,constitutes the Final Report for the Assessment;confirms the Final Report;and
levies the Assessment for the Fiscal year referred to in the Engineer's Report.
RESOLUTION NO. 2005/ 411