Loading...
HomeMy WebLinkAboutRESOLUTIONS - 01012005 - 2005-411 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY,CALIFORNIA Adopted this Resolution on June 28, 2005by the following vote: AYES: SUPERVISORS GIOIA, PIEPHO, DESAULNIER, GLOVER AND UILKEMA NOES: NONE ABSENT: NONE ABSTAIN: NONE teol �txQla Nc�. M.411 SUBJECT: ADOPT Resolution No. 2005/411 accepting the Preliminary Engineer's'Report for Countywide Landscape District AD 1979-3 (LL-2)Fiscal Year 2005/2006,declaring the intent to levy and collect assessments,and fixing a public hearing for July 19,2005 at 9:30 a.m.to adopt the proposed annual assessments, Countywide, (All Districts) Project No. 4500-6X5244 The.Board of Supervisors of Contra Costa County FINDS THAT: 1. The Board of Supervisors declares its intention to levy and collect assessments in existing zones within the Countywide Landscape District(LL-2),Contra Costa County,California,for the fiscal year beginning July 1, 2005 and ending June 30, 2006. 2. The improvements to be maintained through Countywide Landscape District(LL-2),Contra Costa County, California, consists of the installation, maintenance and servicing of landscaping, irrigation, park and recreational related facilities with all appurtenances,and services of consultants as needed. A detailed description of the improvements that are being operated,maintained and serviced throughout each zone in the District are listed below: Zones 1,2 and 4"`(Lynbrook Development,Bay Point)- Subdivisions 5354, 5380, 5533, 5534, 5595, 5695,6622 and MS 11-84.Maintain and service landscaping,irrigation and related improvements along Port Chicago Highway, Kevin Drive,Lynbrook Street,Willow Pass Road,and the Lynbrook public park within the Lynbrook Development. Zone 3 (Hickory.Meadows, Bay Point) - Subdivision 5573 Maintain Play Lot(0.32 acres within Hickory Meadows Development-Subdivision 5573)includes all landscaping, irrigation, ground cover and related improvements. Zone 5 (Pacheco Beautification Project) 900 parcels Maintain landscaping, irrigation and related improvements within Pacheco Boulevard Islands and Aspen Drive Creekside Park. I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of G:\GrpData\SpDist\Board Orders\2005-Board Ordersl Supervisors on the date shown. Annual RenewalslLL2\Boar•d Packet\06-2$-05 BO-Preliminary LL-2.doc Originator:Public Works(Special Districts) Contact: Eileen Doten,(925)313-2253 ATTESTED: .JUNE 28, 2005 cc: County Administrator's Office Auditor-Controller JOHN SWEETEN,Clerk of the Board of Supervisors County Counsel and County Administrator County Assessor D.Morabe,Sp.Dist. Francisco&Associates ^� By .,1Rr ,Deputy RESOLUTION NO. 2005/411 SUBJECT: ADOPT Resolution No. 2005/411acceptng the Preliminary Engineer's Report for Countywide Landscape District AD 1979-3 (LL-2)Fiscal Year 2005/2006,declaring the intent to levy and collect assessments,and fixing a public hearing for July 19,2005 at 9:30 a.m..to adopt the proposed annual assessments, Countywide. (All Districts) Project No. 4500-6X5244 DATE: June 28, 2005 PAGE: 2 Zone 7(Pleasant Hill/BART) -'Redevelopment Project Maintain all landscaping features installed as a part of the Redevelopment Project,including Fox Creek Park. Zone 10(Viewpoint, Bay Point) - Subdivision 6484 Maintain landscaping,irrigation,ground cover,paved walking trail and related improvements within"slope,scenic and trail easement" and Viewpoint Park. Zone 11 (Hilltop Commons, San Pablo Area) LUP 2042-85 Maintain median island landscapingand irrigation facilities along San Pablo Avenue between Atlas Road and Shamrock Drive and the frontage landscaping along the south side of San Pablo Avenue. Zone 17 (Shadow Creek - Camino Tassajara) - Subdivision 7040,7041 and 7279 Maintain and service landscaping and irrigation system along frontage area and median islands on Camino Tassajara and entrance areas at Shadow Creek Drive and Knollview Drive. Zone 18 (Pacheco Manor) - Subdivision 6958 Maintain and service landscaping,irrigation and related improvements along Pacheco Boulevard and Temple Drive. Zone 19 (Hidden Pond, Martinez Area) - Subdivision 6769, 7820, 7821; 7144, and 7151 Maintain and service landscaping,irrigation and related improvements along Hidden Pond Road and Reliez Valley Road. Zone 21 (Kensington Area) Maintain, service and install as required median landscaping along Arlington Avenue,the Colusa Traffic Circle, (other'landscaped'areas as required in future). This zone includes residential and commercial assessments. Zone 22 (Seabreeze, Bay Point) - Subdivision 7152 Maintain and service landscaping and irrigation system along Evora Road and along the perimeter of the subdivision. Parcel A and the fencing around Parcel A will be maintained. Zone 27(Bettencourt Ranch and Sommerset,Camino Tassajara)-Subdivisions 7188,7277,7278,7279,7280,and 7763 Maintain landscaping, irrigation and miscellaneous facilities along the Camino Tassajara frontage of Bettencourt Ranch and Sommerset Subdivisions. Zone 35 (Byron Seventy-Eight, Byron Area)MS 39-91,DP 3031-91 and Subdivision 8456 Maintain landscape improvements constructed at the time the parcels are developed. Future improvements will include landscaping,irrigation and miscellaneous facilities within the public right of way including medians along Highway 4 and Bixler Road. RESOLUTION NO. 2005/ 411 SUBJECT: ADOPT Resolution No. 2005/41'1accepting the Preliminary Engineer's Report for Countywide Landscape District AD 1979-3(LL-2)Fiscal Year 2005/2006,declaring the intent to levy and collect assessments,and fixing a public hearing for 3uly19,2005 at 9:30 a.m.to adopt the proposed annual assessments, Countywide. (All Districts)Project No. 4500-6:X5244 DATE: June 28, 2005 PAGE: 3 Zone 36 (Alamo Area) Maintain frontage landscape throughout the Alamo area. Zone 37 (Clyde Area) Maintain park and recreational facilities in Clyde. Parks included are.'Clyde,Marie Porter,Big Oak and Maybeck Nature. This zone includes residential and commercial assessments. Zone 38 (Rodeo Area) Maintain landscaping,trails and recreational facilities along Rodeo Creek Trail Corridor,Rodeo Signboard area,and improvements to the ten-.acre Lefty Gomez Ballfield Complex in Rodeo. Zone 42 (California Skyline, Bay Point) - Subdivisions 7597, 7737 and 7838 Maintain landscape improvements within the public right of way, along both sides of Driftwood Drive, plus medians,frontage along the north side of Evora Road and 1/4 acre mini park on Tradewinds and Coastview Courts. Zone 45 (Alamo Villas, Alamo Area) - Subdivision 7559 Maintain landscaping and irrigation within the public right of way fronting approximately 120 linear feet along Subdivision 7559: Zone 48 (Mrack Road, Camino Tassaj;ara) Subdivision 7613, 7621, 7776, 7777,7778, 7779, 7780 and 8104 Maintain landscaping and irrigation within the public right of way along 725 linear feet of Camino Tassajara fronting Subdivision 7621. Zone 54 (Alamo Area) Subdivisions 7601 and 7818 Maintain landscaping within the public right of way of Livorna Road and Miranda Avenue, fronting Subdivisions 7601 and 7818, totaling approximately 4,320 linear feet. Landscaping varies in width from 23 feet to 170 feet. Zone 57(Byron Area) Subdivisions 7679, 7881, 7907, 7908 and 7909 Maintain landscaping within the public right ofway along Highway 4 and Bixler Road,fronting Subdivisions 7679 and 7881,totaling approximately 3,680 linear feet,Pothole Drive median totaling approximately 320 linear feet,and landscaping of a 3.2-acre park(Tyler Park). Zone 61 (Discovery Bay West) Subdivision 7686 Maintain landscape improvements that will be constructed at the time the parcels are developed. Future improvements will include maintenance and administration of landscaping irrigation and related facilities along the public right of way of Bixler Road Village I 11,III and IV, Newport Drive,Park and Ride Lot and Point of Timber Road as well as the Village I Park. Zone 63 (Parkway'Estates, North Richmond Area) - Subdivision 7903 Maintain landscaping improvements located in the Parkway Estates park. RESOLUTION NO. 2005/ 411 SUBJECT: ADOPT Resolution No. 2005/411 accepting the Preliminary Engineer's Report for Countywide Landscape District AD 1979-3 (LL-2)Fiscal Year 2005/2406,declaring the intent to levy and collect assessments,and fixing a public hearing for July 19,2005 at 9:30 a. .to adopt the proposed annual assessments, Countywide. (All Districts)Project No. 4500-6X5244 DATE: June 28, 2005 PAGE: 4 Zone 64 (California Reflections, Pinole Area)- Subdivision 7661 Maintain landscape improvements located within the public right of way fronting San Pablo Avenue/Eire Drive. Zone 68 (Wendt Ranch,Danville Area)—Subdivision 8002 Landscape improvements are located within the public right-of-way of medians along Camino Tassajara and Knollview Drive and frontage landscaping on Camino Tassajara. The Public Works Director has filed with the Clerk ofthe Board'the Preliminary Engineer's Report required by the Landscape and Lighting Act of 1972. This report contains a full and detailed description of the improvements,the boundaries of the assessment district and the proposed assessments upon assessable lots and parcels of land within the assessment district. 3. Based upon its review of the Preliminary Engineers Report, the Board finds that: (a) The special benefit financed by the assessments will directly:benefit the parcels within each of the zones. (b) The cost of the existing assessments within each zone is proportional to the benefits that the special benefit will confer on each parcel: (c) The cost of the proposed increased assessments within each zone is proportional to the benefits that the specialbenefit will confer on each parcel. Now, therefore the Board of Supervisors ORDERS and RESOLVES as follows: 1. The Board approves the Preliminary Engineer's Report and opens the Report to public inspection at both the Clerk of the Board and Public Works offices. 2. The Board will conduct a public hearing(the"Hearing")on July 19,2005 at 9:30 a.m.in Room 107 of the Board of Supervisors' Chambers, 651 Pine Street, Martinez,California 94553. 3. At the Hearing,the Board shall consider any objections or protests to the Assessment. Board shall not impose the Assessment if there is a majority protest. A majority protest'exists if, after the close of the Public Hearing,ifowners of more than 50%of the assessable land have protests on file at the end of the hearing. 4. At the Hearing, if there is no Majority Protest, the Board may adopt a resolution which: confirms the Engineer's Report;levies the assessment in the Engineer's Report;finds that the Director of the Contra Costa County Public Works Department, acting as the designated director, has concluded that the Engineer's Report conforms to the official assessment roll for the year in which the assessment will be collected and,therefore,constitutes the Final Report for the Assessment;confirms the Final Report;and levies the Assessment for the Fiscal year referred to in the Engineer's Report. RESOLUTION NO. 2005/ 411