Loading...
HomeMy WebLinkAboutRESOLUTIONS - 01012003 - 2003-374 �i THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Resolution on June 10,2003 by the following vote: AYES: SUPERVISORS GIOIA; UILKEMA, GLOVER AND DESAULNIER NOES: NONE ABSENT: NONE ABSTAIN: NONE DISTRICT III SEAT VACANT RESOLUTION NO.2003/ 374 SUBJECT: Approve and Grant the Authority to the Public Works Director to approve the full closure of a portion of Dougherty Road between the Bollinger Canyon Road loop for a continuous period of four weeks to commence and terminate between June 23, 2003 and August 29,2003,24 hours per day,for the purpose of the constructing the realigned Dougherty Road connection to Bollinger Canyon Road(south),in the San Ramon(Dougherty Valley) area. (District III) RC-03-10 The start of the road closure is not a fixed date because Dougherty Road cannot be closed until the opening of the two easterly lanes of new Bollinger Canyon Road, which will provide a detour route for public traffic during the road closure. The reason Dougherty Road must be closed completely for a period of four weeks is because the design of the new realigned Dougherty Road Connector requires the placement of fill and a keyway. The construction of the fill and keyway prevents use of the road by public traffic until the fill can be completed and the new pavement is installed. RBH MILT/rm I hereby certify that this is a true and correct copy of an action G:\Grp lam svctao\zao3\a-lao3tisc-o3-lo so.doc taken and entered on the minutes of the Board of Supervisors on Originator: Public Works(APC) the date shown. Contact: Bob Hendry(335-1375) cc: CHP ATTESTED. JUNE 10, 2003 Sheriff-PatrollCommander JOHN SWEETEN Clerk othe Boarof Supervisors and Cour CRL7—CurrenttPlanning kfhd up t3' Building Inspection Administrator Windemere BLC Land Company,L.L.C. Brian Olin and Barry Crosby 3130 Crow Canyon Place,#310 San Ramon,CA 94583 By � �� Deputy City of San Ramon Joye Fukuda 5000 Crow Canyon Road San Ramon,CA 94583 RESOLUTION NO.2003/ 3 7 4 SUBJECT: Approve and Grant the Authority to the Public Works Director to approve the full closure of a portion of Dougherty Road between the Bollinger Canyon Road loop for a continuous period of four weeks to commence and terminate between June 23, 2003 and August 29,2003,24 hours per day,for the purpose of the constructing the realigned Dougherty Road connection to Bollinger Canyon Road(south),in the San Ramon(Dougherty Valley)area. (District III) DATE: June 10,2003 PACE: 2 IT IS BY THE BOARD RESOLVED that permission is granted to Lennar Communities (VVindemere BLC Land Company,L.L.C.)to fully close Dougherty Road between Bollinger Canyon Road and the new connection to the ultimate Dougherty Road(see Exhibit A),except for emergency traffic, for a continuous period of four weeks to commence and terminate between June 23,2003 and August 29,2003,24 hours per day, subject to the following conditions: 1. Traffic will be detoured via Bollinger Canyon Road per plan approved by the Public Works Department. 2. All signing to be in accordance with the State of California Manual of Traffic Controls. 3. Lennar Communities shall comply with the requirements of the Ordinance Code of Contra Costa County. 4. Have on file with the County Public Works Department at the Application and Permit Center a Certificate of Insurance in the amount of$1,000,000 for Comprehensive General Public Liability which names the County as an additional insured. 5. Obtain approval for the closure from the Sheriff's Department,the California Highway Patrol and the Fire District. RESOLUTION NO. 2003/374 r, ;tr1C ROAD CLOSED ' ✓ ROAD CLOSED ' a DETOUR ROUTE �,► ROAD CLOSED DOUGHERTY ROAD DETOUR ALONG BOLL INGER CANYON ROAD "11 DOUGHERTY ROAD CLOSURES WRG)BMM CONIM C89TA COuWY, CAPOfM DATE: AM 29, 2003 SCALE 1:20,000 Carlson, Barbee, & Gibson, Inc. CIVIL ENONEERS - SURVEYORS - PLANNERS 2503 CAMINO RAMON, SUITE 100 SAN RAMON, CALIFORNIA 94583 TELEPHONE: (925) 866-0322 FAX: (925) 865-•8575 H:\94462\ACAD\PHo1\EXH87S\PHASING\STAL PLAN\XB-DR-CLOSED.DWG