Loading...
HomeMy WebLinkAboutRESOLUTIONS - 01012003 - 2003-211 N1, , THE BOARD OF S' `ERVISORS OF CONTRA COSTA CC ' ,.TY,CALIFORNIA Adopted this Resolution on April 8,2003 by the following vote: 6 r AYES: SUPERVISORS GIOIA, UILKEMA, GLOVER AND DESAULNIER NOES: Nene ABSENT: Nene ABSTAIN: Nene DISTRICT III SEAT VACANT RESOLUTION NO.2003& SUBJECT: Tabulation of Mail-In Ballots, uonrirmanon of Diagram and Assessment and Levy of Street Light Charges for MSO 10005 County Service Area L-100, Walnut Creek area. (District III) WO 5001, ORG. 7394 The Board of Supervisors of Contra Costa County RESOLVES: 1. On February 11, 2003, the Board of Supervisors adopted Resolution No. 03/96 directing the filing of the engineer's report for street light charges for County Service Area L-100. As directed by the Board, the Engineer of Work has filed the engineer's report. 2. On February 11, 2003, the Board adopted Resolution No. 03/96 declaring the Board's intention to levy and collect street light charges to operate and maintain facilities and services within CSA L-100 for Fiscal Year 2003/04 and setting a public hearing for April 8, 2003. Notice of the hearing was given in the time and manner required by law. 3. Resolution No. 03/96 directed the Engineer of Work(Public Works Director) to cause to be mailed to property owners within MS010005 the notices and ballots required by Section 4 of Article XIII D of the California Constitution(Proposition 218). 4. The notices and ballots have been mailed to property owners and the returned ballots are ready to be tabulated. NOW,THEREFORE,the Board FINDS,DETERMINES and RESOLVES that: 5. A public hearing was held before this Board on April 8, 2003 at 9:30 a.m. At the hearing,the Engineer of Work presented to the Board all ballots received from property owners within MS010005 (a proposed tabulation of those ballots). The Board heard and considered all protests against the proposed assessments and tabulated the returned ballots according to the proportional financial obligation of the affected properties. The Board also afforded to every interested person an opportunity to make a protest to the engineer's report, either in writing or orally, and the Board considered each protest. 6. A majority protest, as defined in section 4(e)of Article XIII D,does not exist. 7. The Board hereby confirms the diagram and assessment as set forth in the report of the Engineer of Work and hereby authorizes the levy of the street light charges set forth therein in MS010005 for fiscal year 2003/04 to be collected on the tax rolls. DM:sr G:\GrpData\SpDist\Board Orders\2003\04-08.43 BO-MSO i0005.doc I hereby certify that this is a true and correct Orig.Dept.:Public Works Department(Special Districts) copy of an action taken and entered on the Contact: skip Epperly,313-2253 minutes of the Board of Supervisors on the cc: Assessor date shown. Auditor-Controller County Administrator County Counsel ATTESTED: X-P IIS A 2003 P.W.Accounting JOHN SWEETEN, Clerk of the Board of D.Morabe,Sp.Dist. Supervisors and County Administrator r By C ,Deputy Resolution No. 2003/ 211