HomeMy WebLinkAboutRESOLUTIONS - 01012003 - 2003-210 THE BOARD'OF, ?ERVISORS OF CONTRA COSTA COLIYT'Y,CALIFORNIA
Adopted this Resolution on April 8, 2003 by the following vote:
AYES: SUPERVISORS GIOIA, UILKEMA,
GLOVER AND DESAULNIER
NOES: None
ABSENT: None
ABSTAIN: None
DISTRICT III SEAT VACANT RESOLUTION NO.2003/210
SUBJECT: Tabulation of Mail-In Ballots, Contirmation of Diagram and Assessment and Levy of Street Light
Charges for LP 022030 County Service Area L-100,Concord area. (District IV)(WO 5001,ORG 7394)
The Board of Supervisors of Contra Costa County RESOLVES:
1. On February 25, 2003, the Board of Supervisors adopted Resolution No. 03/132 directing the filing of the
engineer's report for street light charges for County Service Area L-100. As directed by the Board, the Engineer
of Work has filed the engineer's report.
2. On February 25, 2003, the Board adopted Resolution No. 03/132 declaring the Board's intention to levy and
collect street light charges to operate and maintain facilities and services within CSA L-100 for fiscal year
2003/04 and setting a public hearing for April 8, 2003. Notice of the hearing was given in the time and manner
required by law.
3. Resolution No. 03/132 directed the Engineer of Work(Public Works Director)to cause to be mailed to property
owners within LP 022030 the notices and ballots required by Section 4 of Article XIII D of the California
Constitution(Proposition 218).
4. The notices and ballots have been mailed to property owners and the returned ballots are ready to be tabulated.
NOW,THEREFORE, the Board FINDS,DETERMINES and RESOLVES that:
5. A public hearing was held before this Board on April 8, 2003 at 9:30 a.m. At the hearing, the Engineer of Work
presented to the Board all ballots received from property owners within LP 022030 (a proposed tabulation of
those ballots). The Board heard and considered all protests against the proposed assessments and tabulated the
returned ballots according to the proportional financial obligation of the affected properties. The Board also
afforded to every interested person an opportunity to make a protest to the engineer's report, either in writing or
orally,and the Board considered each protest.
6. A majority protest,as defined in section 4(e)of Article XIII D,does not exist.
7. The Board hereby confirms the diagram and assessment as set forth in the report of the Engineer of Work and
hereby authorizes the levy of the street light charges set forth therein in LP 022030 for fiscal year 2003/04 to be
collected on the tax rolls.
SE:sr I hereby certify that this is a true and correct
G.\GrpData\SpDist\Board ordersi2003104-0"3 Bo-LP022030.doc
Orig.Dept.:Public works Department(Special Districts) copy of an action taken and entered on the
Contact: Skip Epperly,313-2253 minutes of the Board of Supervisors on the
cc: Assessor date shown.
Auditor-Controller
County Administrator
County Counsel ATTESTED: APRIL 8 2003
P.W.Accounting JOHN SWEETEN, Clerk of the Board of
D.Morabe,Sp.Dist. Supervisors and County Administrator
1)
By 4 , puty
Resolution No.2003/210