Loading...
HomeMy WebLinkAboutRESOLUTIONS - 01012002 - 2002-426 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY,CALIFORNIA. Adopted this Resolution on July 9,2002 by the following vote: AYES: SUPERVISORS UILKEMA, GERBER, DESAULNM, GLOVER and GIOIA NOES: NONE ABSENT: NONE ABSTAIN: NONE Resolution No.200E SUBJECT: Resolution confirming Final Engineer's Report,Diagram and Assessments for Countywide Landscape District AD 1979-3 (LL-2)and levying annual assessments to be placed on the tax rolls for Fiscal Year 2002/2003. The Beard of Supervisors of Contra Costa County RESOLVES THAT; The Public Works Director,Engineer of Work for Countywide Landscape District AD 1979-3(LL-2),filed an annual report for Fiscal Year 2002/2003,and the Board adopted its Resolution of Intention to levy and collect assessments Within the Assessment District Zones 1,2, 3,4, 7, 10, 11, 17, 18, 19,21, 22,27,35,36,37,38,42,45,48,54,57,61,63,64 and 68 for Fiscal Year 2002/2003 the public hearing held at 9:30 a.m. on Tuesday,July 9,2002,in the Chambers of the Board of Supervisors of the County of Contra Costa,Administration Building,651 Pine Street,Martinez,California 94553. Notice of the hearing Was given in the time and manner required by law. Upon review of the proposed Assessment District Zone 61 budget in the Preliminary Engineer's Report for Countywide Landscape District AD 1979-3 (LL-2) for Fiscal Year 2402/2003; due to a projected increase in maintenance costs it was necessary to adjust the proposed assessments from$0.00/parcel to$3 5.00/parcel. It was.not necessary to hold an election since the revised assessments fall well within the maximum allowable for Zone 61 ($200.00). At the public hearing,the Board afforded to every interested person an opportunity to make a protest to the annual report either in writing or orally,and the Board has considered each protest. The Board hereby over rules each of these protests and finds that the protest against the proposed improvements in each zone,including all written protests not withdrawn in writing before the conclusion of the protest hearing, is made by the owners of less than one-half of the area of the land to be assessed. The Board then closed the public hearing. The Boardhereby confirms the Final Engineer's Report diagram and assessments as set forth in the annual report of the Assessment Engineer of Work and hereby levies the assessment to be placed on the tax rolls set forth therein for Fiscal Year 2402/2003. 1 hereby certify that this is a true and correct copy of an action taken and entered on the minutes of Board of Supervisors on the date shown. SE:JR:sr G:\GrpDataiSpDist\Board orders\Annual Renewals\ ATTESTED: 2002\LL-2\Bcard Packet for LL,2.doc JOHN SWEET ,CEerk Boar of Supervisors and County Orig.Dept.: Public Works(Special Districts) Administra Contact: Slap Epperly(313-2253) cc: County Administrator County Counsel B Auditor-Controller County Assessor Depu PW Accounting J.Rushton,Sp.Dist. Resolution No. 2002/ 426