HomeMy WebLinkAboutRESOLUTIONS - 01012001 - 2001-023 Recorded at e
Contra Costa Counuest of:ty
IIII I�I III I III II III I`II II III IIII I IIII I III I III
Public Works Department CONTRA COSTA Co Recorder Office
Engineering Services Division STEPHEN 1, WEIR, Clerk-Recorder
Return to: DDC— 2001-0024909-00
Public Works Department
Engineering Services Division Thursday, FEB 01, 2001 15:03:34
FRE $0.00
Tt 1 Pd $0.00 Nbr-00002413332Irc/ 1-16
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Resolution on January 16, 2001 by the following vote:
AYES: SUPERVISORU 'GIOIA, GERBER, DeSAULNIER, GLOVER and UILKEMA
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
RESOLUTION NO.: 2001/23
SUBJECT: Accept Completion of Improvements MS 64-90, Marsh Creek area.
The Public Works Director has notified this Board that the improvements in Subdivision MS 64-
90 have been completed. The improvements have been inspected by county staff(both Public Works and
Building Inspection). The improvements as constructed do satisfy the County's minimum standards and
are shown on the improvement plans(and all subsequent revisions).
The original plans dated May 29, 1992 were designed by Mr. Andrew. Palffy (RCE #43704).
Subsequent revisions(reducing the costs)were designed by Mr. Robert J. Costa (RCE#14230).
The original plans contained road and drainage improvements that were superior to the revised
plans and exceeded both the County's minimum standards and the minor subdivision's conditions of
approval.
I hereby certify that this is a true and correct copy of an action
taken and entered on the minutes of the Board of Supervisors on
the date shown.
ATTESTED: January 16, 2001
PHIL BATCHELOR,Clerk of the Board of Supervisors and
Coun Administrator
BY 944'r—Deputy
RESOLUTION NO. 2001/ 2 3
SUBJECT: Accept Completion of Improvements MS 64-90, Marsh Creek area.
DATE: January 16, 2001
PAGE: 2
The revised plans result in a road much more rural in nature and a road that will likely require
increased long-term maintenance costs. But those revised plans meet the County's and general accepted
minimum engineering standards.
The Parcel Map for this development was approved by this Board on June 22, 1993 and the road
and drainage improvements were constructed without the need for agreements or bonds.
NOW THEREFORE BE IT RESOLVED that the improvements have been COMPLETED as of
January 16, 2001 and improvements are private and therefore,no warranty period is required.
RL:lap
G:\GMData\EngSvc\BO\2001\Temp\MS 64-90.doc
Originator: Public Works(ES)
Contact: Rich Lierly(313-2348)
cc: Public Works Tax I.D. or SSN Accounting
R.Bruno,Construction Div.
L Florin,M&T Lab
Maintenance Div.
Recorder(via Clerk),then PW Engineering Services
Sheriff-Patrol Div.Commander
CHP,c/o Al
CSAA—Cartog
Bradford Financial,345 Lorton Avenue,Ste.304,Burlingame,CA 94010
Robert Costa,2388 Todds Crest Dr.,Bend,OR 97701
Andrew Palffy,1440 Maria Lane,Ste.200,Walnut Creek,CA 94596
RESOLUTION NO. 2001/ 2 3