Loading...
HomeMy WebLinkAboutRESOLUTIONS - 01012000 - 2000-486 File: 105-000I/B.4.4 THE BOARD OF SUPERVISORS AS EX OFFICIO THE GOVERNING BODY OF THE CROCKETT-CARQUINEZ FIRE PROTECTION DISTRICT CONTRA COSTA COUNTY,CALIFORNIA Adopted this Order of October 17,2000,by the following vote: AYES: SUPERVISORS GIOIA, UILKEMA, DESAULNIER, CANCIAMILLA AND GERBER NOES: NONE ABSENT: NONE RESOLUTION NO. 2000/`4gf; SUBJECT: Award of Contract for New Fire Station No. 79, 1423 Lillian Street, Crockett, for Crockett-Carquinez Fire Protection District Budget Line Item No. 7028-4734 Authorization No. 0929-WH734B Bidd Total Amount Bond Amounts Bay Commercial Construction, Inc. $673,316.00 Payment: 3450 Palmer Drive, #4-187 which includes $673,316.00 Cameron Park, CA 95682 $549,000.00 Base Bid, Performance: $ 7,945.00 Add Alt.No. 1, $673,316.00 $ 9,371.00 Add Alt.No. 2 $107,000.00 Add Alt. No. 3 Alten Construction, Inc. San Rafael, California Page Construction Novato, California Pacific Coast Reconstruction and Building, Inc. Concord, California The above-captioned project and the plans and specifications therefor having been previously approved, Addenda Nos. 1, 2, 3, and 4 having been issued and approved, and bids having been duly invited and received by the Director of General Services on August 31, 2000; and The Bidder listed first above, Bay Commercial Construction, Inc. („Bay"), having submitted the lowest responsive and responsible bid, which is $146,739.00 less than the next lowest bid; and The Board having evaluated all of the documentation of the good faith effort by Bay to comply with the requirements of the County's Outreach and Mandatory Subcontracting Minimum Program; and The Director of General Services recommending that the bid submitted by Bay is the lowest responsive and responsible bid, and this Board concurring and so finding; NOW THEREFORE,the Board finds,determines and orders as follows: The Board DETERMINES that Bay, as the lowest monetary bidder has demonstrated a good faith effort,pursuant to the specifications for this project,to comply with the requirements of the County's Outreach and Mandatory Subcontracting Minimum Program, and the Board WAIVES any irregularities in such compliance; and The Board ORDERS that the contract for the furnishing of labor and materials for said work is awarded to Bay at the listed amount and at the prices submitted in said bid, and that said contractor shall present two good and sufficient surety bonds as indicated above, and that the Director of General Services shall prepare the contract therefor; and RESOLUTION NO. : 2000/-486 NEW FIRE STATION NO. 79, 1423 LILLIAN ST. 105-0001/B.4.4 CROCKETT,FOR CROCKETT-CARQUINEZ October 17, 2000 FIRE PROTECTION DISTRICT The Beard FURTHER ORDERS that after the contractor has signed the contract and returned it, together with the bonds as noted above and any required certificates of insurance or other required documents, and the Director of General Services has reviewed and found them to be sufficient,the Director of General Services is authorized to sign the contract for this Board; and The Board FURTHER ORDERS that the Director of General Services is authorized to sign any escrow agreements prepared for this project to permit the substitution of securities for moneys withheld by the County to ensure performance under the contract,pursuant to Section 22300 of the Public Contract Code; and The Board DECLARES that should the award of the contract to Bay be invalidated for any reason,the Board would not in any event have awarded the contract to any other bidder,but instead would have exercised its discretion to reject all of the bids received. Nothing herein shall prevent the Board from re-awarding the contract to another bidder in cases where the successful bidder established a mistake,refuses to sign the contract or fails to furnish required bonds or insurance(see Public Contract Code Sections 5100-5107). Orig. Dept.: General Services Dept. -Architectural Division cc: General Services Department Architectural Division G.S. Accounting File: 105-0001/A.5 County Administrator's Office Contract Compliance Officer Auditor-Controller County Counsel Consultant(via Arch. Div.) Contractor(via Arch. Div.) Surety(via Arch. Div.) Crockett-Carquinez FPD(via Arch. Div.) G&crri I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: OCTOBER 17, 2000 _-- PHIL BATCHELOR, Clerk of the Board of Supervisors and Count Administrator By Deputy HA2000\1 05000 1\00B00157b.doc Office of the County Administrator Contra Costa County Affirmative Action Office 651 Pine Street, Martinez CA 94553 (925) 335-1045 fax: (925) 646.1353 Memorandum Date: October 4, 2000 To: Board of Supervisors From: Emma Kuevor et�w-/ Affirmative Action Officer Subject: New Fire Station No.79, 1423 Lillian Street, Crockett, For Crockett- Carquinez Fire Protection District (WH734B) This Office has reviewed the bid and documentation of good faith effort submitted by the low bidder, Bay Commercial Construction, Inc., for this project. Attached for your review and consideration is the documentation of good faith effort from Bay Commercial Construction, Inc. c:memon ewfirestation79crockett GENERAL SERVICES DEPARTMENT Architectural Division 1220 Morella Avenue, Suite 100 Martinez, California 94553-4711 (925) 313-7200 FAX (925)313-7299 File: 105-0001/B.4.4 Date: October 17, 2000 TO: Board of Supervisors FROM: Barton J. Gilbert,Director of General Services SUBJECT: CONTRACT AWARD RECOMMENDATION; Agenda Date October 17, 2000; Authorization No. WH734B Bids for NEW FIRE STATION NO. 79, 1423 LILLIAN STREET, CROCKETT, FOR CROCKETT- CARQUINEZ FIRE PROTECTION DISTRICT, were received and opened at the County Architectural Division Offices on Thursday,August 31, 2000. It is recommended that the Board of Supervisors award the construction contract to the low bidder, Bay Commercial Construction, Inc. of Cameron Park, in the amount of$673,316.00, which includes $549,000.00 for the Base Bid, $7,945.00 for Additive Alternate No. 1, $9,371.00 for Additive Alternate No. 2, and $107,000.00 for Additive Alternate No. 3. The Consultants cost estimate for the initial construction contract was $607,000.00. Base Bid only. Other bids received were as follows: Add Add Add Add Base Bid__ Alt. #1 Alt. #2_ Alt-t4 A1145 1. Alten Construction, Inc. $661,065 $ 8,734 $29,670 $120,586 $820,055 San Rafael, CA 2. Page Construction $725,245 $ 8,203 $27,358 $104,967 $865,773 Novato, CA 3. Pacific Coast Reconstruction $757,000 $10,000 $34,500 $175,000 $976,000 and Building, Inc. Concord, CA The Contract Compliance Officer has submitted the low bidder's documentation of good faith effort to comply with the requirements of the County's Outreach and Mandatory Subcontracting Minimum Program to the Board for consideration. GB:bg cc: County Administrator's Office County Counsel Clerk of the Board (w/bids) Contract Compliance Officer HA2000\105000 r\00s00 r 58m.doc y Y� DAY COMMERCIAL CON5TRUCTIONt INC., I -Q1 ( CA State License#668763 rr ' C.Y. fi . 1"f t:. ,, v: S"rvL�i r SEP 0 7 2000 i BENDER WCCti- btu JORDAN L i SLE j "00 V-4 .5 Mailing Address; 3450 Palmer Drive#4 Suite 167, Cameron Park, CA 95682 Office Location: 12181-A Folsom Blvd., Rancho Cordova, CA 95742 Ph. 916.808.8600 Fx. 918,608.0971 Publishing PROOF OF 1331 T stator,Suite PUBLICATION STATEMENT $aer4ezato,CA 95811 4 916J725-5432 Fax,: 729•1588 for thy:ftily Reporter Slectro nk Mewspaper The Dally Reporter Etectronk Newspaper, started in 1994, is a recognized, minority focused (DVBE, DBE„ SSE, WBE, MBE) paper. It contains building and construction industry information posted everyday on the Internet at www.thedallyreporter.net All the ads posted on the World Wide Web during a given week are published in a small print run and mailed first class to state, city, and county agencies as well as to generals and subcontractors, architects, engineers and manufacturers. The Daily Reporter is published by C&S Publishing, 1331 T Street,Suite 16, Sacramento,CA 95914. For information on this newspaper, call 516-729-5432. On ine Circulation over and growingr am over the age of eighteen, a citizen of the United States, and a resident of Sacramento County. I am not a party to or otherwise interested in the attached matter. I am the principal clerk of the publisher of the Daily Reporter Electronic Newspaper. The Daily Reporter is published and printed in the County of Sacramento, The notice, a printed copy of which is attached as Exhibit A, was set in type not smaller than nonpareil and was preceded by words describing the general character and terms of the notice printed in a black face type not smaller than nonpareil. Exhibit A was published in the Daily Reporter from !L Qtr to I declare under penalty of perjury that the forgoing is true and correct and that the attached advertisement, Exhibit A, was affixed to this Proof of Publication by my own hand. Executed on at Sacramento, California Steve Berlin Page 2 The Dai17 Reporter Electronic NeurSpapear August 25, 2000 Sub Bids Requested From Qualified MHE/WBE l subcontractors and Suppliers Installation and Ongoing Maintenance of Diesel and Natural Sub Bids Requested From Qualified DVB$ Gag Generators,Fuel Storage Systems and Automatic Transfer Subcontractors and Suppliers Switches. Water Line Replacement,Dept.of Youth,Authority RFP No.:0225.DI Bid Date.8.31-70 at 5.00 pm Preston Youth Correctional Facility,lone,CA 100X Payement&Performance Bonds may be required State of California,Dent.of General Services Stewart ,& Steverson TradeatS -rvi s: Ductile Iron pipe & Fittings, Cathodic 85S Stillwater Road,West Sacramento,CA 95691 Protection, Filter Fabric, Boring & Jacking, Traffic Control, Striping,AC Paving,AC Sawcutting,and Trucking (016) 572-5078 Fam(8 16)372-2 721 Bid Date: 9-7-00 at 2:00 pm Equal Opportunity Employer Banding maybe required. '�Tadna�ts Corporation Sob Bids Requested From qualified IYtBEjWBE/SBE/ DBE/l V8Z Subcontractor anal/or Suppliers tor: 9164 Rehco Road, San Diego,CA 92121-2265 New Fire Station#79 for Crockett-Carquinez FRD Contact:Carlos Perea Demolition and Abatement of Existing Fire Station (838) 550-1460 Fax: (858) 550-1470 Construction of New Fire station Pre-Fabricated Metal ,Equal opportunity Employer Building Sub Bids Requested From qualified 1'i1BE/WBE/SBI:/ Trad s/gyp nr :Site Work,Utilities,Finishes Electrical, DBE/0VBE Subcontractors and/or Suppliers for: Mechanical, : 8-31-0 Interior Fi�Yisches Bid Date: 8-31-00 at 2c00 lain Business operations and Maintenence Facility Expansion 1009 Payement&Performance Bonds may be required Pinole, CA Bid Date:8-29.00 0 2:00 pzn Crirx�xner Elementary School,Frexnoxxt,CA Bey C4nllnel*CI1� Construction, Inc. Bid emeDate8-ry Sc �2:00 pm 3450 Palmer Dr.,Suite 4-187',Cameron Park,CA 95582 Contact:Steve License. 668765 SRIAIT?- Facilities Expansion. Project,Phase 0 (9 16)608-8600 Fax:(916) 608-0'1971 Sacramento County Sanitation District,Contract 4518 Equal Opportunity Vicployer Bid Date:8-31-00 4 2:00 pm Berkeley Way Mixu-Park Children's Play Area Renovations Sub Bids Requested.From qualified li1BE/W9E/S0E/ Bid pate:9.5-00 0 2:00 pra DBE/DV8E Subcontractors and/or suppli 4J7l W014UNC/ ---- vv, .✓, �vr ..... DA. Y MMERCtAL CON5TRUCTION, INC., (- CA State License#668763 Y . a facsiinfle tansn-littal To: STEVE JORDAN Fax: From: Laura Meyer Date: 0906-00 Re: GOOD FA.TH EFFORT/ Pages: CROCKETT FIRE STSTSON #79 CC: FILE 0 Urgent Q For Review 0 Please 0 Please 0 Please Comment Reply Recycle ORIGINALS WILL BE SENT VIA US MAIL BENDER JORDAN LAR. FILE . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mailing Address: 3450 Palmer Drive#4 Suites 87, Cameron Park, CA 95682 Ofiloe Location: 12181-A Folsom Blvd., Rancho Cordova,CA 95742 Ph. 916.608.8600 Fx. 916.60$.0971 4dJ VV/ 6VVV Lv/• JJ di VV VVVJI L Li"1+ Ldp 1 +dl\V Lr14 Vv+1,..•+ i nVV Vb SUBCONTRACTOR SUMMARY SHEET FOR THE CROOKET FIRE STATION 71 PROJECT SELECTED RUNNER UP 2ND SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR ABATEMENT IAAV19LO COMPANY NO BIDS RECEIVED NO BIDS RECEIVED 1.610-$4th BRIAN NOLTE SITEWOWASPHALT OOUZINS ASPHAULT NO BIDS RECEIVED NO BIDS RECEIVED STORM DRAINS 1.707.251+9056 TERRY WAGNER METAL FABRICATION ACTION IRON WORKS NO BIDS RECEIVED NO BIDS RECEIVED 11-916-303-70711 BRADJONES CONCRETFISTEEL COUMNS ASPHAULT NO BIDS RECEIVED NO BIDS RECEIVED 1.707.261.9058 TERRY WAGNER ROUGH CARPENTRY SELF PERFORMING NO BIDS RECEIVED NO BIDS RECEIVED CASEWORK CASTLEWOOD CABINETS NO BIDS RECEIVED NO BIDS REOEIVEO 1.707.87$-m2 JOHN DOMINGUEZ WATERPROOFING PRINCE PAINTING NO AIDS RECEIVED NO BIDS RECEIVED 1.408.9$0-D893 TOM KIM INSULATION SELF PERFORMING NO BIDS RECEIVED NO BIOS RECEIVED FLASHINGA4VAC BRICE MECHANCAL NO BIDS RECEIVED NO BIDS RECEIVED 1.815638.0220 BRUIN GUILTY SEALANTS SELF Pt gPORMING NO WDS RECEIVED NO BIDS RECEIVED DOORS,FRAMES,HARDWARE SELF PERFORMING NO BIDS RECEIVED NO BIDS RECEIVED METAL BUILDING SURE BUILT INC NO BIOS RECEIVED NO BIDS RECEIVED 1.208400.1400 CERAMIC TILE AAA TILE NO BIDS RECEIVED NO BIDS RECEIVED 1416422.2282 CONCRETE S6AL#PA1NTING PRINCE PAINTING NO BIDS RECEIVED NO BIDS RECEIVED 1408-Bd0-o883 TQM KIM PLUMBING VIPER MECHANICAL K,S.KRUSE NO BIDS RECEIVED 1.87'',x-427.5547 KRIS KRUSE ELECTRICAL NORTHERN STATES BLAKESLEE NO BIDS RECEIVED 1.925.556.9440 1.707.645.0363 MIKE HENRY DAVID WEINBERG TOILET PARTITIONS WARDA ENTERPRISES NO BIDS RECEIVED NO BIDS RECEIVED 1.408.779.1937 DAVE WAROA +'YVd Bay Commercial Construction, Inc Phone quote farm Subcontractor/Supplier L4 ,4 bate Quote was given "r Who supplied quoteX111- Time quote was takerl�~:40 a. p.m. FOB �YesNo laic Included ss No Prevailing Wage es / o Union Affiliated Yes No if Yes What Local Scope of work: 'total Lump sum cost S t� Bay Commercial Construction, Inc 'hone quote farm Subcontractor f Supplier t - bate Quote was given GJ Who supplied quote Time quote was taken t a.m p.m, PtJB �PNo Tax Included a N4 Prevailing Wage1/9 es NO Union Affiliated Yes No If Yes What local Scope of work: - I;UC442�Q 66y'-'�J111ol Total lump sum cost $ CJJI VV/ f.VVV iVa VV d14VVVVdfi ye-lr t.sVi'ir ry�l lydiP'1y. VV1Vr r Wai ,ry Bay Commercial Construction, Inc Phone quote form Subcontractor t Supplier � v„�o Date Quote was given Who supplied quote G Time quote was taken ,? OV a, !p.m. FOS lax include Yes Ne Prevailing Wage es No es No Union Affiliated Yes No if Yes What Local I�Iq - i I 11 Y�r+iwrr�syl� Scope of Work: Total lump sum coat $ u�r uvf .Fuvv +. . ,.,. ..�.vvvvv✓ � Bay Commercial Construction, Inc Phone quote farm Suboontractor t Supplier ,+ 1`t'(5P' — hate Quote was given 5 36 Who supplied quoteA&4w. Time quote was taker)( : .-V p.m. FOB ( es No Tax Includ Yes No Prevailing Wage Xas 0 _ Union Affiliated Yes o if Yes What local Scope of work. 9AI t l 2t &6 �. J&-LP& Com, ,. ..� M Total lump sum cost $ iJ d/ V4/ AVVv i v• ..v ri V V VV V d i Bay Commercial Construction, Inc Phone quote form Sut=ntractor l Supplier �if/ GtLY ! hate Quote was given go Who supplied quote Tints quote was taken 1 t3 a,m 10.M.- Fob es ! Tax Includ Yes/_ o Prevailing Wag Yes No Union Affiliated Yes //No If Yes What Local Scope of work: r 4. lAr3 ,- Total lumps sum cost S tJ 7J GJ i7J tFJ+.+cr e..+. vv ...�vvvvv.s a �, .+..+ ,� ..-... ... ��••r, . ..-,_. .. 1 { //I • EWM Electric, Inc. INDUSTMAL / COMMERCIAL Lic. #416488 14 WEST VD STASET P.O. SOX 1951 SANTA ROSA, CA 95402 PHONE (707) 545-6393 FAX (707) 545.9517 Attention : Estimator Company : Bay Commercial Project Fire Station No. 7e Date : August 31, 2000 Estimator : DW Estimate File : 2738 Fax # : 916-608-0971 The following quotation defines the entire scope of work that we intend to provide for the above-referenced project. Included are all submittals, warranty and training services required for the equipment we provide. All specified equipment will be installed complete unless otherwise noted. 1, SCOPE OF WORK: BUILDING:$ St5'(ol/�, ALTERNATE•.$ 51. y Per plans and spec's as listed below. TOTAL:$ (o3J 6100.5 Power and lighting complete Telephone and CATV cabinets and risers Phone system backboxes and conduit only (tea. shown on plans) Controls and power for garage door openers Transfer Switch per spec All necessary demolition Temp power and lighting 2. EXCLUSIONS: Permits and fees Fire Alarm (not shown on plans) Data System (not shown on plans) CATV (not shown on plans) PA System (not shown on plans) Generator (by owner) Thank you for the opportunity to bid on this project, David Weinberg BLAKESLEE ELECTRIC —.. 100 'd U71 UCl/LUUU yJ. JJ dy QQUQUJt y LJ/91 VVI'u'141\LjP14 VI,.1l 9..J1 Auo'-'31-00 01 : 30P P. 01 71NORTHERN STATES ELECTRIC LLC L.i-C Nse 419212 6351 SCARIErr COURT Pig: (92 5 ) 556-9440 Dublin, CA 94566 FAX: (925 ) 556-9442 August 31, 2000 Bay Commercial Construction Project: Fire Station No. 79 Fax: (919)6038-0971 1423 Lillian Street Crockett, CA We are pleased to submit our bid/proposai to furnish and install the electrical work for the subject project in accordance with plans and specifications provided by Don Dommer Associates as shown on sheets noted in Index Sheet T1 dated May 30, 2000, including Adciendums 1, 2, 3 and 4, as fellows: 1. Bass Bid........ ............................ ..... .................................................... $ 35,600.00 2. ADD. Alternate No. 2............................................................................ $ 880.00 3. ADD: Alternate No. 3.,......................................,.,.,.............................., $ 1:0,400,00 TOTAL BID (items 1, 2 and 3).... ............................... .................... ..... $ 46,880.00 Exclusions: A. Seismic wires for light fixture support B. Special blocking for light fixtures C. Cutting/patching/painting D. Demolition (I.D., tag, safe-off only) E, Debris removal, haul-off, dump F. Temporary power or lighting G. HVAC control conduits/wiring H, Telephonefdata wiring 1. Vehicle exhaust system control wiring/equipment/connections NOTE: All exclusions to be included in subcontract Agreement between General Contractor and Northam States Electric i_l_C Should you have any questions, please call. Sincerely, Mike Henry ESTIMATOR G7! GO! LuuG a,:. ,.,� ✓a NVtJu4.J t a .✓r., vv,..-.0 ware w�.,..., _....... FROM ,: TOM PROELL. SIMPLY C/F PHONE NO. : 707 265 9275 ""SeP. 01 20M 11:3GAM P2 COUZIN ` A PHAL.T b"P. MOVICE' TEL(707)251-9056 ASPHALT & CONCRETE FAX (707)265-9275 SOLUTIONS 4195 Burgundy Way Esti(we NAPA, CA'.9+45 8 Number El I i Date 08/31100 Proposal lots Site BAY COMMERCIAL CONT. FIRE STATION No,79 STEVE MEYER CROCKETT. CA 3450 PALMEP,#4 SUITE 187 CAMERON PARK CA 95682 P.0 Num Tenns Sate Rep. Sales Territory Code ON COMPLETION TOM PROELL NORTHERN CALIFORNIA Description Amount EXCAVATE AND INSTALL.SUBDRAM,WA71M SEWER.,GAS, BOLLARDS,STORM DRAIN&Dis. EXCAVATE FOR FOUNDATION USE DIRT TO BACK FILL IN NEW $8,000.00 FOUNDA'T'ION,HAUL OFF SPOILS INSTALL CONCRETE.FOUNDATION,PAD AND STEEL PER PLANS 78,500.00 FURNISH ALL LABOR,MATERIALS,TOOLS AND EQUIPMENT TRANSPORTATION ANO IN URANCL NECESSARY TO PF.RI OPJd THE FOLLOWING WORK AS PER ENCLOSECI sp ICAnoNa UNLESS CONDITIONS ARE MADE TO pROFOSAL ALL PAYMENTS ARE DUE UPON �r COMtMETION OP JOB AND RECEIPT OF INVOICE. TOTAL S136$KOO ALLI ��sst I llmali,�s �uv ►ase wmpum AUTHORIZED w A WJOM MA"R A=RMG m STANURO PRAO't1 U,ANYALrcm- WK OR MVIA"FROM AIM SPECO CA710M WVMVWG SM con 10111Be SIOVIA MZ ABM GNATURE ACOMM OR DELA s bFfM L �dc r ANO TFIMY WAGNER OTHO r NOCESS Y f4uMME.errs ASPHALT VAL PMUUVWTYAND TOM PRO ELL WOR*L S COV914TKua WSURANCE AS AGOL ED BY LW LIC#675997 ACCEPTANCE OF PP0P0SAL-rmw& NOM- EtI ROPOSAL lA1YMVMUWRBYMIFMAtlMMWSM30DAYS. TOSAMCWMAF&SqWWMWAREWSYgWMYOUAMMOM TCDO'IIEW.'EIKAfiiF' I�.DATI�TTY+i11.IlEMdIU�/�tDtlltNiE�AED1tE.11lti�EitEMtt ISIiECEl T00d?LO MtArM&TOEiiFtRCEtt1EErtMO r14OiltMCEPikCUS t ACIffiEs1DWAWM61EdWFWT*ATTCR?VPE &DAn OF ACCEPTANCE. SIGNATURE 4+J! auJ iaaa wa. ..+..i .++aavua�r a 707-R78-8957 a 1 Au; 29 00 01a01p i CA.STLEWOOD CABINETS 500 Industrial Way 07,Dixon CA M20 Phone 707-67843682 PAX 707-6788357 August 10,2000 rt Attention: Re: New Fire Station no. 79, Crocket,CA. Our bid on the above referenced project is as follo",(prices are net,sales tax included, F.O.B. curb jobsite,installation is NOT included) subject to our Standard'Terms and Conditions, which are incorporated by this reference: We propose to manufacture and supply the items listed 4n Page 5: Bid price: $10,056.00 Shipping $ 700.00 Tax 7.375% $ 741.63 TOTAL $11,497.63 The abovt Bid is accordance with Sections 12370 only of the project specifications and Plans dated 05/34/00, including Amendment(s) # 1, &2. Inclusions: a) See Castlewood Cabinets Standard Terms gages 3&4. Exclusions: a) No Install.this will be by General Contractor of choice, Castlewood Cabinets does not install. b)Metal brackets by others. c) Plywood Wainscot. d)Cabinet blocking by G.C. "Terms of sale: 10% upon acceptance 40%upon SOOto completion of job 40% upon 100% completion of job 10% within 30 days after job completion Unless otherwise specified in the Sid documents,prices in this Bid are valid for 30 days. Thank you for the opportunity to bid. W sj�W D CABINETS gur (Continued Page 2) Aub; 23 00 01 : 01P 707-878-8957 ~52 ` !.ASTL'EW OOD CASJ VETS Page 2 New Fire Station No.79 Crocker,CA, 08/10/00 ACCEPTANCE CASTLEWOOD CABINETS is hereby authorized to proceed with the work mentioned in the above proposal, for which we agree to pay the full amount according to the terms listed in the above proposal. Signature Date (Continued Page 3) VZ)!VCt GViJV aw.__ 1.V... _SF.t, R ;ug23 00 01 : 01P w 70"7=678-eSS7 vV P. 3 CASTLEWOOD CABINETS Page 3 New Fire Station No. 78, Crocket, CA. 08110100 CASTt.EMOD CABINETS Standard Tums • Acceptance,use, or incorporation of this Bid shall constitute it binding agreement between CASTLEWOOD CABINETS and the customer, to whom CASTLEWOOD CABINETS will kook for payment, notwithstanding any provision to the contrary. CASTLEWOOD CABINETS shall not be bound by any agreement to which it is not parry. + Acceptance or use of this Sid shall be deemed acceptance and agreement to all of the terms and conditions set forth herein which is an integral part of this Bid. • CASTLEWOOD CABINETS shall not commence any work on the project until it has received a signed contract or purchase order incorporating the provisions of this Bid and its terms. • All work to be furnished is of a"custom'nature, fabricated specifically for this project. CASTLEWOOD CABINETS requires a 10%deposit upon placement of order. • Should the amounts invoiced not be paid on time, CASTLEWOOD CABINS shall have the right to decline to make deliveries,and the price for the undelivered work and stared work shall become due and payable. • Payments not made when due shall be subject to.a 15% per month service charge from date due until paid. CASTLEWOOD CABINETS shall be entitled to recover costs of collection,including attorneys'fees and costs reasonably incurred, if payments are not paid when due. • No provision of any agreement subsequent to these Hid terms shell serve to void CASTLEWOOD CABINETS'entitlement to payment or right to file a lien, stop notice, or claim on its behalf for properly performed work,in the event that any payment to CASTLEWOOD CABU;ETS is not timely made. • Unless specified or stated otherwise,this Bid is based on the"Woodwork Institute of California's, Manual of Millwork, Latest Edition"with regard to materials,material dimes ions, grades,designs,and industry practices. • Unless specified or stated otherwise, the use of non-standard plastic laminate patterns,or non-standard plastic laminate finishes are subject to an up-charge. Unless specified or stated otherwise laminated plastic selections shall be made from Wilsonart, Neva mar, Formica,and Pioanite. (Continued Page 4) Au„g. 29 00 01 : 01p 70'7--.678-8957 p. 4 CASTLEWOOD CABINETS Page 4 New Fire Station No. 79, Crocket, CA. 08/10/00 • CASTLEWOOD CABIN= shall be given a reasonable time in which to make delivery of materials and/or labor to commence and complete the performance of the contract. CASTLEWOOD CABINETS shall no be responsible for delays or defaults where occasioned by any kind and extend beyond its control,including but not limited to: delays caused by owner, General Contractor, Architect and /or Engineers,delays in transportation, shortages of raw materials,civil disorder, labor difficulties,vendor allocations, fires, floods:, accidents and acts of Cod. CASTLEWOOD CABINS shall be entitled to equitable adjustment in the Subcontract amount of additional costs due to unanticipated project delays or accelerations. • All workmanship is guaranteed against defects in workmanship for it period of one year from the date of installation. This warranty is in lieu of all other warranties, expressed or implied, including any warranties of merchantability or fitness for a particular purpose. The exclusive remedy shall be that CASTLEWOOD CABINETS shall replace or repair any part of its work,which is found to be defective. CASTLEWOOD CABINETS will not be responsible for special,incidental,or consequential damages. CASTLEWOOD CABINETS shall not be responsible for damage to its work by other parties or for improper use of equipment by others. The availability of the guarantee and warranty provisions herein are expressly conditioned upon CASTLEWOOD CABINETS approval within the guidelines established by the Woodwork Institute of California of the conditions at the jobsite or storage area prior to the delivery of work. • Warranty is made to the purchaser only and only for those items which have been PAID FOR IN FULL. • 'Work called for herein is to be performed during the Subcontractor's regular working hours. Ali work performed outside of such hours shall be charged for at rates or amounts agreed upon by the patties at the time overtime is authorized. • CASTLEWOOD CABINETS shall not do any extra work or work beyond the scope of this Bid until it has received a signed change order. Any extra work or work beyond the scope of this Hid that is to be done on a time and material basis in lieu of a faced price will be billed for separately. • No back-charge or claim of the Contractor for services shell be valid except by an agreement in writing by the Subcontractor before the work is executed except in the case of the Subcontractor failure to meet any requirement of the subcontract agreement. In such event, the Contractor shall notify the Subcontractor of such default, in writing,and allow the Subcontractor reasonable time to correct any deficiency before incurring any costs chargeable to the Subcontractor. • All disputes shall be decided by Arbitration in accordance with the American Arbitration Association Construction Industry Rules. I have read and understand the Standard Terms and Conditions of this Bid. Signature Date (Continued Page 5) Aub• 2J 00 01 -. 01P 707-x;78-BS57 P. 5 CASTLB.W9®D CABINETS Page 5 New Fire Station No. 79, Crocket,CA, 08/10/00 Sid Scope of Work is as Follows: Kitchen Room 106 40'-6" Countertop with 6"backsplash P-Lam 40'-8" Lower cabinets with drs./dwmA adj. Shif. Birch 30'-0" Upper cabinets with drs. &adj. Shlf. Birch 6'-6" Countertop Q roll up door 12"wide P-.am Bay Commercial Construction, Inc Phone quote form Subcontractor r Supplier hate Quote was given ` Who supplied quote (.'1h 4g,7 Time quote was taken FOBes o Tax included es No Prevailing Wa Yes No Union Affiliated Ye o If Yes What Local Scope of work: l lA c'Si'?l 411 Total lump sum Cost $ 27F /h I � Y. A`G-31-D T1i'' 11 IS Al MARP I RLD COMPANY PAZ X10. 1 610 653 6604 1 4 Mfr RFIELD C 0 M MANY INC. Envirt nmvntal Service Contractors _��• Augus,`30, 2000 TO: General Contractor RE: Asbestos abatement at Tire}Station No, 79 located at 1423,Gillian Street Crockett, CA, Proposal to remove asbestos containing material(ACM from the above referenced location. Material addressed in this proposal shall he the ACMper Clayton Environmentals report that is part of the contract documents. EXCL USIONs L Connect or disconnect temporary power. 2. Weather protection. 3. HVAC, electrical, plumbing, gas cut, cap disconnect or lockout. 4. Bonds, Faxes, Fee's and any other permits other than standard notification fee's to the regulatory agencies pertaining to asbestos abatement notifications. 5 Removal and disposal of any other hazardous waste other than specified above. 6. .Demolition to access known or unknown asbestos containing materials. 7. Removal and disposal of PCB's and mercury vapor tubes. JUAR.P7,&`LD QUOUT'ION Pricefir this project shall be.. S18,900.00 Should you have arty questions or need further assistance,please give ore a call at(510)841-5533. Respec0 icily Su mitt if., Brien Nape Accepted:_. �.. .._` Project Manager Owner or Representative Marfielo'Company, Inc, 1818 Harmon Street Berkeley, C4 94703 ,Phone: 510.841.5593 Fax., 510.653.6504 License# 420123 --------. - -...- MEC1�A11i1CAL, INC. LICENSE NO/ 939717 Septe mbe rl, 2000 BAY COMMERCIAL ATTN: SUBJEIP Ts PLUMBING QUOTE This will serve as our proposal for the fallowing: INCLUSIOn. FM STATION NO.79,CROCKETT, CA BASEBM: s'�yoO (BELOW FLOOR D W'V ONLY) ALTS NA`I`>, S/gC2,co (ALL THE REST) Plan sheets P 1 and P'2; Spec section 15000 and 15400;addendums 1 thru 4;installation of gas solenoid slut off valve(valve provided by others, (N)gas piping from gas meter; DW,V piping;to 5 feet beyond grid line 1; CW piping from water meter(meter provided by others);shower door, shower drain body,shower valve, and shote head; EXCL TTMNS- I• Permits,bonds;water heater flue;water meter,excavation or backfill;provision or re plane d of KS-1;shower part or shower walls;items specified in"Scope"but not shown on the plans: "New backflow preeventere,"Diaesol piping", sad"Compressed air piping",Items shown on the plants but not spe cifiied/'RVVV, strow drainage piping and AD-1; 'PERMS AND CONDIL' ONS: Tams are net 30 days ftom dates of invoice, This quotation is valid 30 days From date of presentation.. Price and terms maychange after 30 days. Please refer to quote#6215ben corresponding with regards to this bid. ffARZRAN-T Y-: All wxte7rials provided to be fine from defects for one year from install of completion cad workmanship for 30 days from system start up date. This warranty requires Haat the systems:be properly used and maintained. ALL WARRANIUS VOID IF NOT PAID W EMM DUE. SOO GEORGE STREET. SANTA GLARA, CA SSOBA a 04083 880-1097 • FAX (406) 980-1009 ( d 8001066 'OK XVd WY IE:6 1H 00-1 -d8S ii►�JG^30-0@J 04 :20 pM K9 KRUS5 PLUMBING 925 427 5539 ►;. b i" K.S. KRUSE PLUMBING CO. �D 151 W. TRIDENT DRIVE Oiltt (� ! PITTSBURG, CA 94565 L 925-427--5547 FAX 427-5538 LIC. NO. 512710 C-36 X BID TRANSMITTAL To. BAY CONN ERCAL CONsm Fax: 916.60$-0971 From: Kris Kruse Date: 08-31.00 Rs: Plumbing quote Pis: ane LU M MG DID EMIR: Fire Station No.79,Crockett,CA. 00STt Base bid: $ 5,007.00 (below floor DWV only) Alternate: S 19,962,00 (a11 the rest) INMM-. Plan sheets P1 & P2; Spec swim 15000 dt 15400; Addenduma 1 thru 4; Instal- Mon of gas solenoid shutes valve (valve prodded by others); (N) ilas Piping from gas meter; DWV piping to 5 f+aet beyond grid lige 1;CW piping from water meter(meter provided by tethers); Shower door,shower drain body,shower valve,and shower head; RX—CLU-Mi Permits, bands; Water heater flu*;Wawr teeter; Excavation or back:0, Provision or placement of KS-1; Shower pan or shower wells; Items specified in 'Scope' but not shown on the plans: "New bacUlo w preventers", "`Meesel piping", and "Compressed air piping", Items shown an the plans but not specified:"RWL";Storni drainage piping and AD-1; @, EA�D Q& Aa per'Includes'and `Excludes',above; ELSM ME.- This proposal is good for 30 days ilom the above date. 4 .. Rblishing www.CandSPub.com www.SBEBulletin.com www.weekiyreporter.com Proof of Publication Statement for the Weekly bulletin newspaper The Sacramento Builders` Exchange Weekly Bulletin newspaper has been certified as a Newspaper of General Circulation by the Superior Court of the State of California in and for the County of Sacramento on December 15, 1992 (Case No.: 372702) and is a recognized Trade Paper in the building and construction trades. am over the age of eighteen, a citizen of the United States, and a resident of Sacramento County. I am not a party to or otherwise interested in the attached matter. I am the principal clerk of the publisher of the Sacramento Builders' Exchange Weekly Bulletin newspaper. On December 15, 1992, the Weekly Bulletin was adjudicated by the Superior Court of California and for the County of Sacramento to be a newspaper of general circulation. The Weekly Bulletin is published and printed in the County of Sacramento. The notice, a printed copy of which is attached as Exhibit A, was set in type not smaller than nonpareil and was preceded by words describing the general character and terms of the notice printed in a bla� face type not smaller than nonpareil. Exhibit A was published in the Weekly Bulletin on - ).-45 declare under penalty of perjury that the forgoing is true and correct and that the attached advertisement, Exhibit A, was affixed to this Proof of Publication by my own hand. Executed on C b • '. at Sacramento, California Steve Berli 1331 T Street, Suite 16, Sacramento, CA 95814 . 916-729-5432 . Fax: 916-729-1588 rsExchange, Inc. page 15 2000-09-01 t�HOME CORP LIS HOME CORP` { 11909,SILEROO,S11C1AMENTO s, 20044881 LA'LHOMECORi LIS HOME CORP.`' 9524-=I iJ1 k'IJCIIROVE �. � '2000-07-31 ".11S HOMECORP : VS HOME CORP`` 8164` "�A RAMENfO 2000.09-07 US HOME CORP US HOME CORP. 656 HENRY,FOLSOM 200407,91 LIS HOME CORP US HOME CORP 2633 MARINAPOINT,ELK GROVE 2004-07.31 WOOD$IDI`EMPIRE INC 7Y40MIDE EMPIRE INC; . , 2017 iA KHALL,,FOL.SOM PLACER COUNTY *' 2000-07.19 ARNAIZ DEVELOPMENT C131NC ARNAIZ DEVELOPMENT CO INC. 23621ST,LINCOLN 2000-07.19 BEAZER HOMES HOLDINGS CORP BEAZER HOMES HOLDINGS COR 7925 ROBINSON,ROSEVILLE 2000-07.20 JOHN MOURIER CONSTRUCTION JOHN MOURIER CONSTRUCTION 604A MORNING GLEN;ROCKLIN 2004-07-19 LENNAR RENAISSANCE INC LENNAR RENAISSANCE INC: 2909 OLD OAK TREE,ROCKLIN 2000-07.19 LENNAR RENAISSANCE INC LENNAR RENAISSANCE INC 5309 CLIPPER ROCKLIN 2000-07.21 MYERS HOMES OR CALIF C MYERS HOMES 26.35 FLARADAL.E,LINCOLN 2000. 07.20 MYERS HOMES OF CALIF C MYERS HOMES 2593 FLORADALE,LINCOLN 2000-07.20 MCKIM LINCOLN LLC L RON MCKIM CONSTRUCTION 244-GREY,LINCOLN =700407.19 MCKIM LINCOLN LLC RON MCKIM CONSTRUCTJON 2519 1ST,LINCOLN 2008-0720 MARK L,&SEUL,AH M URE$ .. URES,MARK 5$09 GRANITE HILLS,GRANITE BAY 200407,20 MARK L&9EULAH1M:qR8$1 URES BEUL AH 5989 GRANITE HILLS,GRANITE BAY k SUTTER C6ijNTY' 9000-08-02 ALIAN&KERFti ENGSTROMi ENGSTROM,KRRi, 5651 MADDEt,;.LIVE OAK .. 200046-02 ALIAN&KERRI ENGSTROM ENGSTROM,'ALIAN 8651 MADDEN,LIVE OAK COLUSA COUNTY' a 2=4719 CITY Of WILLIAMS NOR CAL PUMP&WELL S610 E,WILLIAMS !BYi/PWBE/SBE/bBE/1)VBE Subcoxiiractor`and/or'Sugplier`s for New Fire Station#79 for Crockett-Carquinez FRD . Demolition and Abatement of Existing Fire Station Construction of New Fire Station Pre-Fabricated Metal:Building Trades/Servicea:Site Work,Utilities, Electrical Mechanical,Concrete,Interior i�inishes Bid Date: 8.31-00 at 2:00 pra 100%Payement dt Performance Bonds may be required is C2i0CflFlWVA Bay Commercial Contructio'n Inc: AMENTO 3450 Palmer Dr.,Suite 4187,Cameron Park,CA 95682 Contact:Steve license: 668763.'ACRAMENTO " CORDOVA ' �" 'u '($16)608-8600 Fam(916)608-09,71 . ACRAMENTO AT WVE ii€f r . tTO yy+r .: MBEJV EISBE/DBE/D''VBE Subcontractors'and/or`Seip xl rs for GROVE Business,Operations and Maintenence FadiityZipansion E Pinole,CA Bid Date:B-29.06 0 2:00 pm LK GROVE PAMENTO Grimmer Elementary School,Fremont,CA SACRAMENTO Bid Date:8-31-00 0 2:00 pm PRAMENTO SRWTP®Facilities Expansion Project,Phase 0 CORDOVAN Sacramento County Sanitation District,Contract#3518 pm kv AL Bid Date:,8-51-00 0 2:00 pm 18 V s Berkeley Way Mini-Park, lildirCYarB Play Area Renovations ELK GROPE ..Bid Bate:9-500 0 2:00 pm 13X GROVE 11J(3 Ct1,IIID LINDA 100%PWnient&Perfo Bonds maybe mvp*W on5ubcaruUw:W HIGHLANDS .oVer$50,000. Alternativ6.forms of secaarity will be cgonsidere& BRCO Co nBtructors, InC, t4 01iAMER,RIO LINDA CMML"ETA P.O.Box 367,Loomis;CA 95650 'Ucense:.511602 Wy UNd,MATHER Ahs (916)652-3868 FAt.-(9�6)652-;�9'L►`n' ELX GROVE 09/25/2000 11:09 9166060971 BAS' COMMERCIAL CONST PAGE 01 t 15AC'M100AL ^^N �t tTRU"ON, INC .:: .Y AV CA State license x#668763 facsimfle ft-ansmittal To: Barbara Rivera Fax: 1-925-646-1353 From: Laura Meye.r Date: .09-25-00 Re: good Faith Efforts/ Crockett Pages: 8 fire station#'79 FILE Cl Urgent 0 For Review ❑ Please CSI' Please ❑ Please Comment Reply Recycle Included in the fallowing transmittal: Revised summary sheet with letter explaining discrepancies also,dollar value of works self preformed by Bay Commercial. Norte: our intent to utilize local labor farces through the Northern CA Carpenters union. One other sub bid received from Watson Electric we have already forwarded all other bids received to Steve Jordan. Telephone log of.sub contractors contacted via Internet listing provided by Human rights commission via letter received from agency dated 8-16-00. We feel in our advertisement"Bonds may be required" satisfies the assistance of bonding as we did not state"Bands are required"thus turning away interested bidders who could not bond the project while at the same encouraging inquires from certified subcontractors who might be unable to bond or unsure about how to receive bonding.Our goal was to leave the door open and assist in any way to interested bidders. Thank you, Laura Meyer/Secretary Y . • . . Y Y Y Y • Y i i Y 9 • . • . . . Y . i ♦ . i a Mailing Address: 3450 Palmer drive#4 Suite187, Cameron Park, CA 95682 Office location. 12181-A Folsom Blvd., Mancha Cordova, CA 95742 Ph, 916.608.8600 Fx. 918.608.0971 05125/2000 11:09 9166080971 BAY COMMERCIAL CONST „o PAGE 02.._.® SUBCONTRACTOR SUMMARY SHEET FOR THE CROCKET FIRE STATION 71 PROJECT SELECTED RUNNER UP 2ND SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR ABATEMENT MARFIELD COMPANY NO BIDS RECEIVED NO BIDS RECEIVED 1-6104414633 BRIAN NOLTE SlTt3WORKIASPHALT COUZINS ASPHAULT NO 8108 RECEIVED NO BIDS RECEIVED STORM DRAINS I-TOT-251.6058 TERRY WAGNER METAL FABRICATION ACTION IRON WORKS NO BIDS RECEIVEO NO BIDS RECEIVED 1.918-383.7075 BRAD JONES CONCRETGISTEEL COUZIN9 ASPMAULT NO BID$RECEIVED NO BIDS RECEIVED 1.707.251.6050 TERRY WANNER ROUGH CARPENTRY SELF PERFORMING NO BIDS R5CEIVEO NO BIDS RECEIVED SELF PERFORMANCE VALUE 115.748.00 CASEWORK B s K CABINATS CASTLEWOOD CABINETS NO BIDS RECEIVED SACRAMENTO i•707.878.8882 JOHN DOMINGUEZ WATERPROOFING PRINCE PAINTING NO BIDS RECD NO BIDS RECEIVED i-too-80.0093 TOM KIM INSULAT40N SELF PERFORMING NO 6;OS RECEIVED NO BIOS RECSIVtD SELF PERFORMANCE VALUE $3,42A,00 FLASHINGIHVAC CSI NO SIDS RECEIVED NO BIDS RECENEO 1.E08.680.1711 BOSANTHONY SEALANTS SELF PE RFORIAING NO 8108 RECEIVED NO&I D$RECEIVED SELF PERFORMACE VALUE $500.00 DOORS,FRAMES.HARDWARE SELF PERFORMING NO BIDS RECEIVED NO BIDS RECEIVED SELF PERFORMANCE VALUE $11.260.00 METAL,BUILDING Sum BUtLT INC NO BIDS RECEIVEO NO BIDS RECEIVED 1.20&400.1+.00 CERAMIC TILE AAA TILE NO BIDS RECEIVED NO BIDS RECEIVED 1.610.422.2262 CONCRETE SEAL/PAINrING PRINCE PAINTING NO 9106 RECEIVED NO BIDS REOEIVED 1.400.6004663 TOM KIM PLUMBING VIPER MECHANICAL K.S.KRU$E NO BIDS RWEIVED 1.625.427.5547 KRIS KRUSE ELECTRICAL NORTHERN STATES SLAKESLEE NO BIDS RECEIVED 1425-55849 1.707-645.8963 MIKE HENRY DAVID WEINBERG TOILET PARTITIONS WAROA eNTERFRIISES NO BIDS RECEIVED NO BIDS RECEIVED 1.408.276-1337 GAVE WARDA SKYLIGHTS LANE.AIRE NO SIDS RECEIVED NO BIDS RECEIVED SACRAMENTO OVERHEAD DOOR R 8 S ERECTION NO BIDS RECEIVED NO BIDS RECEIVED SANTA ROSA 09'/25/2000 11:09 9166090971 FLAY COMMERCIAL CONST PAGE 03 141 BAY COMMEPrIAL CONSTRU OR INC, Y t t September 25, 2000 Re: Crockett Fire Station No. 79 - Good faith efforts Subject: Summary sheet listings C clarification Attn: Barbara Rivera Please accept the following explanations for the inadvertent clerical errors that occurred during the listing portion of the bid. Lane-Air.: The reason why Bay Commercial Construction, Inc. did not list Lane-Aire on the subcontractor summary sheet as they are a supply only company not a subcontractor. Lane-Aire will be providing the skylights for this project. R & S Erection.: The reason why Bay Commercial Construction, Inc. did not list R & S Erection on the subcontractor summary sheet was an inadvertent clerical error. R & S will be providing and installing roll-up doors for this project. B & K Cabinets.: The reason why Bay Commercial Construction, Inc. did not list B & K Cabinets on the subcontractor summary sheet was an inadvertent clerical error. Castlewood was actually the runner up bidder. The subcontractor list presented at bid time is accurate. ESI.: The reason why Bay Commercial Construction, Inc. did not list ESI on the subcontractor summary sheet was an inadvertent clerical error. ESI will be providing and installing the exhaust system for this project. Vicelle Electric: There is no Vicelle electric, I talked with the individual who actually listed the subcontractors and he explained that the radio transmission became garbled during the subcontractor listing process of the bid and an inadvertent clerical error occurred. The subcontractor summary sheet is accurate in the listing of Northern States Electric, Bay Commercial Construction, Inc. self-performance contract value is $ 30,930.00 of which Bay Commercial Construction. Inc. will be using local work forces from the appropriate union halls as Bay Commercial Construction, Inc. in signatory to the California Carpenters Union. 3450 Palmer Drive#7-187,Cameron Park, CA 95682 Ph. 530.677.9476 Fx. 530.677.9589 3194 Oe La Cruz Boulevard ##8, Santa Clara, CA 95054 Ph.408.727.5772 Fx. 408.727.5725 Lid. #746026 09/25/2000 11:09 9166080972 FLAY COMMERCIAL CONST PAGE 04 ..._ l � 15AY COMMENCIAL1r.,'ur%N5TRUr.*,n,OR INCI I hope that the explanations meat with your approval and we look forward in beginning the project and building not only a quality fire station but also a long lasting relationship with Contra Costa County. SincK, ;Y�e Stesident 3450 Palmer Drive#7-187, Cameron Park, CA 95682 Ph. 530.677.9478 Fx. 530.677.8589 3194 De La Cruz Boulevard #8, Santa Clara, CA 95054 Ph. 408.727.5772 FX.408.727.5725 Lic. #746026 09!25!2000 11:05 5166080371 BAY COMMERCIAL CONST PAGE 05 08!31/2060 13:37 5102' .357 WATSON ELECT INC PARE 01!81 WATSON EL18CT I<..Jr I C. earn.die,nta.5ot�e 'C-tOt=tecWc;r1 'A'Gsnsrat�engbta�r+ny 4934 Montoya Avenin f San Pablo,CA 94817.5-1023 Phone:(510)237.2710 + Fax: (510)237-3357 PROJECT: rLE i LOCATION: f3tt7 DATE, e/o-C�,-Tt,�ME:�. e� _ Watson Est. # ATTENTION; CbMPANY; PHONE: FAX Witwn Eledtic,Inc,is a cortIfled`DBL,6MB>E•enterpfte, is pleased to quote you an the above referenced project,as outlined below: QUOTE FIRM FOR 30 DAYS UNLESS NOTED Perspex °' Degn/bAId: Orawingor - Addendum: :9-- -2- - LP - Olt?OF'F'ER: �� � AL.T 0( Add/Ctteduct �__ C�eciuct: I4 - - ALT 0( }AcldflJedUct Go YES N S NO Aoceft es VC As- ift,ma blue fings Data s � txi U Bonds t3verilrrle n walll,fl of czdlpatclVit X PA—inb-nq canasta colo ch Permi ss `� I _0ofing/chfing Pofs bases 56 -mareget'smMurewi—relsvppon 15,05. Sr only Spoils removal ui went pedr. Tem r rg 'n HVAC eontrolsMi n renctiftmavate/WC Hazardous material Utility fessIcharges a ne P- Wr PULL&en.r oo a sngl BC Fore arm I.,- ta Ire Seals rrtmU.G.spf ce pull booes Special comments: Should a contract be awarded,we reserve the right to modify the agreement to the mutual satisfaction of both pertles,with this document miming parol and parce€of contr&Z Notwithstanding any other previa Ions Of this agreement,we shall not be liable to owner or Contractor for any expermn attributed to delay of this project unless a mutually approved GPM progress schedule Is submitted and maintained by all pertfee concerrat°d. Pages Attached; ( ' ) W ; OS/25/2000 11: 99 9166060971 BAY COMMERCIAL CONST WAGE 06 :. # COMPANY DATE left message RESPONSE NB Drywall 8/23/00 2:15pm no Duos 8/23/00 2:20pm no Pacific Shores 8/23/00 2:21 pm no United Painting&Const. 8/24/00 2:25pm no Valdoff&Peck 8/24/00 2:50pm no Russell Patterson Fainting 8/24/00 3:05pm no Pacific Painting&Deco+DBA 8/24/00 3:32pm no Baca&Sons Painting/Wallcovers 8/24/00 3:45pm no Kin Wo Construction 8/24/2000 3:50pm no Chung ping plumbing disconected 8/24 4:05 no Abbett Electric Corp. 8/24/00 4:15pm no Specialties Corp. 8/25/0012pm no Billiard Acoustics 8/25/00 1 pm no Price Painting&Waterproofing co. 8/25/001:05pm no Magic Painting 8/25/00 1:10pm no Washington Drywall 8125/00 1:12pm no Wisconsin Construction 8125/00 1:14pm no Hanson Elect Cont Group 8/25/00 1:20pm no Yick Electric Co 8/28/00 10:25am denied no Ray Woo&Associates 8/281140 10;27am no answer no Armas Construction 8128100 10:30am no answer no Thunder electric 8/28/00 10:30am no answer no Phoenix Electric 8/28/00 10:31am no GC Electric 8/28/00 10:33am message no KW electric 8/28/00 10:41 am busy no Far East Construction 8/28100 10:41 am no answer no Quality electric 8/29/00 11:48am message no Sun Electric Systems 8/29/00 11:53am message no WL Electric 8/29/00 11:53am out of bus no HD Electric 8/29/00 11:57am disconnect no Urey-W Electrical 8/29/00 11:57am message no Kin Wo Construction 8/29/00 12.09pm disconnect no Rogers Construction CO 8/29/00 12:1Opm no WYL Five Star IndustriesEquip 8/29/00 12:12pm no Raywood &Associates 81.29/00 12:15pm no SJ Engineers 8/29100 12:1 Spm no RT Plumbing 8/29/00 12:18pm no Young's plumbing 8/29/00 12:18pm denied no HC Associated plumbing 8/29/00 12:17pm no Alpha Plumbing CO 8/29/00 12:18pm no JB Roofing CO 8/30/00 12:19pm message no Leong D&S Associates 8/30/00 12:19pm message no Golden State Plumbing 8130/00 12:19pm message no Alpha Bay builders 8/30/00 12:20pm message no 09!25/2000 11:09 9166080971 BAY COMMERCIAL CONST PAGE 07 SNC Plumbing&Fire Protection 8/30/00 12:21 pm no Bleyco Builders inc. 8/30/00 12:21 pm no Pagco Construction CO 8/30/00 12:22pm no Cheri Chocrane elec. 8/30/00 12:22pm message no Advanced flooring Systems inc. 8/30/00 12:23pm denied yes Subcontractors information derived from letter dated 8/16/00 Website is as followes www.ci.sf.cs.us/sfhumanrights 09/2512000 11:09 9156080971 BAY COMMERCIAL CONST PAGE 08 City and County of San Francisca Hu"nlatt Rights Commission Willie Lewis Drawn,Jr, Contract Compliance Mayor flispute Re3ofu11onlFair Housing Minority/WornentLocat Businase Enterprise Lt%Wan Gay Bisexual rransgender 6 HIV Discrimination w >r a� Virginia M. Harmon Intarim Director August ICs,2000 Dear Custonicr/C',lient: Chir Local Minority/Women Business Enterprise Directory is available on the Interact and the address iq as follows: www.et.sf&a.ualaihumjanrlt�ts " At the Human Rights Conmrnision Home Pagc,click on MHEMBE DIRECTORY,Click on I3ROWSH. The screen will open to IY UMBE DTRBCTORY with alphabets from A-Z. Choose the appropriate alphabet. For example;click on E—for Environmental Engineering, or T. ter Trucking. The a(zeen will open to a listing of Environmental Engineering,or Trucking finns with their addresses and telephone numbers, etc. "thank you titin your lxitcrost in the MinoritytWomenlL=al Business Enterpri.ws Program and llireCtesry' ��r U)�, MM �. ��.' LL Sincerely, Romulus Asoi,loo Contract C ornplismce Officer CEIt'1'11=1CATION UNIT RA;DZaij) FO 25'won iv n Avenue TEL(416)252:2500 5 Fr goo FAX(Alla)431-57M 6)2Q-ZIsH5 forn Frendsca TCtt](415}2�E=ru C��liFornlII+J41CY,2-6Q33 w+µtry.d.4}.Ga,uAtS�1tv171�rui0ttl5 091:•26/2000 12:13 5166080972 BAWCIMM PAGE 01 5 A OMECIAL Com . - CA State License#663763 t facsin�e tmismittal To: Barbara Rivera Fax: 1-925-646-1353 From: Laura Meyer Date: 00-24-00 Re: Crockett Pages: fire station#79 • Ce FILE ` • 0 urgent Cn For Review 0 Please 10 Please 0 Please Comment Reply Recycle M26/2000 12:13 9165080972 BAYCOMM PAGE 02 EN-8-140. Of PRINCE PAINTING CO. 3400 De 1A Crux Blvd,,OL,Santa Clara,CA 95054 State Lie.No.601544 Tied:(40M 980-W3•(650)306.0270 Fax.(405)9MOS95 I0 !)9 2 b 0 0 1-800-s$5.1443 pA poziusm TO LaaAa I a Co (916)608-66War 06 08131100 JOB MME ' G4ecket4 Fina Station Compir.te �aen.ar;iay 0111;FA—j AZ 2!1=5 J(A U)"110N fta4tin,zzr CA Saa:Q A+�GtttTlCT DATE 0!`P" Torn Kim 02.00 PO we nasrby auotr+tt rpeclslcaltana rnd wttmatar APPLIEb�AR-EA pts / ... .... _............................................................v........................,, ......... ,.. ..._. r•,,...r. ....................,..,,............,...•...............,,... ..,.,.,.,,.,.r..,.,..... ......, , ......`...... ...I:........;:r.., .. .:.:..::.:.: l: r:f............: .. . C .......:: ..,......•.<., ............. a..�... ,,.........t�..u.....a.,a.:,•.r:.a............a.<.r..r,t,I,s.,'......'r...............�.r.,�.1,.a+..,.l,n.,....e..•...,....+........{�..v,�4.,....,r�...ir•I.r.,,..a...rx. �,r..�:.X..TI...'�.._.�.r..'.,r ................ ..,. ..•.K............................................_,•.......,..__...................a.,... ..._.......... . .. r..........,..,.,......... .......... .. ........ .............. ..r..,,..,.r.......................,......aa.r,.........,.a.......... ...................,,........_......i....,.. ._,..,....................... r..,a,.,................ w...................................................r..................,. ... ...................,................... .........................._........._ . .......4.................r ........................ �,.........._........................0 ...,...........•.,........... .......,............a......,.,.a„a............,........._..........,.,..,.........,,.„...,..........,.......... ...... PREPARATION,.�,,.,,. ....... . ...................,...........,...,,...,... , .,....•....,....,....•.........,..........a.....,...........r ...,..,,........w.,............,.—„•....,........... .....,,...,.,,.......,._. plants.................. ....... .....a....a.........................................................,._............... .,,... •.,....,....,., ,.................,....,.._...,.. .,...,........,........................ a........ PAINTS .....r ...................r....... ....... ..,, .................. 4 ., COLOR: "INCLUDED MATERIAL AND LABOR** PAYMENT _%OPPOSIT REQUIRED PRIOR TO BEGINNING OF WORK.REMAINING EInLANCE TO aE PAID IN LUMP SUM UPON COMPLETION OF ALL WORK AMOUNT' dollws NI maNtlN IK r402 "d td be all spoditd.An work to bo 6omptrerd In a wo0effi trots AtAhortaad momw amor"is s andatd or cMW Ana 61WdW tl dnvflbn fi"eM aeaw rpWkVJcrtr glonatum .. - MtvoMn®sutra cat"o MI!"axomtad only 6Von~order,Md wlll bet"M are rfCtnf, date aver tard abaar the saetrnaia.Ari apwan+M ooMtr ant WW W%ft,A=WOMS Of Nosc Tstla pcoptissl may be dchya MYW aur ewrkol.Owns b oa+ty tm tamada Md MW nacaaenry Insum",pue watkera are uN aQ`rerrby wofw Ows cwyg4 eaaaan msurana, w{Yhdrttum by V41(ttat set t,pted wWtln Yr= tom +e m1gar+a are as ra and tars hWsfjy smeptad.Ybtt We auth*- ,d7ed to="1:-- as owMed,ftyn+e,tt wrtii be made as aLmined above Sipnatura .. bete at 09426/2000 12.13 9166090972 BAYCOMM PAGE 04 Bey Commercial Construction, Inc 'hone quote farm S bcontractor t uppfier l Date{Quote was given «- �-- o supplied quote -- Time quote was taken F08 Yes t No Tax ftludeeyisl No Prevailing Wag Y No�— Union AfCllated Yes If Yes What Local Scope of work: Z&J-- 6L, ,r Total lump sum Cost i 0V2612000 12:13 9166080972 BAYCOMM PAGE 03 Bay Commercial Construction, Inc Phone quote form Subcontra f Supplier J / j� Date Quote was given 42>-a — Lit, Who supplied quote �. Time quota was taken P.m. FOSea No Tax Include Yes No Prevailing Wage -Vt&-#Nv--�° Union Affiliated Yes ! o If Yes What Local — Scope of work: f Total lump sum cost $ / { 09'2612006 12: 13 9166080972 BAYCOMM PANE 05 Bay Commercial Construction, Inc Phone quote farm Suboontractor J Supplier L Date Quote was given ' JJ_ Who supplied quote Time quote was taken :(IV) a.m/'p.m�j Fob es J o Tax Included & o Prevailing Wag Yes No Union Affillated eV No If Yes What Local Scope of work: y 4 Total lump sum cost $ 3926/2000 14:42 9166080971 BAY COMMERCIAL CONST PAGE 01 I 5AY I r10 ON M E cr."Aro I A L ""W^N SM U C T, 14 0 N t I N C �- CA State License#668763 Y facsffiifie trammittal To: Barbara Rivera Pax: 1-925-646-1353 From: Laura.Meyer Date: 09-2-5 W Re: / Crockett Pages: JI<` fixe station#79 • Cid' FILE • • • El Urgent Q For Review ❑ Please Q Please ❑ Please Comment Reply Recycle 1` 03/26/2000 14: 42 9166080971 SAV COMMERCIAL CONST PAGE 02 E S I PAGE 01/01 i2p YOur 0 e Cam August 31, 2000 Bay Come;nsrcial Construction S Z. 12181 Folsom Blvd. Suite A Rancho dordove, CA. 98472 Phn (916608-8600 'Calcont Fax(916)1608-0971 CCL 0422478 Attn: Stevie Re: Cro kett Fire Station ScQpe-O-Wo rkr HVAC pet,plans and specs. $ 18,000.00 Vehicle sihaust per plans and specs: $ 7,494.00 If you have any questions please don't hesitate to call (408) 980-1711. Sincerely; Robert Anthony Design Engineer 3353 DE LA CRU4 BLVD. - SANTA CLARA, CA 95054 TEL.. (408) 980-1711 FAX: (408) 980-0714