Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RESOLUTIONS - 01011998 - 1998-345
CONTRA COSTA COUNTY EXHIBIT B BOARD OF SUPERVISORS Adopted this Resolution on _ _ June 23. 1998 , by the following vote: AYES: Supervisors Uilkema, Gerber, DeSsulnier, Canciamilla, Rogers NOES: None ABSENT: None RESOLUTION NO. 981345 SUBJECT: Authorize the Director of General Services, or Designee, to Complete Application for AB 434 Funds to Assist with the Purchase of Three (3) Alternative Fuel Vehicles The Board of Supervisors of Contra Costa County RESOLVES THAT: WHEREAS, the Bay Area Air Quality Management District (BAAQMD) has requested applications for $9.0 million in Assembly Bill (AB 434) funds to implement projects designed to reduce air pollution from motor vehicle emissions; WHEREAS, Contra Costa County is a leader in the effort to reduce emissions by being one of the first agencies to obtain alternative fuel vehicles, and is an eligible recipient of AB 434 funds; and WHEREAS, adding three (3) alternative fuel vehicles to the County fleet will demonstrate the County's continuing commitment to alternative fuel vehicles and to reducing air polluting vehicle emissions; NOW,THEREFORE, the Board of Supervisors of Contra Costa County does hereby AUTHORIZE the Director of General Services, or designee, to complete a joint application through the "Contra Costa County Clean Fuel Vehicle Demonstration Project" in cooperation with the Contra Costa Transportation Authority (OCTA), the City of San Ramon, and other public agencies to seek BAAQMD funds available under AB 434 for the purchase of alternative fuel vehicles. I hereby certify that the foregoing is a true and correct copy of an Order entered on the minutes of the Board of Supervisors of the date aforesaid. Witness my hand"and Seal of the Board of Supervisors affixed on this 23rd day of June , 1998 PHIL BATCHELOR, Clerk of the Board of Supervisors, and County Administrator By®.11141U ' r` Deputy Cle6 f.grants1AB434Ites.wpd Orig.Dept.: General Services Department(Admin) Contact: Mickey Davis(313-7140) cc: County Administrator Auditor-Controller (RESOLUTION NO. 98/345 TFCA Regional Fund Application Form FY 98 APPLICATION FORM FOR TRANSPORTATION FUND FOR CLEAN AIR REGIONAL FUNDS FY 98 INSTRUMONS Complete Sections 1 through VI for all applications,Also complete the appropriate project information sheet(s) for your project type(see Sections VII through X11). Review Instructions In Part 4 of Application Guidance prior to completing this form. SUSNIMAL Submit two(2)copies of this application form to: Edward Miller, Supervising Environmental Planner BAAQM© 939 Ellis Street San Francisco,CA 94109 All applications must be receiygg by Air District by 5:010 p.m. Tuesday, June 30, 1998. Nand-delivered applications should be delivered to the TFCA, 7th floor, 939 Ellis St., San Francisco. Fax applications will W be accepted. 1. SUMMARY INFORMATION Agency Name: Contra Costa County General Services Department pate of Application: 64-98 Primary Contact Person: Mickey Davis,Administrative Services Officer Phone#(925)313-7100 Fax#(925)3'13-7108 E-mail: MDavl GS.Co.Contra-Costa.Ca.US Address of Primary Contact: 1220 Morrallo Avenue,Suite 200 Martinez,CA 945534711 Secondary Contact Person: Jeanie Rounsaviile Phone#(925)313-7100 E-mail: JRoun@GS.Co.Contra-Costa.Ca.US Name&Title of Person Authorized to Sign Funding Agreement: Mickey Davis,Administrative Services Officer Address(if different from Primary Contact above): Same Type of Project(see pages 1-2 of the Application Guidance): Low Emission Vehicle Demonstration Project Project Title:"Contra Costa County Clean Fuel Demonstration project" General Services Department-CNG Maintenance Vehicles Total Project Cost: $66,000 Amount of TFCA Regional Funding Requested: $30,000 Page 1 TFCA Regional Fund Application Form FY 98 IL Project Description: (Narrative) Contra Costa County has over 160 Maintenance vehicles which service County facilities, service areas and roads throughout the 750 square miles which comprise the County. Our goal is to reduce the County fleet vehicle emissions by replacing three high mileage (80,000+ miles), gas powered vehicles that are between 10 and 12 years old, with three new CNG vans. The new vans will continue to be high mileage vehicles that carry supplies, equipment, tools,and staff to County-wide work locations on a daily basis. The three new CNG dedicated vans will cost a total of$66,000. We are requesting$30,000 in TFCA funds,and the County will contribute$36,000. Project Coal: We hope to verify that CNG vans can reduce emissions while providing the same level of service that we are accustomed to with conventional vehicles. If this demonstration project Is successful, we will consider replacing other vehicles based at the County's Service Center. We will evaluate the CNG vans performance in four main areas: 1. Fuel Economy 2. Maintenance Cost (Scheduled mtc.and emergency repairs) 3. Performance 4. Customer Satisfaction Name all other Participating agencies and describe the role of each agency: Contra Costa Transportation Authority(CCTA)and City of San Ramon Implementation schedule: (Start date,completion data,and key milestones) Start Date (mo/yr)_12/98 Completion Date: (mo/yr)X30 000 Once funding Is approved, the County will follow standard procedures for obtaining bids and the best prices available. We estimate that it will take no longer than 6 months to obtain the new vehicles and place them in service. We plan to evaluate the performance of the vans for 1 year. Milestone Schedule: Date: Milestone Descriptions: September-December, 1998 1. Receive funding approval and order CNG vans. January -May, 1999 2. Receive and place CNG vans In service. June 1999-June 2000 3. Review operational costs for CNG vans and run comparison with conventionally fueled vans. Describe the Implementation area for the project(I.e.,city,county,region): Countywide through out Contra Costa County Page 2 TFCA Regional Fund Application Form FY 88 Ill. BUDGET Provide total project budget, broken out by major categories of costs: i.e. capital costs, operating expenses, personnel, etc. Capital costs and operating costs must be separately identirted. (Budget may be provided on a separate sheet.) cal2iffil Costs Purchase of 3 CNG vans: $66,000 N. FUNDING TFCA Regional Funds(requested) $ 30.QD0 TFCA Program Manager Funds $ Other Funds $ 36.000 Source: General Services Dec rtment $ $ Total Funds $ 66.000 Attach documentation for matching sources of funding. N/A -- TFCA Regional Fund Application Farm FY 98 V. TRANSPORTATION CONTROL MEASURE(TCM)IMPLEMENTATION(EVALUATION CRITERION#5) THE PURPOSE OF EVALUATION CRITERION #5 IS TO ENCOURAGE AGENCIES TO ADOPT POLICIES AND PROGRAMS TO IMPLEMENT THE TCMS IN THE CLEAN AIR PLAN. THE TCMS ARE SUMMARIZED IN TABLE 3 IN THE APPLICATION GUIDANCE. TO APPLY FOR POINTS FOR TFCA CRITERION #5, COMPLETE THE SECTION BELOW. CHECK THE BOX FOR EACH TCM THAT YOUR AGENCY IS IMPLEMENTING. FOR EACH BOX CHECKED, PROVIDE, IN A SEPARATE ATTACHMENT;A BRIEF PARAGRAPH DESCRIBING THE POLICIES AND ACTIONS THAT YOUR AGENCY HAS TAKEN TO IMPLEMENT THE TCM. TCM 1 SUPPORT VOLUNTARY TRIP REDUCTION PROGRAMS TCM 3 IMPROVE AREAWIDE TRANSIT SERVICE TCM 4 IMPROVE REGIONAL RAIL SERVICE }., TCM 5 IMPROVE ACCESS TO RAIL AND FERRIES TCM 6 IMPROVE INTERREGIONAL RAIL SERVICE Q TCM 7 IMPROVE FERRY SERVICE TCM 8 CONSTRUCT CARPOOLIEXPRES5 BUS LANES ON FREEWAYS TCM 9 IMPROVE BICYCLE ACCESS AND FACILITIES Q TCM 10 YOUTH TRANSPORTATION TCM 11 INSTALL FREEWAY/ARTERIAL TRAFFIC OPERATIONS SYSTEMS Q TCM 12 IMPROVE ARTERIAL TRAFFIC MANAGEMENT Q TCM 13 TRANSIT USE INCENTIVES TCM 14 TRIP REDUCTION SERVICES TCM 16 LOCAL CLEAN AIR PLANS,POLICIES,AND PROGRAMS TCM 16 INTERMITTENT CONTROL MEASURE/PUBLIC EDUCATION Q TCM 17 CONDUCT DEMONSTRATION PROJECTS Q TCM 18 IMPLEMENT TRANSPORTATION PRICING REFORM TFCA Regional Fund Application Form FY 98 Q TCM 19 PEDESTRIAN TRAVEL Q TCM 20 PROMOTE TRAFFIC CALMING MEASURES SEE ATTACHED Page 6 TFCA Regional Fund Application Form FY 99 VI. CHECKLIST (PROVIDE DOCUMENTATION AS NOTED) yu A. HAVE YOU DISCUSSED YOUR APPLICATION WITH THE AIR DISTRICT LEAD COMPACT FOR YOUR PROJECT TYPE?(SEE APPUCA77oN GUIDANCE,PAGE 5 FOR CONTACT LIST.) S. HAVE YOU ATTACHED THE REQUIRED RESOLUTION FROM YOUR GOVERNING BOARD AUTHORIZING THE SUBMITTAL OF YOUR APPLICATION AND IDENTIFYING THE INDIVIDUAL AUTHORIZED TO SUBMIT AND CARRY OUT THE PROPOSAL? C. HAVE YOU ATTACHED DOCUMENTATION FOR ALL MATCHING FUNDS THAT WILL BE APPLIED TO THE PROJECT? D. WILL THE PROJECT BENEFIT ECONOMICALLY DISADVANTAGED COMMUNITIES? . (SEE APPuCA77ON GUIDANCE,EVALUATION CRITERION 4.) IF YES,PROVIDE DOCUMENTATION. E. FOR BICYCLE PROJECTS,IS THE PROJECT INCLUDED IN A COUNTYWIDE BICYCLE PLAN OR COUNTY CONGESTION MANAGEMENT PROGRAM? (BEE POLICY#29 IN APPLICATION GUIDANCE.) IF YES,PROVIDE DOCUMENTATION. APPLICANTS FOR SHUTTLE PROJECTS(ONLY)MUST COMPLETE QUESTIONS F,G,AND H BELOW: F. IS YOUR SHUTTLE APPLICATION ACCOMPANIED BY LETTERS OF SUPPORT FROM ALL POTENTIALLY AFFECTED PUBLIC TRANSIT AGENCIES? (BEE POLICY#28 IN THE APPLICA770N GUIDANCE.) G. AMERICANS WITH DISABILITIES ACT(ADA)REQUIREMENTS:(SEE APPLJCA770N GUIDANCE PAGE 20) 1. DOES THE SHUTTLE/FEEDER BUS PROVIDING THE SERVICE MEET THE ADA VEHICLE STANDARDS FOR WHEELCHAIR ACCESSIBILITY? 2. IS THERE COMPARABLE PARATRANSIT SERVICE PROVIDED TO ELIGIBLE INDIVIDUALS WITH DISABILITIES? SUPPLEMENTARY PROJECT INFORMATION SHEETS FOLLOW ON PAGES 6-13 OF THIS APPLICATION FORM. COMPLETE AND ATTACH THE APPROPRIATE SHEET(S)FOR YOUR PROJECT TYPE,AS FOLLOWS: RIDESHARING PROJECTS- SECTION VIl SHUTTLE AND FEEDER BUS PROJECTS- SECTION VII&SECTION VIII REGIONAL TRANSIT INFORMATION PROJECTS- SECTION VII RAIL-BUS INTEGRATION PROJECTS- SECTION VII ARTERIAL MANAGEMENT&SIGNAL TIMING PROJECTS - SECTION IX(PARTS 1.2) TRANSIT BUS TRAFFIC SIGNAL PREEMPTION PROJECTS - SECTION IX(PART 3 ONLY) BICYCLE PATHS,LANES AND ROUTES- SECTION X BICYCLE RACKS AND LOCKERS- SECTION XI TRANSIT AND SCHOOL BUS REPLACEMENTS- SECTION X11 LEAN AIR VEHICLE DEMONSTRATIONS- SECTION XII(INCLUDING CLEAN AIR VEHICLE INVENTORY) TFCA Regional Fund Application Form FY 98 X11. SCHOOL AND TRANSIT BUS REPLACEMENT/CLEAN AIR VEHICLE DEMONSTRATION PROJECTS Provide the following information for school and transit bus replacements, and dean air vehicle demonstrations. Also, for clean air vehicle demonstration projects, complete the attached Clean Air Vehicle Inventory—see next page. Note:Applicants must complete a separate application form for each fuel type(i.e.natural gas only,electric vehicles only) &ad for each of the following categories of vehicles: 1) light and medium vehicles; 2) school buses, 3) transit buses; 4) heavy duty vehicles(other than buses),and S)other vehicle types(e.g.parking enforcement vehicles,small utility vehicles etc.). For example, a project sponsor seeking funding for a light duty electric vehicle, a light duty natural gas vehicle,and a heavy duty natural gas vehicle will need to submit three applications. 1. Are you a previous recipient of a grant for clean alr vehicles from the Air District, including any County Program Manager fund grants? NX YEA NO K yes,list the project number(s),and describe the number and type(*)of vehicle(s)acquired. 1994-BAAQMD funds for two ZEV carts 97CC21 CNG Vehicle Demonstration Project-2 CNC Ford Cargo Vans in service effective 3/19198 97CC25 CNG Replacement Vehicles for the Sheriff- 2 CNC Crown Victorias on order. 97CC26 CNG Fast Fuel Tube Trailer-Installed and operational at CSD Service Center,2467 Waterbird Way 2. Indicate where you plan to refuellrecharge the vehicles Identified In this grant application. Indicate whether the refueling/recharging facility Is new or existing. If It Is a new facility, indicate how the facility will be financed. Is the facility(will It be)accessible to Public Agencies? " YES NO If yes, describe the public access. The vehicles will be fueled at the existing CNG fast fuel unit at the GSD Service Center, 2467 Waterbird Way. 3. indicate the vehicle retirement option you w11i use should your application receive TFCA funding. (Vehicle retirement options are described in Policy 023 in the Application Guidance.) YES: OPTION A OPTION B 4. indicate the make, model, year, odometer reading, and average annual mileage for each vehicle that an Air District grant would replace.(The Air District requires disposal of one like vehicle for each new vehicle purchased using TFCA grant funds.) Fill In the"Expected Vehicle Sale Amount" only If you checked"OPTION B"in 03,above. Vehlciles to be Re laced ^ Make Model Year Odometer Average Annual Expected Reading Mileage Vehicle Stale Amount Ford Pickup Ranger 1988 104,689 18,469 81,000.00 Fond Pickup Ranger 1986 81,763 6,814 $1,000.00 Ford Astro(cargo van) 1987 101,130 9,194 $1,000.00 TFCA Regional Fund Application Form FY 98 5. indicate the make and model, fuel type, estimated life, and estimated annual miles for each vehicle that you plan to acquire. If estimates of life and annual mileage are different than the actual mileage and life of the vehicle(s)being replaced,explain why. For heavy duty vehicles, indicate the engine manufacturer and engine size. Note: If more than one make/model of vehicle is available in the vehicle type that you plan to acquire, and you have not determined which maketmodel you plan to acquire,list each make/model of vehicle available. You may only list vehicles that comply with TFCA Policy#22(see the Application Guidance). Vehicles to be Acquired Number of Macke Model Fuel Type Engine Engine Estimated Average Annual Vehicles Maker Size(liters) Life(Yrs) Mileage 3 Ford E250 CNG 8 Yrs. 12,000 (Van) CLEAN AIR VEHICLE INVENTORY Applicants for clean air vehicle demonstrations must complete this section. This section is a required for clean fuel school and transit bus replacement projects. Number of Clean Air Vehicles In Fleet` Vehicle Total Number of Electric Natural Gas Natural Gas Propane Type by Vehicles in Each Vehicles Vehicles Vehicles Vehicles/ Weight' Weight Classb (dedicated) bi=fuel Other Fueled 1 655 1 2 2 250 2 3 95 4 22 L- a. The weight categories are as follows: 1) Up to 5,750 pounds gross vehicle weight(light-duty automobiles and trucks) 2) 5,751 to 14,000 pounds GVW(medium-duty vehicles) 3) 14,001 pounds and above GVW(heavy-duty vehicles) 4) Other vehicles(parking enforcement, utility carts,etc.) " b. Include the total number of vehicles In the fleet by weight class. School and transit buses should not be included in this table. C. Include In these columns the total number of clean air vehicles In the fleet by weight class. These columns should include vehicles In the fleet,on order,or for which funding has been received but not yet spent. d. Please specify fuel type for these vehicles. ATTACHMENT 1 CONTRA COSTA COUNTY Transportation Control Measure(TCM)Implementation Actions TCM 1: Support Voluntary Trip Reduction Programs. County General Plan Goal -J. To reduce single occupant auto commuting. General Plan Po icy 5-22.Use of alternative forms of transportation,especially transit,shall be encouraged in order to provide necessary services to transit-dependent persons and to help minimize automobile congestion and air pollution. o AjaC r� Pl1W Implementation Ma=.,5nn. Enforce County TDM Ordinances consistent with State law,and encourage neighboring jurisdictions to adopt similar ordinances. Coup „ Ordinance No, 97-12. An ordinance of the Country of Contra Costa repealing Ordinance Number 984-27, and adopting new policies purposes, goals and objectives for Transportation Systems Management. 02LO,619-0--Bgard Order adopted by the Cou_n_ty Board of Sla;sMAsors establishing the County Employee Transportation System Managment Program and Incentives. 09127/97 Board of Supervs�ors proclaimation for "Back to Transit-Week" TCM 3: Improve Areawide Transit Service. County eneral Plan Goal 5-1. To encourage use of transit. CoMly GenerW Plan Policy 520. New subdivisions should be designed to permit convenient pedestrian access to bus transit and efficient bus circulation patterns. CmaU Genes].Plan Policy 5.23. Improvement of public transit shall be encouraged to provide for increased use of local,commuter and intercity public transportation. County CCneral Plan Implementation Measure 54, Reserve rights-of-way to ensure compatibility with transit service in the design of development on appropriate freeway expressway,arterial and collector routes. CgUta General Plan J lementW on Mea_=5-n. Coordinate efforts with all transit district service the county to provide for improved routing,bus frequencies,facilities,and improved design of land development plans. TCM 4: Improve Regional Rail Service. County General Plan_ Policy 5-24. Rail transit extensions including protection and acquisition of necessary right-of-way and station areas shall be encouraged along all freeway corridors. County General Plan Implementation Measure 5-q. Encourage and coordinate efforts with BART to extend train service along State Route 4 to Brentwood and along I-80 to northwestern Contra Costa County. -1- Coup , General Plan Implementation Measure 5-1. In cooperation with interested local jurisdictions, transit agencies,and transit operators,conduct a study investigating the feasibility of implementing commuter rail,urban rail and other regional transit services within the Transit Corrdiors identified in the Transit Network Plan. TCM 5; Improve Access to Rail and Ferries. oUn ,CeD&W Plan Policies for the Pleasant Hill BART Station Area 3-126(al. Increase the concentration of high intensity employment uses and affrodable housing in the area to better utilize the regional transit accessibility provided by BART. TCM 6. Improve Interregional Rail Service. CooUM General Plan Implementation Measure 5-ae. Support the establishment and operation of commuter transit services,serving the Transit Corridors identified int he Transit Network Plan,with emphasis on service to majro employment centers and transit stations. Co ,M Q=eral Plan lmlemenetat on Mm= 5-af. Participate in studies and impelementation efforts to improve intercity transit service between Contra Costa County and other counties. TCM 8: Contruct Carpool/Express Bus Lanes on Freeways. CauW General Plan Police 5-26. Rail transit facilities or additional high occupancy vehicle lanes propoesed within a designated transit corridor shall be considered consistent with this General Plan. o untyC•gneral Plan Jmplementition Measure 5-ab. Encourage Caltrans to construct a system of commuter lanes(HOV lanes)on new or expanded freeways within the Transit Corridors identified on the Transit network Plan, and work with the cities and Caltrans in establishing additional commuter lanes on new or expanded expressways and regional arterials. TCM 9: Improve Bicycle Access and Facilities. Coon , General Plan Goal 5-L. Improve the opportunities for bicycle use in Contra Costa County for transportation as well as recreational purposes. + gin , Creneral Plan Policy 5-13. Physical conflicts between vehicular traffic, bicyclists, and pedestrians shall be minimized. oUn General Plan_ Policy 5-25, Planning and provision for a system.of safe and convenient pedestiran ways,bikeways and regional hiking trails shall be continued as a means of connecting community facilities,residential areas,and business districts,as well as points of interest outside the communities utilizing exisitrig public and semi-public right-of=way. Co= C,eneral Plan ImnlemcnuWon Mca_=5-x. Construct the bikeways shown in the future Bikeway Network Plan and incorporate the needs of bicyclists in major roadway construction projects and normal safety and operational improvements. 03/12/96 Resolution of 2z Cgi ty Boud of Su2er1jaors adQZcd in support of the Countywide Bicycle Action Program. -2- 01/06/98 Board Order of the Count/ Board of Supervisors � �r cr vine contract with Michael E. Jackson for Countywide Bicycle Facility Coordinator. TCM 11: Install Freeway and Arterial Traffic Operations Systems. CouajyQj=ral Plan Implementation Measure 5-z. Encourage Caltrans to investigate the feasiblity and effectiveness of ramp metering on freeways in the County and,if feasible and effective,support implementation. County General Plan Implem mtation Measure aa. Encourage Caltrans to expedite the incorporation of Alameda,Contra Costa and Solano County into the Bay Area Traffic Contral System Program to improve the flow of traffic on the region's freeways. TCM 14 Trip Reduction Services. 04/14/98 Board Order of the Q=t/Board of Str2cndsors approving an agreement with the Contra Costa Centre Association to manage the Transporation Demand Mangement Program for the Pleasant Hill BART Station area during 1998-99. TCM 15: Local Clear Air Plans,Policies and Programs. o t VGeneral Plan Section 8.14 (pages 8-73 to 8-82). Addresses "Air Resources" and includes specific goals,policies and implementation measures. TCM 16: Intermittent Control Measure/Public Education. 04/14/98 Board Order of the Co=t/Bo d of Sjervisgrs authorizing participation in Spare the Air Program for 1998. tfcatcros.t5 CCC General Services Department -3-