THE BOARD OF SUPERVISORS
CONTRA COSTA COUNTY,CALIFORNIA
Adapted this Order of June 24, 1997 by the following vote:
AYES: Supervisors Rogers, Uilkema, Gerber, Canciamilla, DeSaulnier
NOES: None
ABSENT: None
RESOLUTION NO. 97/348
SUBJECT: Approving Plans and Specifications for
Waterproofing Exterior Walls at West County Detention Facility
5555 Giant Highway,Richmond
(CP#97-43)
Budget Line Item No. 4411-4120
Authorization No. 0928-WH120B
WHEREAS plans and specifications for Waterproofing Exterior Walls at West County
Detention Facility 5555 Giant Highway, Richmond, have been filed with the Board this day by
the Director of General Services; and
WHEREAS plans and specifications were prepared by the Architectural Division; and
WHEREAS the cost estimate for the initial construction contract is $101,000.00, Base Bid
only; and
WHEREAS the Board has obtained the general prevailing rates of wages, which shall be
the minimum rates paid on this project; and
WHEREAS the Board hereby finds that the project is exempt from Environmental Impact
Report requirements as a Class 1d Categorical Exemption under County Guidelines and directs
the Director of Community Development to file a Notice of Exemption with the County Clerk;
TT IS BY THE BOARD RESOLVED that said plans and specifications are hereby
APPROVED. Bids for this work will be received on July 24, 1997 at 2:00 p.m., and the Clerk
of this Board is directed to publish a Notice to Contractors in accordance with Section 22037 of
the Public Contract Code inviting bids for said work, said Notice to be published in
Contra Costa times . The Director of General Services is
directed to mail notices to the construction trade journals specified in Section 22036 of the Public
Contract Code at least 30 days before the date of opening the bids; and
IT IS FURTHER RESOLVED that the Director of General Services, or his designee, is
AUTHORIZED to issue bid Addenda, as needed, for clarification of the contract bid documents,
provided the involved changes do not significantly increase the cost estimate for the inif
construction contract.
1 hera�oertlry thet tttk t.a trt»tw+d oon�d�Ipy et
rn actron taken end entered on the minaret 610
r0ard 01 Bupervtaore an the date shown.
p, T,yag _7A 1 QQ 7
PHIL BATCHELORax==
Clerk of Me board
d superNew end AdrNnMebale►
Orig. Dept.: General Services Dept. -Architectural Division
cc: General Services Department
Architectural Division �-
G.S. Accounting
File: 135-9701/A.5
Auditor-Controller
Community Development
Dennis Barry
Sheriff-Coroner(Via A.D.)
HAI 997\1 35970 1 MOO IO2B.WPD
GBAs