Loading...
HomeMy WebLinkAboutRESOLUTIONS - 01011969 - 96-432 IN THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, STATE OF CALIFOF?NIA In the Matter of Approving Plans ) and Specifications for } Retaining Structures along San Pablo } RESOLU'T'ION' NO. 69/432 Creek on the south side of El Portal } Drive, San Pablo Area, } Project No. 0871-4145-65(i3 . } WHEREAS Plans and Specifications for the construction of retaining structures along San Pablo Creek on the south side of El Portal Drive between Church Lane and Fordham 'Street, San Pablo area, have been filed with this Board this clay by Mr. Victor W. Sauer, Public Works Director and WHEREAS the general prevailing rates of wages, which shall be the minimum rates paid on this project, have been approved by this Board; NOW, THEREFORE, IT IS BY THIS BOARD RESOLVED that said Plans and Specifications are hereby APPROVED. Bids for this work will, be received on ._August 5, pgq at 1 „A.M. , and the Clerk of this Board is directed to pub ish Notice to Contractors in the manner and .for the time required by lax, inviting bids s/��for j(}said work, said Notice to be published in the f' SAN flr3�Q . PASSED AND ADOPTED on - July 8 , 1911_, by the following vote: AYES: Supervisors J. P. Kenny, A. M. Elias, T. J. Col 1 , J . E. Moriarty. NOES: None. ABSENT: Supervisor E. A. LEnscheid. RESOLUTION NO. 69/432 Form #9 (S. & H. Code- 1072, 1326) (Gov. Code 25451, 25452) 67-3-500 .......................................... ... ...............................