Loading...
HomeMy WebLinkAboutMINUTES - 01132009 - C.01 r TO: BOARD OF SUPERVISORS ' ....... Contra FROM: JULIA R. BUEREN, Public Works Director ,; ;°. s Costa DATE: January 13, 2009 °°s , �o� �y Count / SUBJECT: APPROVE Project Contingency Fund Increase and execute Contract Change Order No. 2 for the San Pablo Dam Road Rehabilitation project, EI Sobrante area. (District I) Project No. 0662-6R4148-08 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: APPROVE the San Pablo Dam Road Rehabilitation Project contingency fund increase of$1,500,000 for a new contingency fund amount of $1,711,119.21 effective January 13, 2009, and APPROVE and AUTHORIZE the Public Works Director, or designee, to execute Contract Change Order No. 2 with Ghilotti Bros., Inc., effective January 13, 2009, in an amount not to exceed $1,334,050.49, to a new payment limit of $3,822,311.31 for increased quantities of pavement failure repairs, EI Sobrante area. (9.9 % Surface Transportation Program (STP) funds, 27.5 % Proposition 113 funds, 61.0 % Measure C funds, and 1.6 % City of Richmond funds) (District I) Project No. 0662-6R4148-08. FISCAL IMPACT: The Project contingency funds are currently insufficient to cover the increased cost. The increase in contingency funds will be funded by 9.9 % Surface Transportation Program (STP) funds, 27.5 % Proposition 1B funds, 61.0 % Measure C funds, and 1.6 % ity of Rich d funds. Continued on Attachment: ® SIGNATURE: L=L L_. /RECOMMENDATION OF COUNTY ADMINISTRATOR ❑ RECOM N TIO OARD COMMITTEE APPROVE F-1OTHER SIGNATURE(S): �A1 -- -- t/,{�I,gQ.tmlUA ACTION OF BOARD ONGt.Ci�..ty- �� �C.�� 9 APPROVED AS RECOMMENDED ❑ THER 0 I hereby certify that this is a true and correct copy of an VOTE F SUPERVISORS action taken and entered on the minutes of the Board of f� UNANIMOUS (ABSENT ) Supervisors on the date shown. AYES: NOES: ABSENT: ABSTAIN: ATTESTED: G:\Const\BO\2009\1-13-09 SPDR Rehabilitation Contingency Fund Increase& DAVID TWA, CO&of the Boar&ff Supervisors and County CCOn2.doc Administrator KE:kg Orig. Div: Public Works(Construction Division) Contact:Kevin Emigh (925/313-2233) cc: County Administrator By Deputy Auditor-Controller Public Works Design J. Dowling,Construction P. Denison, Finance Ghilotti Bros.,Inc. SUBJECT: APPROVE Project Contingency Fund Increase and APPROVE and AUTHORIZE the Public <, Works Director, or designee, to execute Contract Change Order No. 2 for the San Pablo Dam Road Rehabilitation Project, EI Sobrante area, (District I). Project No. 0662- 684148-08. DATE: January 13, 2009 PAGE: 2 of 2 REASONS FOR RECOMMENDATIONS AND BACKGROUND: Additional funding is required to increase the contract contingency amount to pay the contractor for additional quantities of necessary pavement repairs prior to placement of the surface treatment portion of the project. Extensive repairs were required in excess of the original quantities anticipated for the project. These repairs were necessary to prepare the roadway for placement of the surface treatment in order to maximize the effectiveness of the treatment. The Department has determined that the use of these funds at this location is the highest priority use of the funds at this time. Approval of the contingency fund increase is required to compensate the contractor for the work. CONSEQUENCES OF NEGATIVE ACTION: The lack of approval would prevent successful completion of this contract and preclude payment to the contractor for required work.