Loading...
HomeMy WebLinkAboutMINUTES - 11182008 - C.87 TO: BOARD OF SUPERVISORS, AS GOVERNING '`''�—�`, �`�=__'�; Contra BOARD OF THE FLOOD CONTROL &WATER CONSERVATION DISTRICT Costa x, wiz FROM: JULIA R. BUEREN, CHIEF ENGINEER C o n ty .v �/ 11 DATE: November 18, 2008 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts II & IV) Project No. 7520-6138345 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on April 10, 2007, pursuant to Public Contract Code Sections 22035 and 22050, to implement the Lower Walnut Creek Interim Protection Measures project, Pacheco area. FISCAL IMPACT: The total estimated contract cost is $8,500,000, funded by Flood Control Zone 3B Funds. C NTINUED ON ATTACHMENT: K SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RFR16MMENDATIO F BOARD CO2 E - APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON �0� 2 APPROVED AS RECOMME DED O#R VOTE OF SUPERVISORS: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED N UNANIMOUS(ABSENT ) ON MINUTES OF THE BOARD OF SUPERVISORS ON AYES: NOES: THE DATE SHOWN. ABSENT: ABSTAIN: . Contact: Greg Connaughton(925)313-2271 GC:PD:cw �►r�pgn 1 g 2�g G:\FldCtl\Board Orders 2005 Onward\2008 BO\Lower Walnut Creek Emergency ATTESTED V p/►�w I BO I1-18-08.docx DAVID TWA,CLERK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR cc: County Administrator Auditor—Controller V Public Works: Julia R.Bueren,Chief Engineer BY: R.Mitch Avalon,Deputy Chief Engineer ' DEPUTY Kevin Emigh,Construction Greg Connaughton,Flood Control Paul Detjens,Flood Control SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts II& IV)Project No. 7520-6B8345 DATE: November 18, 2008 PAGE: 2 of 2 REASONS FOR RECOMMENDATIONS AND BACKGROUND: A. On April 10, 2007, the Board of Supervisors declared an emergency and authorized the Chief Engineer to proceed in the most expeditious manner to repair or replace the Lower Walnut Creek flood control facility as directed by the US Army Corps of Engineers. B. Repair status: The Contra Costa County Flood Control and Water Conservation District (District) prepared the Lower Walnut Creek Corrective Action Plan (CAP) and presented it to the US Army Corps of Engineers for consideration on June I1, 2007. The CAP contained two phases of work. The first phase of the project included significant sediment removal and levee reconstruction and was completed in early December 2007. The US Army Corps of Engineers approved both phases of the CAP on May 19, 2008. The second phase of work included levee reconstruction at selected locations near the confluence of Walnut and Grayson Creeks. This Phase 2 work was substantially completed in October 2008. The remaining tasks are focused on mitigating the impacts of both phases of work. Specifically, this includes adjusting topography in reconstructed marsh areas to reduce mosquito.habitat and revegetating and monitoring areas disturbed by both phases of work. These follow up tasks are expected to be complete in spring 2009. CONSEQUENCES OF NEGATIVE ACTION: Nonconcurrence with the above recommendation may significantly delay implementation of the remaining CAP work in Lower Walnut Creek flood control facility and prevent the District from meeting the correction schedule required by the US Army Corps of Engineers.